Official Notice - Local Let Maintenance Contracts
| Official Notice - Local Let Maintenance Contracts | ||||
| Last Update: Monday, November 5, 2012 |
CCSJ: 6244-47-001 |
|||
| District: | TYLER | Project No.: | RMC - 624447001 |
| County: | ANDERSON | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0155 | Guaranty: | $2,000.00 |
| Length: | 0.010 MI | Est. Cost: | $101,260.00 |
| Time for Completion: | 255 WORKING DAYS | ||
| Type: | TREE REMOVAL | ||
| Limits From: | VARIOUS LOCATIONS IN PALESTINE MTCE | ||
| Limits To: | ANDERSON CO. ETC. | ||
| Bids Received Until: | 1:15 PM December 11, 2012 | ||
| Bids will be Opened: | 1:30 PM December 11, 2012 | ||
| Item Descriptions... | |||
|---|---|---|---|
CCSJ: 6248-29-001 |
|||
| District: | TYLER | Project No.: | RMC - 624829001 |
| County: | ANDERSON | DBE/SBE Goal: | 0.0 % |
| Highway: | US0079 | Guaranty: | $4,000.00 |
| Length: | 0.010 MI | Est. Cost: | $185,821.63 |
| Time for Completion: | 63 WORKING DAYS | ||
| Type: | FULL WIDTH MOWING AND LITTER REMOVAL | ||
| Limits From: | VARIOUS ROADWAYS IN THE PALESTINE | ||
| Limits To: | MAINTENANCE SECTION | ||
| Bids Received Until: | 9:00 AM December 11, 2012 | ||
| Bids will be Opened: | 10:45 AM December 13, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6250-51-001 |
|||
| District: | WACO | Project No.: | RMC - 625051001 |
| County: | BELL | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0195 | Guaranty: | $3,000.00 |
| Length: | 279.490 MI | Est. Cost: | $146,566.20 |
| Time for Completion: | 49 WORKING DAYS | ||
| Type: | RURAL MOWING OF RIGHT OF WAY | ||
| Limits From: | STATE MAINTAINED RURAL ROADWAYS | ||
| Limits To: | IN BELL COUNTY | ||
| Bids Received Until: | 1:00 PM December 11, 2012 | ||
| Bids will be Opened: | 1:00 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6250-58-001 |
|||
| District: | WACO | Project No.: | RMC - 625058001 |
| County: | BELL | DBE/SBE Goal: | 0.0 % |
| Highway: | LP0363 | Guaranty: | $3,000.00 |
| Length: | 133.643 MI | Est. Cost: | $156,064.86 |
| Time for Completion: | 102 WORKING DAYS | ||
| Type: | URBAN MOWING OF RIGHT OF WAY | ||
| Limits From: | STATE MAINTAINED URBAN | ||
| Limits To: | ROADWAYS IN BELL COUNTY | ||
| Bids Received Until: | 1:00 PM December 11, 2012 | ||
| Bids will be Opened: | 1:00 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6250-56-001 |
|||
| District: | WACO | Project No.: | RMC - 625056001 |
| County: | BOSQUE | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0006 | Guaranty: | $3,000.00 |
| Length: | 342.680 MI | Est. Cost: | $166,918.20 |
| Time for Completion: | 59 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | BOSQUE COUNTY | ||
| Bids Received Until: | 1:00 PM December 11, 2012 | ||
| Bids will be Opened: | 1:00 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6248-26-001 |
|||
| District: | TYLER | Project No.: | RMC - 624826001 |
| County: | CHEROKEE | DBE/SBE Goal: | 0.0 % |
| Highway: | US0069 | Guaranty: | $3,000.00 |
| Length: | 0.010 MI | Est. Cost: | $126,948.81 |
| Time for Completion: | 43 WORKING DAYS | ||
| Type: | FULL WIDTH MOWING AND LITTER REMOVAL | ||
| Limits From: | VARIOUS ROADWAYS IN JACKSONVILLE | ||
| Limits To: | MTCE. SECTION | ||
| Bids Received Until: | 9:00 AM December 11, 2012 | ||
| Bids will be Opened: | 10:00 AM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6248-30-001 |
|||
| District: | TYLER | Project No.: | RMC - 624830001 |
| County: | CHEROKEE | DBE/SBE Goal: | 0.0 % |
| Highway: | US0069 | Guaranty: | $3,000.00 |
| Length: | 0.010 MI | Est. Cost: | $128,179.54 |
| Time for Completion: | 45 WORKING DAYS | ||
| Type: | ROW MOWING AND LITTER REMOVAL | ||
| Limits From: | VARIOUS ROADWAYS IN THE RUSK | ||
| Limits To: | MTCE. SECTION - CHEROKEE CO. | ||
| Bids Received Until: | 9:00 AM December 11, 2012 | ||
| Bids will be Opened: | 11:00 AM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6242-15-001 |
|||
| District: | DALLAS | Project No.: | RMC - 624215001 |
| County: | COLLIN | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0078 | Guaranty: | $3,000.00 |
| Length: | 0.000 MI | Est. Cost: | $132,761.00 |
| Time for Completion: | 29 WORKING DAYS | ||
| Type: | VEGETATION MANAGEMENT | ||
| Limits From: | VARIOUS LOCATIONS IN THE COLLIN | ||
| Limits To: | COUNTY MAINTENANCE SECTION | ||
| Comments: | PLANS ARE REQUIRED |
||
| Bids Received Until: | 10:30 AM December 11, 2012 | ||
| Bids will be Opened: | 10:45 AM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6242-16-001 |
|||
| District: | DALLAS | Project No.: | RMC - 624216001 |
| County: | COLLIN | DBE/SBE Goal: | 0.0 % |
| Highway: | US0075 | Guaranty: | $3,000.00 |
| Length: | 0.000 MI | Est. Cost: | $170,460.00 |
| Time for Completion: | 29 WORKING DAYS | ||
| Type: | VEGETATION MANAGEMENT | ||
| Limits From: | VARIOUS LOCATIONS IN THE COLLIN | ||
| Limits To: | COUNTY MAINTENANCE SECTION | ||
| Comments: | PLANS ARE REQUIRED |
||
| Bids Received Until: | 10:30 AM December 11, 2012 | ||
| Bids will be Opened: | 10:45 AM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6250-52-001 |
|||
| District: | WACO | Project No.: | RMC - 625052001 |
| County: | CORYELL | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0036 | Guaranty: | $4,000.00 |
| Length: | 272.300 MI | Est. Cost: | $195,694.15 |
| Time for Completion: | 113 WORKING DAYS | ||
| Type: | MOWING AND LITTER PICKUP AND DISPOSAL | ||
| Limits From: | STATE MAINTAINED ROADWAYS | ||
| Limits To: | IN CORYELL COUNTY | ||
| Bids Received Until: | 1:00 PM December 11, 2012 | ||
| Bids will be Opened: | 1:00 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6249-39-001 |
|||
| District: | PARIS | Project No.: | RMC - 624939001 |
| County: | DELTA | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0024 | Guaranty: | $2,000.00 |
| Length: | 0.000 MI | Est. Cost: | $84,600.00 |
| Time for Completion: | 34 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | DELTA COUNTY | ||
| Bids Received Until: | 9:30 AM December 12, 2012 | ||
| Bids will be Opened: | 9:30 AM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6250-55-001 |
|||
| District: | WACO | Project No.: | RMC - 625055001 |
| County: | FALLS | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0007 | Guaranty: | $4,000.00 |
| Length: | 338.743 MI | Est. Cost: | $190,258.55 |
| Time for Completion: | 63 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | FALLS COUNTY | ||
| Bids Received Until: | 1:00 PM December 11, 2012 | ||
| Bids will be Opened: | 1:00 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6249-37-001 |
|||
| District: | PARIS | Project No.: | RMC - 624937001 |
| County: | FANNIN | DBE/SBE Goal: | 0.0 % |
| Highway: | US0082 | Guaranty: | $4,000.00 |
| Length: | 0.000 MI | Est. Cost: | $208,095.00 |
| Time for Completion: | 60 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | FANNIN COUNTY | ||
| Bids Received Until: | 9:00 AM December 12, 2012 | ||
| Bids will be Opened: | 9:00 AM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6249-43-001 |
|||
| District: | PARIS | Project No.: | RMC - 624943001 |
| County: | FRANKLIN | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0037 | Guaranty: | $2,000.00 |
| Length: | 0.000 MI | Est. Cost: | $92,928.00 |
| Time for Completion: | 32 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | FRANKLIN AND HOPKINS COUNTY | ||
| Bids Received Until: | 10:30 AM December 12, 2012 | ||
| Bids will be Opened: | 10:30 AM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6251-76-001 |
|||
| District: | YOAKUM | Project No.: | RMC - 625176001 |
| County: | GONZALES | DBE/SBE Goal: | 0.0 % |
| Highway: | UA0090 | Guaranty: | $1,000.00 |
| Length: | 0.000 MI | Est. Cost: | $68,210.00 |
| Time for Completion: | 30 WORKING DAYS | ||
| Type: | SPECIALTY MARKINGS | ||
| Limits From: | DISTRICT WIDE | ||
| Limits To: | VARIOUS | ||
| Bids Received Until: | 1:30 PM December 19, 2012 | ||
| Bids will be Opened: | 1:30 PM December 19, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6249-45-001 |
|||
| District: | PARIS | Project No.: | RMC - 624945001 |
| County: | GRAYSON | DBE/SBE Goal: | 0.0 % |
| Highway: | US0075 | Guaranty: | $2,000.00 |
| Length: | 0.000 MI | Est. Cost: | $117,255.50 |
| Time for Completion: | 39 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | GRAYSON COUNTY | ||
| Bids Received Until: | 11:00 AM December 12, 2012 | ||
| Bids will be Opened: | 11:00 AM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6249-46-001 |
|||
| District: | PARIS | Project No.: | RMC - 624946001 |
| County: | GRAYSON | DBE/SBE Goal: | 0.0 % |
| Highway: | US0069 | Guaranty: | $4,000.00 |
| Length: | 0.000 MI | Est. Cost: | $183,058.50 |
| Time for Completion: | 53 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | GRAYSON COUNTY | ||
| Bids Received Until: | 11:15 AM December 12, 2012 | ||
| Bids will be Opened: | 11:15 AM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6250-16-001 |
|||
| District: | PARIS | Project No.: | RMC - 625016001 |
| County: | GRAYSON | DBE/SBE Goal: | 0.0 % |
| Highway: | US0082 | Guaranty: | $1,000.00 |
| Length: | 0.000 MI | Est. Cost: | $65,000.00 |
| Time for Completion: | 254 WORKING DAYS | ||
| Type: | ONE WAY TRAFFIC CONTROL (FLAGGING) | ||
| Limits From: | VARIOUS ROADWAYS IN GRAYSON AND | ||
| Limits To: | ON OCCASION IN FANNIN COUNTY | ||
| Bids Received Until: | 2:00 PM December 13, 2012 | ||
| Bids will be Opened: | 2:00 PM December 13, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6244-45-001 |
|||
| District: | TYLER | Project No.: | RMC - 624445001 |
| County: | GREGG | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0031 | Guaranty: | $1,000.00 |
| Length: | 0.010 MI | Est. Cost: | $50,150.00 |
| Time for Completion: | 255 WORKING DAYS | ||
| Type: | TREE REMOVAL | ||
| Limits From: | VARIOUS ROADS IN LONGVIEW MTCE. | ||
| Limits To: | GREGG CO. ETC. | ||
| Bids Received Until: | 1:15 PM December 11, 2012 | ||
| Bids will be Opened: | 1:30 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6248-27-001 |
|||
| District: | TYLER | Project No.: | RMC - 624827001 |
| County: | GREGG | DBE/SBE Goal: | 0.0 % |
| Highway: | US0259 | Guaranty: | $2,000.00 |
| Length: | 0.010 MI | Est. Cost: | $119,544.42 |
| Time for Completion: | 43 WORKING DAYS | ||
| Type: | FULL WIDTH MOWING AND LITTER REMOVAL | ||
| Limits From: | VARIOUS ROADWAYS IN THE LONGVIEW | ||
| Limits To: | MTCE. SECTION | ||
| Bids Received Until: | 9:00 AM December 11, 2012 | ||
| Bids will be Opened: | 10:15 AM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6250-53-001 |
|||
| District: | WACO | Project No.: | RMC - 625053001 |
| County: | HAMILTON | DBE/SBE Goal: | 0.0 % |
| Highway: | US0281 | Guaranty: | $3,000.00 |
| Length: | 287.541 MI | Est. Cost: | $160,417.50 |
| Time for Completion: | 89 WORKING DAYS | ||
| Type: | MOWING AND LITTER PICKUP AND DISPOSAL | ||
| Limits From: | STATE MAINTAINED ROADWAYS | ||
| Limits To: | IN HAMILTON COUNTY | ||
| Bids Received Until: | 1:00 PM December 11, 2012 | ||
| Bids will be Opened: | 1:00 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6246-99-001 |
|||
| District: | ATLANTA | Project No.: | RMC - 624699001 |
| County: | HARRISON | DBE/SBE Goal: | 0.0 % |
| Highway: | US0059 | Guaranty: | $5,000.00 |
| Length: | 0.000 MI | Est. Cost: | $228,220.00 |
| Time for Completion: | 177 WORKING DAYS | ||
| Type: | TREE AND STUMP REMOVAL (SOUTH) | ||
| Limits From: | VARIOUS | ||
| Limits To: | . | ||
| Comments: | NOTICE TO CONTRACTORS PLANS ARE REQUIRED ON THIS PROJECT |
||
| Bids Received Until: | 10:00 AM December 12, 2012 | ||
| Bids will be Opened: | 10:00 AM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6248-23-001 |
|||
| District: | TYLER | Project No.: | RMC - 624823001 |
| County: | HENDERSON | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0031 | Guaranty: | $4,000.00 |
| Length: | 0.010 MI | Est. Cost: | $216,306.74 |
| Time for Completion: | 69 WORKING DAYS | ||
| Type: | FULL WIDTH MOWING / LITTER REMOVAL | ||
| Limits From: | VARIOUS ROADWAYS IN THE ATHENS | ||
| Limits To: | MAINTENANCE SECTION | ||
| Bids Received Until: | 9:00 AM December 11, 2012 | ||
| Bids will be Opened: | 9:15 AM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6250-54-001 |
|||
| District: | WACO | Project No.: | RMC - 625054001 |
| County: | HILL | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0171 | Guaranty: | $5,000.00 |
| Length: | 221.740 MI | Est. Cost: | $243,386.95 |
| Time for Completion: | 124 WORKING DAYS | ||
| Type: | MOWING ROW & LITTER PICKUP AND DISPOSAL | ||
| Limits From: | STATE MAINTAINED ROADWAYS | ||
| Limits To: | HILL COUNTY | ||
| Bids Received Until: | 1:00 PM December 11, 2012 | ||
| Bids will be Opened: | 1:00 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6249-47-001 |
|||
| District: | PARIS | Project No.: | RMC - 624947001 |
| County: | HOPKINS | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0019 | Guaranty: | $2,000.00 |
| Length: | 0.000 MI | Est. Cost: | $108,048.00 |
| Time for Completion: | 36 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | HOPKINS COUNTY | ||
| Bids Received Until: | 11:30 AM December 12, 2012 | ||
| Bids will be Opened: | 11:30 AM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6249-48-001 |
|||
| District: | PARIS | Project No.: | RMC - 624948001 |
| County: | HOPKINS | DBE/SBE Goal: | 0.0 % |
| Highway: | IH0030 | Guaranty: | $2,000.00 |
| Length: | 0.000 MI | Est. Cost: | $116,568.00 |
| Time for Completion: | 39 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | IH 30 THROUGH HOPKINS AND FRANKLIN | ||
| Limits To: | COUNTIES AND INTERCITY AREAS | ||
| Bids Received Until: | 11:45 AM December 12, 2012 | ||
| Bids will be Opened: | 11:45 AM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6246-74-001 |
|||
| District: | PARIS | Project No.: | RMC - 624674001 |
| County: | HUNT | DBE/SBE Goal: | 0.0 % |
| Highway: | IH0030 | Guaranty: | $2,000.00 |
| Length: | 0.000 MI | Est. Cost: | $80,682.00 |
| Time for Completion: | 261 WORKING DAYS | ||
| Type: | ON CALL TREE REMOVAL | ||
| Limits From: | VARIOUS ROADS IN HUNT | ||
| Limits To: | AND RAINS COUNTY | ||
| Comments: | THIS CSJ REJECTED FROM OCT LETTING AND WILL RE-LET ON DECEMBER 13, 2012. |
||
| Bids Received Until: | 2:00 PM December 13, 2012 | ||
| Bids will be Opened: | 2:00 PM December 13, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6249-07-001 |
|||
| District: | PARIS | Project No.: | RMC - 624907001 |
| County: | HUNT | DBE/SBE Goal: | 0.0 % |
| Highway: | IH0030 | Guaranty: | $2,000.00 |
| Length: | 203.000 MI | Est. Cost: | $104,240.00 |
| Time for Completion: | 254 WORKING DAYS | ||
| Type: | REMOVAL AND DISPOSAL OF DEBRIS | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | HUNT AND RAINS COUNTIES | ||
| Bids Received Until: | 2:00 PM December 13, 2012 | ||
| Bids will be Opened: | 2:00 PM December 13, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6249-41-001 |
|||
| District: | PARIS | Project No.: | RMC - 624941001 |
| County: | HUNT | DBE/SBE Goal: | 0.0 % |
| Highway: | IH0030 | Guaranty: | $4,000.00 |
| Length: | 0.000 MI | Est. Cost: | $176,304.00 |
| Time for Completion: | 39 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | HUNT COUNTY | ||
| Bids Received Until: | 10:00 AM December 12, 2012 | ||
| Bids will be Opened: | 10:00 AM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6249-42-001 |
|||
| District: | PARIS | Project No.: | RMC - 624942001 |
| County: | HUNT | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0011 | Guaranty: | $2,000.00 |
| Length: | 0.000 MI | Est. Cost: | $119,664.00 |
| Time for Completion: | 26 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | HUNT COUNTY | ||
| Bids Received Until: | 10:15 AM December 12, 2012 | ||
| Bids will be Opened: | 10:15 AM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6241-58-001 |
|||
| District: | LAREDO | Project No.: | RMC - 624158001 |
| County: | KINNEY | DBE/SBE Goal: | 0.0 % |
| Highway: | US0090 | Guaranty: | $3,000.00 |
| Length: | 202.810 MI | Est. Cost: | $168,444.87 |
| Time for Completion: | 730 CALENDAR DAYS | ||
| Type: | MOWING OF HIGHWAYS RIGHT - OF - WAY | ||
| Limits From: | US 90 | ||
| Limits To: | SH 131, ETC. | ||
| Comments: | PLANS ARE REQUIRED. |
||
| Bids Received Until: | 2:00 PM December 6, 2012 | ||
| Bids will be Opened: | 2:00 PM December 6, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6249-44-001 |
|||
| District: | PARIS | Project No.: | RMC - 624944001 |
| County: | LAMAR | DBE/SBE Goal: | 0.0 % |
| Highway: | US0082 | Guaranty: | $4,000.00 |
| Length: | 0.000 MI | Est. Cost: | $191,482.00 |
| Time for Completion: | 66 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | LAMAR COUNTY | ||
| Bids Received Until: | 10:45 AM December 12, 2012 | ||
| Bids will be Opened: | 10:45 AM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6250-57-001 |
|||
| District: | WACO | Project No.: | RMC - 625057001 |
| County: | LIMESTONE | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0014 | Guaranty: | $4,000.00 |
| Length: | 375.700 MI | Est. Cost: | $198,115.59 |
| Time for Completion: | 67 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | LIMESTONE COUNTY | ||
| Bids Received Until: | 1:00 PM December 11, 2012 | ||
| Bids will be Opened: | 1:00 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6241-31-001 |
|||
| District: | LAREDO | Project No.: | RMC - 624131001 |
| County: | MAVERICK | DBE/SBE Goal: | 0.0 % |
| Highway: | US0277 | Guaranty: | $3,000.00 |
| Length: | 211.350 MI | Est. Cost: | $160,660.52 |
| Time for Completion: | 730 CALENDAR DAYS | ||
| Type: | MOWING OF HIGHWAYS RIGHT - OF - WAY | ||
| Limits From: | US 277 | ||
| Limits To: | FM 1021, ETC. | ||
| Comments: | PLANS ARE REQUIRED. |
||
| Bids Received Until: | 2:00 PM December 6, 2012 | ||
| Bids will be Opened: | 2:00 PM December 6, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6250-59-001 |
|||
| District: | WACO | Project No.: | RMC - 625059001 |
| County: | MCLENNAN | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0006 | Guaranty: | $5,000.00 |
| Length: | 382.100 MI | Est. Cost: | $232,089.28 |
| Time for Completion: | 150 WORKING DAYS | ||
| Type: | MOWING (RURAL) HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOOUS RURAL ROADWAYS | ||
| Limits To: | IN MCLENNAN COUNTY | ||
| Bids Received Until: | 1:00 PM December 11, 2012 | ||
| Bids will be Opened: | 1:00 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6250-60-001 |
|||
| District: | WACO | Project No.: | RMC - 625060001 |
| County: | MCLENNAN | DBE/SBE Goal: | 0.0 % |
| Highway: | BU0077L | Guaranty: | $2,000.00 |
| Length: | 70.290 MI | Est. Cost: | $91,624.47 |
| Time for Completion: | 132 WORKING DAYS | ||
| Type: | MOWING (URBAN) HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS URBAN ROADWAYS | ||
| Limits To: | IN MCLENNAN COUNTY | ||
| Bids Received Until: | 1:00 PM December 11, 2012 | ||
| Bids will be Opened: | 1:00 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6252-22-001 |
|||
| District: | LUFKIN | Project No.: | RMC - 625222001 |
| County: | NACOGDOCHES | DBE/SBE Goal: | 0.0 % |
| Highway: | FM0095 | Guaranty: | $6,000.00 |
| Length: | 0.010 MI | Est. Cost: | $289,317.05 |
| Time for Completion: | 50 WORKING DAYS | ||
| Type: | CLEANING AND SEALING JOINTS / CRACKS | ||
| Limits From: | VARIOUS LOCATION WITHIN | ||
| Limits To: | LUFKIN DISTRICT_(8 COUNTIES) | ||
| Comments: | THIS CONTRACT HAS PLANS |
||
| Bids Received Until: | 1:00 PM December 11, 2012 | ||
| Bids will be Opened: | 1:15 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6231-81-001 |
|||
| District: | CORPUS CHRISTI | Project No.: | RMC - 623181001 |
| County: | NUECES | DBE/SBE Goal: | 0.0 % |
| Highway: | US0077 | Guaranty: | $2,000.00 |
| Length: | 0.999 MI | Est. Cost: | $77,019.26 |
| Time for Completion: | 30 WORKING DAYS | ||
| Type: | CULVERT CLEANING | ||
| Limits From: | US 77 | ||
| Limits To: | SH 44 | ||
| Bids Received Until: | 2:00 PM December 11, 2012 | ||
| Bids will be Opened: | 2:00 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6249-40-001 |
|||
| District: | PARIS | Project No.: | RMC - 624940001 |
| County: | RAINS | DBE/SBE Goal: | 0.0 % |
| Highway: | US0069 | Guaranty: | $2,000.00 |
| Length: | 0.000 MI | Est. Cost: | $118,272.00 |
| Time for Completion: | 40 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | RAINS AND HUNT COUNTY | ||
| Bids Received Until: | 9:45 AM December 12, 2012 | ||
| Bids will be Opened: | 9:45 AM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6248-02-001 |
|||
| District: | PARIS | Project No.: | RMC - 624802001 |
| County: | RED RIVER | DBE/SBE Goal: | 0.0 % |
| Highway: | US0082 | Guaranty: | $2,000.00 |
| Length: | 0.000 MI | Est. Cost: | $84,050.00 |
| Time for Completion: | 261 WORKING DAYS | ||
| Type: | ON CALL TREE REMOVAL | ||
| Limits From: | VARIOUS LOCATIONS | ||
| Limits To: | IN RED RIVER COUNTY | ||
| Comments: | PREVIOUSLY LET 10-18-12 |
||
| Bids Received Until: | 2:00 PM December 13, 2012 | ||
| Bids will be Opened: | 2:00 PM December 13, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6249-38-001 |
|||
| District: | PARIS | Project No.: | RMC - 624938001 |
| County: | RED RIVER | DBE/SBE Goal: | 0.0 % |
| Highway: | US0082 | Guaranty: | $3,000.00 |
| Length: | 0.000 MI | Est. Cost: | $126,076.70 |
| Time for Completion: | 63 WORKING DAYS | ||
| Type: | MOWING HIGHWAY RIGHT OF WAY | ||
| Limits From: | VARIOUS ROADWAYS IN | ||
| Limits To: | RED RIVER COUNTY | ||
| Bids Received Until: | 9:15 AM December 12, 2012 | ||
| Bids will be Opened: | 9:15 AM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6244-51-001 |
|||
| District: | TYLER | Project No.: | RMC - 624451001 |
| County: | RUSK | DBE/SBE Goal: | 0.0 % |
| Highway: | FM0840 | Guaranty: | $1,000.00 |
| Length: | 54.900 MI | Est. Cost: | $82,350.00 |
| Time for Completion: | 37 WORKING DAYS | ||
| Type: | TREE TRIMMING AND BRUSH CONTROL | ||
| Limits From: | VARIOS LOCATIONS IN HENDERSON MTCE. | ||
| Limits To: | RUSK CO ETC. | ||
| Bids Received Until: | 1:15 PM December 11, 2012 | ||
| Bids will be Opened: | 1:30 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6248-25-001 |
|||
| District: | TYLER | Project No.: | RMC - 624825001 |
| County: | RUSK | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0064 | Guaranty: | $4,000.00 |
| Length: | 0.010 MI | Est. Cost: | $185,844.06 |
| Time for Completion: | 63 WORKING DAYS | ||
| Type: | FULL WIDTH MOWING AND LITTER REMOVAL | ||
| Limits From: | VARIOUS ROADWAYS IN THE HENDERSON | ||
| Limits To: | MTCE. SECTION | ||
| Bids Received Until: | 9:00 AM December 11, 2012 | ||
| Bids will be Opened: | 9:45 AM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6244-56-001 |
|||
| District: | TYLER | Project No.: | RMC - 624456001 |
| County: | SMITH | DBE/SBE Goal: | 0.0 % |
| Highway: | FM0016 | Guaranty: | $2,000.00 |
| Length: | 77.260 MI | Est. Cost: | $115,890.00 |
| Time for Completion: | 52 WORKING DAYS | ||
| Type: | TREE TRIMMING AND BRUSH CONTROL | ||
| Limits From: | VARIOUS LOCATIONS IN TYLER MTCE. | ||
| Limits To: | SMITH CO. ETC. | ||
| Bids Received Until: | 1:15 PM December 11, 2012 | ||
| Bids will be Opened: | 1:30 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6248-31-001 |
|||
| District: | TYLER | Project No.: | RMC - 624831001 |
| County: | SMITH | DBE/SBE Goal: | 0.0 % |
| Highway: | US0271 | Guaranty: | $3,000.00 |
| Length: | 0.010 MI | Est. Cost: | $127,252.19 |
| Time for Completion: | 45 WORKING DAYS | ||
| Type: | ROW MOWING AND LITTER REMOVAL | ||
| Limits From: | VARIOUS ROADWAYS IN THE N. TYLER | ||
| Limits To: | MTCE. SECTION - SMITH CO. ETC. | ||
| Bids Received Until: | 9:00 AM December 11, 2012 | ||
| Bids will be Opened: | 11:15 AM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6248-32-001 |
|||
| District: | TYLER | Project No.: | RMC - 624832001 |
| County: | SMITH | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0155 | Guaranty: | $3,000.00 |
| Length: | 0.010 MI | Est. Cost: | $146,639.86 |
| Time for Completion: | 49 WORKING DAYS | ||
| Type: | ROW MOWING AND LITTER REMOVAL | ||
| Limits From: | VARIOUS ROADWAYS IN THE S. TYLER | ||
| Limits To: | MTCE. SECTION - SMITH CO. ETC. | ||
| Bids Received Until: | 9:00 AM December 11, 2012 | ||
| Bids will be Opened: | 11:30 AM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6246-14-001 |
|||
| District: | AUSTIN | Project No.: | RMC - 624614001 |
| County: | TRAVIS | DBE/SBE Goal: | 0.0 % |
| Highway: | IH0035 | Guaranty: | $6,000.00 |
| Length: | 0.000 MI | Est. Cost: | $298,520.00 |
| Time for Completion: | 548 CALENDAR DAYS | ||
| Type: | TRAFFIC SIGNAL MAINTENANCE | ||
| Limits From: | AUSTIN DISTRICT | ||
| Limits To: | VARIOUS LOCATIONS | ||
| Comments: | TEXAS DEPARTMENT OF TRANSPORTATION |
||
| Bids Received Until: | 10:00 AM December 6, 2012 | ||
| Bids will be Opened: | 10:00 AM December 6, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6248-72-001 |
|||
| District: | LUFKIN | Project No.: | RMC - 624872001 |
| County: | TRINITY | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0019 | Guaranty: | $6,000.00 |
| Length: | 0.010 MI | Est. Cost: | $297,100.00 |
| Time for Completion: | 80 WORKING DAYS | ||
| Type: | DITCH AND CULVERT CLEANING | ||
| Limits From: | VARIOUS LOCATIONS WITHIN | ||
| Limits To: | TRINITY COUNTY | ||
| Comments: | THIS PROJECT INCLUDES PLANS |
||
| Bids Received Until: | 1:00 PM December 11, 2012 | ||
| Bids will be Opened: | 1:15 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6248-73-001 |
|||
| District: | LUFKIN | Project No.: | RMC - 624873001 |
| County: | TRINITY | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0019 | Guaranty: | $2,000.00 |
| Length: | 0.010 MI | Est. Cost: | $75,000.00 |
| Time for Completion: | 160 WORKING DAYS | ||
| Type: | TREE TRIMMING AND BRUSH REMOVAL / DISPOSAL | ||
| Limits From: | SH0019 | ||
| Limits To: | VARIOUS LOCATIONS | ||
| Comments: | THIS CONTRACT HAS PLANS |
||
| Bids Received Until: | 1:00 PM December 11, 2012 | ||
| Bids will be Opened: | 1:15 PM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6241-92-001 |
|||
| District: | LAREDO | Project No.: | RMC - 624192001 |
| County: | VAL VERDE | DBE/SBE Goal: | 0.0 % |
| Highway: | US0277 | Guaranty: | $5,000.00 |
| Length: | 306.800 MI | Est. Cost: | $226,579.21 |
| Time for Completion: | 730 CALENDAR DAYS | ||
| Type: | MOWING OF HIGHWAYS RIGHT - OF - WAY | ||
| Limits From: | US 277 | ||
| Limits To: | SS 239, ETC. | ||
| Comments: | PLANS ARE REQUIRED. |
||
| Bids Received Until: | 2:00 PM December 6, 2012 | ||
| Bids will be Opened: | 2:00 PM December 6, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6248-24-001 |
|||
| District: | TYLER | Project No.: | RMC - 624824001 |
| County: | VAN ZANDT | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0064 | Guaranty: | $3,000.00 |
| Length: | 0.010 MI | Est. Cost: | $144,557.02 |
| Time for Completion: | 51 WORKING DAYS | ||
| Type: | FULL WIDTH MOWING AND LITTER REMOVAL | ||
| Limits From: | VARIOUS ROADWAYS IN THE CANTON | ||
| Limits To: | MAINTENANCE SECTION | ||
| Bids Received Until: | 9:00 AM December 11, 2012 | ||
| Bids will be Opened: | 9:30 AM December 11, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6251-74-001 |
|||
| District: | YOAKUM | Project No.: | RMC - 625174001 |
| County: | VICTORIA | DBE/SBE Goal: | 0.0 % |
| Highway: | US0059 | Guaranty: | $2,000.00 |
| Length: | 0.000 MI | Est. Cost: | $85,218.75 |
| Time for Completion: | 30 WORKING DAYS | ||
| Type: | RAISED PAVEMENT & SPECIALTY MARKINGS | ||
| Limits From: | DISTRICTWIDE | ||
| Limits To: | VARIOUS LOCATIONS | ||
| Bids Received Until: | 1:30 PM December 19, 2012 | ||
| Bids will be Opened: | 1:30 PM December 19, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6241-34-001 |
|||
| District: | LAREDO | Project No.: | RMC - 624134001 |
| County: | WEBB | DBE/SBE Goal: | 0.0 % |
| Highway: | IH0035 | Guaranty: | $6,000.00 |
| Length: | 0.000 MI | Est. Cost: | $297,515.67 |
| Time for Completion: | 365 WORKING DAYS | ||
| Type: | INSTALL RAISED MEDIAN, SIGNING & STRIPING | ||
| Limits From: | VARIOUS | ||
| Limits To: | VARIOUS | ||
| Comments: | PLANS ARE REQUIRED. |
||
| Bids Received Until: | 2:00 PM December 12, 2012 | ||
| Bids will be Opened: | 2:00 PM December 12, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6251-71-001 |
|||
| District: | YOAKUM | Project No.: | RMC - 625171001 |
| County: | WHARTON | DBE/SBE Goal: | 0.0 % |
| Highway: | SH0071 | Guaranty: | $5,000.00 |
| Length: | 0.000 MI | Est. Cost: | $263,765.78 |
| Time for Completion: | 20 WORKING DAYS | ||
| Type: | THERMOPLASTIC STRIPE | ||
| Limits From: | WHARTON, MATAGORDA, AUSTIN | ||
| Limits To: | VICTORIA, JACKSON, AND CALHOUN | ||
| Bids Received Until: | 1:30 PM December 19, 2012 | ||
| Bids will be Opened: | 1:30 PM December 19, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6251-79-001 |
|||
| District: | YOAKUM | Project No.: | RMC - 625179001 |
| County: | WHARTON | DBE/SBE Goal: | 0.0 % |
| Highway: | US0059 | Guaranty: | $4,000.00 |
| Length: | 0.000 MI | Est. Cost: | $192,850.00 |
| Time for Completion: | 40 WORKING DAYS | ||
| Type: | CRACK SEAL | ||
| Limits From: | WHARTON, MATAGORDA, AUSTIN | ||
| Limits To: | AND COLORADO COUNTIES | ||
| Bids Received Until: | 2:00 PM December 19, 2012 | ||
| Bids will be Opened: | 2:00 PM December 19, 2012 | ||
| Item Descriptions... | |||
CCSJ: 6248-28-001 |
|||
| District: | TYLER | Project No.: | RMC - 624828001 |
| County: | WOOD | DBE/SBE Goal: | 0.0 % |
| Highway: | US0069 | Guaranty: | $6,000.00 |
| Length: | 0.010 MI | Est. Cost: | $298,838.54 |
| Time for Completion: | 67 WORKING DAYS | ||
| Type: | FULL WIDTH MOWING AND LITTER REMOVAL | ||
| Limits From: | VARIOUS ROADWAYS IN THE MINEOLA | ||
| Limits To: | MTCE. SECTION | ||
| Bids Received Until: | 9:00 AM December 11, 2012 | ||
| Bids will be Opened: | 10:30 AM December 11, 2012 | ||
| Item Descriptions... | |||
| |