Detail Letting Schedule for Cameron County (FY 2014)
| Cameron County (FY 2014) |
CCSJ: 0039-06-041 | |||
| District: | Pharr | Let Date: | MAY 2014 |
| Highway: | BU 83-S | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 0039-06-041 |
| Description: | IMPROVE DRAINAGE STRUCTURES & OUTFALL | Handling Code: |
|
| Limits From: | NORTH OF BUS 83,NEAR FM 2556 | Fund Cat: | 11 |
| Limits To: | S. TO FLOODWAY | Estimate: | $1,551,108 |
| Length: | 0.1 Miles | Actual: | |
|
Back... |
Totals for 0039-06-041 | ||
|---|---|---|---|
| Length: | 0.1 Miles | ||
| Estimate: | $1,551,108 | ||
| Actual: | |||
CCSJ: 0039-09-059 | |||
| District: | Pharr | Let Date: | JAN 2014 |
| Highway: | US 77 | Let Status: | Tentative |
| Project ID: | RW 39-9-59 | CSJ: | 0039-09-059 |
| Description: | ACQUISITION & ADJUSTMENT OF UTILITIES | Handling Code: |
|
| Limits From: | @ FM 3248 | Fund Cat: | ROW |
| Limits To: | . | Estimate: | |
| Length: | 0.1 Miles | Actual: | |
|
Back... |
Totals for 0039-09-059 | ||
| Length: | 0.1 Miles | ||
| Estimate: | |||
| Actual: | |||
CCSJ: 0039-16-063 | |||
| District: | Pharr | Let Date: | JUN 2014 |
| Highway: | US 77 | Let Status: | Tentative |
| Project ID: | NH ( ) | CSJ: | 0039-09-058 |
| Description: | ADD RIGHT TURN LANE | Handling Code: |
|
| Limits From: | @ FM 3248 | Fund Cat: | 3 |
| Limits To: | . | Estimate: | $250,000 |
| Length: | 0.1 Miles | Actual: | |
| District: | Pharr | Let Date: | JUN 2014 |
| Highway: | US 77 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 0039-16-063 |
| Description: | RAMP IMPROVEMENTS | Handling Code: |
|
| Limits From: | FM 802 | Fund Cat: | 3 |
| Limits To: | MORRISON RD | Estimate: | $1,000,000 |
| Length: | 1.3 Miles | Actual: | |
|
Back... |
Totals for 0039-16-063 | ||
| Length: | 1.4 Miles | ||
| Estimate: | $1,250,000 | ||
| Actual: | |||
CCSJ: 0331-01-040 | |||
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | US 77 | Let Status: | Tentative |
| Project ID: | NH ( ) | CSJ: | 0039-07-241 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | LP 499 | Fund Cat: | 1 |
| Limits To: | SP 54 | Estimate: | $141,085 |
| Length: | 2.1 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | US 77 | Let Status: | Tentative |
| Project ID: | NH ( ) | CSJ: | 0039-07-242 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | SH 107 | Fund Cat: | 1 |
| Limits To: | BUS 77-X | Estimate: | $107,424 |
| Length: | 1.3 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | SH 4 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 0039-10-075 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | YOLANDA RIO ROAD | Fund Cat: | 1 |
| Limits To: | END STATE MAINTENANCE | Estimate: | $408,106 |
| Length: | 14.9 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | BU 77-X | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 0327-08-087 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | US 77 SB FRONTAGE | Fund Cat: | 1 |
| Limits To: | SH 107 | Estimate: | $69,244 |
| Length: | 1.7 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | BU 77-W | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 0327-11-001 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | CAMERON/WILLACY COUNTY LINE | Fund Cat: | 1 |
| Limits To: | US 77 SB FRONTAGE | Estimate: | $47,881 |
| Length: | 1.1 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | SH 100 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 0331-01-040 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | 0.138 MI EAST OF US 77 | Fund Cat: | 1 |
| Limits To: | FM 803 | Estimate: | $283,033 |
| Length: | 3.3 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 508 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 0342-04-030 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | US 77 NB FRONTAGE | Fund Cat: | 1 |
| Limits To: | FM 106 | Estimate: | $353,601 |
| Length: | 9.0 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 490 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 0860-02-012 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | FM 88 | Fund Cat: | 1 |
| Limits To: | FM 1015 | Estimate: | $68,346 |
| Length: | 2.5 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | SP 413 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 0872-01-015 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | BUS 77-W | Fund Cat: | 1 |
| Limits To: | US 77 SB FRONTAGE | Estimate: | $16,754 |
| Length: | 0.3 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 802 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 1140-01-020 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | US 77/83 SB FRONTAGE | Fund Cat: | 1 |
| Limits To: | US 281 (MILITARY) | Estimate: | $146,151 |
| Length: | 2.2 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 802 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 1140-03-017 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | 0.0417 MI EAST OF SH 48 | Fund Cat: | 1 |
| Limits To: | FM 511 | Estimate: | $86,028 |
| Length: | 1.4 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 490 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 1430-01-023 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | FM 1015 | Fund Cat: | 1 |
| Limits To: | FM 1425 | Estimate: | $87,975 |
| Length: | 3.2 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 1575 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 1505-01-014 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | FM 510 | Fund Cat: | 1 |
| Limits To: | SH 100 | Estimate: | $156,727 |
| Length: | 4.0 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 1847 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 1801-01-047 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | 0.197 MI SOUTH OF SH 550 | Fund Cat: | 1 |
| Limits To: | FM 3248 | Estimate: | $141,253 |
| Length: | 1.9 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 1847 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 1801-02-015 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | 0.035 MI SOUTH OF FM 106 | Fund Cat: | 1 |
| Limits To: | FM 510 | Estimate: | $165,533 |
| Length: | 6.0 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 509 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 2369-01-022 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | FM 1595 | Fund Cat: | 1 |
| Limits To: | FM 106 | Estimate: | $76,040 |
| Length: | 1.8 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 509 | Let Status: | Tentative |
| Project ID: | STP ( ) | CSJ: | 2369-01-023 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | FM 508 | Fund Cat: | 1 |
| Limits To: | FM 1595 | Estimate: | $56,432 |
| Length: | 2.2 Miles | Actual: | |
|
Back... |
Totals for 0331-01-040 | ||
| Length: | 58.9 Miles | ||
| Estimate: | $2,411,613 | ||
| Actual: | |||
CCSJ: 0921-06-207 | |||
| District: | Pharr | Let Date: | JUL 2014 |
| Highway: | VA | Let Status: | Tentative |
| Project ID: | BOR 2002(631) | CSJ: | 0921-06-207 |
| Description: | CONSTRUCTION OF BORDER SAFETY INSPECTION FACILITY (BSIF) | Handling Code: |
|
| Limits From: | LOCATED IN VICINITY OF GSA FACILITY | Fund Cat: | 11 |
| Limits To: | BROWNSVILLE/LOS TOMATES | Estimate: | $6,583,003 |
| Length: | 0.0 Miles | Actual: | |
|
Back... |
Totals for 0921-06-207 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $6,583,003 | ||
| Actual: | |||
CCSJ: 0921-06-208 | |||
| District: | Pharr | Let Date: | JUL 2014 |
| Highway: | VA | Let Status: | Tentative |
| Project ID: | BOR 2002(633) | CSJ: | 0921-06-208 |
| Description: | CONSTRUCTION OF BORDER SAFETY INSPECTION FACILTY (BSIF) | Handling Code: |
|
| Limits From: | LOCATED IN VICINITY OF GSA FACILITY | Fund Cat: | 11 |
| Limits To: | LOS INDIOS FREE TRADE INT'L BRIDGE | Estimate: | $5,512,635 |
| Length: | 0.0 Miles | Actual: | |
|
Back... |
Totals for 0921-06-208 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $5,512,635 | ||
| Actual: | |||
CCSJ: 0921-06-226 | |||
| District: | Pharr | Let Date: | JUL 2014 |
| Highway: | VA | Let Status: | Tentative |
| Project ID: | RW 921-6-226 | CSJ: | 0921-06-226 |
| Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
|
| Limits From: | LOCATED IN VICINITY OF GSA FACILITY | Fund Cat: | ROW |
| Limits To: | LOS INDIOS FREE TRADE INT'L BRIDGE | Estimate: | |
| Length: | 0.0 Miles | Actual: | |
|
Back... |
Totals for 0921-06-226 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | |||
CCSJ: 0921-06-227 | |||
| District: | Pharr | Let Date: | JUL 2014 |
| Highway: | VA | Let Status: | Tentative |
| Project ID: | RW 921-6-227 | CSJ: | 0921-06-227 |
| Description: | RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS | Handling Code: |
|
| Limits From: | LOCATED IN VICINITY OF GSA FACILITY | Fund Cat: | ROW |
| Limits To: | BROWNSVILLE/LOS TOMATES | Estimate: | |
| Length: | 0.0 Miles | Actual: | |
|
Back... |
Totals for 0921-06-227 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | |||
CCSJ: 0921-06-241 | |||
| District: | Pharr | Let Date: | JUN 2014 |
| Highway: | CS | Let Status: | Tentative |
| Project ID: | CBI ( ) | CSJ: | 0921-06-241 |
| Description: | CONSTRUCT 2 LANE RURAL | Handling Code: |
|
| Limits From: | S. PARALLEL CORRIDOR, FM 1479 | Fund Cat: | 3 |
| Limits To: | FM 509 (NEW LOCATION) | Estimate: | $4,327,501 |
| Length: | 2.1 Miles | Actual: | |
|
Back... |
Totals for 0921-06-241 | ||
| Length: | 2.1 Miles | ||
| Estimate: | $4,327,501 | ||
| Actual: | |||
CCSJ: 1138-02-015 | |||
| District: | Pharr | Let Date: | AUG 2014 |
| Highway: | FM 803 | Let Status: | Tentative |
| Project ID: | C 1138-2-15 | CSJ: | 1138-02-015 |
| Description: | REALIGN 2 LANE RURAL WITH 4 LANES FROM 0.6 MI S OF SH 100 | Handling Code: |
|
| Limits From: | US 77/83 @ RANCHO VIEJO AVENUE | Fund Cat: | 3 |
| Limits To: | SH 100 | Estimate: | $6,400,000 |
| Length: | 2.8 Miles | Actual: | |
|
Back... |
Totals for 1138-02-015 | ||
| Length: | 2.8 Miles | ||
| Estimate: | $6,400,000 | ||
| Actual: | |||
CCSJ: 1425-02-015 | |||
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | US 77 | Let Status: | Tentative |
| Project ID: | NH 2013(277) | CSJ: | 0327-05-040 |
| Description: | SEAL COAT NB & SB MAINLANES | Handling Code: |
|
| Limits From: | KENEDY/WILLACY CL | Fund Cat: | 1 |
| Limits To: | 0.5 MI N OF KENEDY/WILLACY CL | Estimate: | $49,704 |
| Length: | 0.5 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | US 77 | Let Status: | Tentative |
| Project ID: | STP 2013(274) | CSJ: | 0327-10-055 |
| Description: | SEAL COAT_NB & SB FRONTAGE RDS | Handling Code: |
|
| Limits From: | KENEDY/WILLACY CL | Fund Cat: | 1 |
| Limits To: | BUS 77 (NORTH) | Estimate: | $430,633 |
| Length: | 4.8 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 2925 | Let Status: | Tentative |
| Project ID: | STP 2013(274) | CSJ: | 0630-04-007 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | 0.10 MI W OF FM 1847 | Fund Cat: | 1 |
| Limits To: | END OF STATE MAINTENANCE | Estimate: | $185,570 |
| Length: | 3.2 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 88 | Let Status: | Tentative |
| Project ID: | STP 2013(274) | CSJ: | 0698-01-017 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | SH 186 | Fund Cat: | 1 |
| Limits To: | WILLACY/HIDALGO CL | Estimate: | $152,942 |
| Length: | 3.0 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 88 | Let Status: | Tentative |
| Project ID: | STP 2013(274) | CSJ: | 0698-02-049 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | WILLACY/HIDALGO CL | Fund Cat: | 1 |
| Limits To: | FM 1422 | Estimate: | $212,364 |
| Length: | 4.1 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 507 | Let Status: | Tentative |
| Project ID: | STP 2013(274) | CSJ: | 0873-03-008 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | FM 1018 | Fund Cat: | 1 |
| Limits To: | WILLACY/CAMERON CL | Estimate: | $89,487 |
| Length: | 2.7 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 510 | Let Status: | Tentative |
| Project ID: | STP 2013(274) | CSJ: | 1057-03-038 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | FM 3462 | Fund Cat: | 1 |
| Limits To: | BUS 77 | Estimate: | $64,988 |
| Length: | 1.7 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 1015 | Let Status: | Tentative |
| Project ID: | STP 2013(274) | CSJ: | 1228-01-012 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | SH 186 | Fund Cat: | 1 |
| Limits To: | WILLACY/HIDALGO CL | Estimate: | $131,152 |
| Length: | 3.3 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 1420 | Let Status: | Tentative |
| Project ID: | STP 2013(274) | CSJ: | 1425-02-015 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | WILLACY/CAMERON CL | Fund Cat: | 1 |
| Limits To: | FM 508 | Estimate: | $380,276 |
| Length: | 4.4 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 490 | Let Status: | Tentative |
| Project ID: | STP 2013(274) | CSJ: | 1430-01-022 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | FM 1425 | Fund Cat: | 1 |
| Limits To: | BUS 77 | Estimate: | $137,842 |
| Length: | 1.6 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 507 | Let Status: | Tentative |
| Project ID: | STP 2013(274) | CSJ: | 2246-01-009 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | FM 498 | Fund Cat: | 1 |
| Limits To: | FM 1018 | Estimate: | $105,394 |
| Length: | 3.1 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 2893 | Let Status: | Tentative |
| Project ID: | STP 2013(274) | CSJ: | 2965-01-009 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | FM 803 | Fund Cat: | 1 |
| Limits To: | FM 1847 | Estimate: | $105,460 |
| Length: | 2.9 Miles | Actual: | |
| District: | Pharr | Let Date: | SEP 2013 |
| Highway: | FM 3462 | Let Status: | Tentative |
| Project ID: | STP 2013(274) | CSJ: | 3477-01-004 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | SH 345 | Fund Cat: | 1 |
| Limits To: | .012 MI E OF FM 510 | Estimate: | $95,584 |
| Length: | 1.6 Miles | Actual: | |
|
Back... |
Totals for 1425-02-015 | ||
| Length: | 36.9 Miles | ||
| Estimate: | $2,141,396 | ||
| Actual: | |||
CCSJ: 2243-01-009 | |||
| District: | Pharr | Let Date: | AUG 2014 |
| Highway: | FM 106 | Let Status: | Tentative |
| Project ID: | C 2243-1-9 | CSJ: | 2243-01-009 |
| Description: | RECONSTRUCT COUNTY ROAD - 2 LANE W / SHLDRS | Handling Code: |
|
| Limits From: | FM 1847 ON GEN BRANT RD, E & S | Fund Cat: | 3 |
| Limits To: | FM 510 | Estimate: | $13,500,000 |
| Length: | 11.4 Miles | Actual: | |
|
Back... |
Totals for 2243-01-009 | ||
| Length: | 11.4 Miles | ||
| Estimate: | $13,500,000 | ||
| Actual: | |||
CCSJ: 2366-01-009 | |||
| District: | Pharr | Let Date: | OCT 2013 |
| Highway: | FM 2480 | Let Status: | Tentative |
| Project ID: | STP 2012(644) | CSJ: | 2366-01-009 |
| Description: | REHABILITATE AND RESTORE PAVEMENT | Handling Code: |
|
| Limits From: | FM 3069 | Fund Cat: | 1 |
| Limits To: | FM 510 | Estimate: | $2,245,015 |
| Length: | 4.3 Miles | Actual: | |
|
Back... |
Totals for 2366-01-009 | ||
| Length: | 4.3 Miles | ||
| Estimate: | $2,245,015 | ||
| Actual: | |||
|