***** OFFICIAL NOTICE ***** *** STATE LET MAINTENANCE CONTRACT *** COUNTY: FREESTONE HIGHWAY: FM0489 LENGTH: 4.199 MI CONTROL NUMBER: 6242-12-001 SBE GOAL: 0.0 % PROJECT NUMBER: RMC - 624212001 TYPE: ROADWAY RESTORATION TIME FOR COMPLETION: 70 WORKING DAYS GUARANTY: 25,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 5, 2012 * EST.COST: 1,242,771.08 BIDS WILL BE OPENED: 1:00 PM December 5, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION JEFFREY, MARK AUSTIN HQ - RIVERSIDE ANNEX 340 WEST US 84 200 E RIVERSIDE ROOM 1B.1 FAIRFIELD TX 75840 AUSTIN TX 78704-1204 (903)389-3530 (512)416-2498 LIMITS FROM: FM 80 LIMITS TO: LIMESTONE COUNTY LINE ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 100 2002 002 PREPARING ROW STA .500 110 2001 EXCAVATION (ROADWAY) CY 212.000 112 2002 SUBGRADE WIDENING (DENS CONT) STA 219.130 132 2019 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) CY 232.000 134 2002 BACKFILL (TY B) STA 221.730 150 2001 BLADING STA 221.730 150 2002 BLADING HR 14.000 164 2033 002 DRILL SEEDING (PERM) (RURAL) (SANDY) SY 36,956.000 164 2041 002 DRILL SEEDING (TEMP) (WARM) SY 18,479.000 164 2043 002 DRILL SEEDING (TEMP) (COOL) SY 18,479.000 168 2001 VEGETATIVE WATERING MG 369.600 247 2350 FL BS (CMP IN PLC) (TY A GR 2) (4") SY 68,174.000 251 2115 REWORK BS MTL (TY D)(12")(ORD COMP) STA 219.130 275 2001 003 CEMENT TON 1,274.000 275 2055 003 CEMENT TREAT (EXIST MATL) (DC) (9") SY 75,478.000 276 2238 CEM TRT(PLNT MX)(CL N)(TY E)(GR 4)(12") SY 666.000 316 2015 016 ASPH (RC-250) GAL 13,759.000 316 2406 016 AGGR (TY-B GR-5 OR TY-L GR-5 SAC-B) CY 510.000 316 2706 016 ASPH (TIER II) GAL 24,920.000 316 2718 016 AGGR (TIER II) CY 554.000 400 2006 CUT & RESTORING PAV SY 38.000 402 2001 TRENCH EXCAVATION PROTECTION LF 8.000 403 2001 TEMPORARY SPL SHORING SF 1,513.000 432 2001 RIPRAP (CONC)(4 IN) CY 7.200 460 2004 CMP (GAL STL 24 IN) LF 2.000 460 2015 CMP AR (GAL STL DES 3) LF 88.000 460 2018 CMP AR (GAL STL DES 6) LF 41.000 460 2030 CMP (GAL STL BIT COAT 48 IN) LF 14.400 464 2013 006 RC PIPE (CL III)(60 IN) LF 8.000 466 2133 HEADWALL (CH-PW-0)(DIA= 60 IN) EA 2.000 466 2146 HEADWALL (CH-PW-S)(DIA= 48 IN) EA 2.000 467 2262 SET (TY II)(24 IN)(CMP)(4:1)(C) EA 2.000 467 2323 SET (TY II)(DES 3)(CMP)(4:1)(C) EA 4.000 467 2326 SET (TY II)(DES 6)(CMP)(4:1)(C) EA 2.000 472 2013 REMOV & RE-LAY PIPE (60 IN) LF 4.000 496 2007 REMOV STR (PIPE) LF 121.000 500 2001 011 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 530 2008 006 DRIVEWAYS (ACP) EA 10.000 530 2009 006 DRIVEWAYS (SURF TREAT) EA 10.000 530 2015 006 TURNOUTS (SURF TREAT) EA 17.000 530 2058 006 DRIVEWAYS (OTHER) EA 27.000 560 2007 001 MAILBOX INSTALL-D (TWW-POST)TY 4 FND-TB EA 1.000 560 2008 001 MAILBOX INSTALL-M (TWW-POST)TY 4 FND-TB EA 1.000 560 2015 001 MAILBOX INSTALL-S(TWW-POST)TY 4 FND-TB EA 15.000 662 2030 WK ZN PAV MRK NON-REMOV (Y) 4" (BRK) LF 3,270.000 662 2032 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 28,031.000 662 2115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 1,128.000 666 2012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 44,346.000 666 2048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 92.000 666 2105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 3,270.000 666 2111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 28,031.000 672 2015 034 REFL PAV MRKR TY II-A-A EA 513.000 1122 2001 001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 615.000 1122 2002 001 ROCK FILTER DAMS (INSTALL) (TY 2) LF 10.000 1122 2009 001 ROCK FILTER DAMS (REMOVE) LF 625.000 1122 2037 001 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 3,355.000 1122 2057 001 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 3,355.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT (NON-PART) $ 1,285.00