***** OFFICIAL NOTICE ***** *** STATE LET CONSTRUCTION CONTRACT *** COUNTY: WILLACY HIGHWAY: FM 490 LENGTH: 1.000 MI CONTROL NUMBER: 1430-01-020 DBE GOAL: 3.0 % PROJECT NUMBER: STP 2013(278) TYPE: REHAB OF EXISTING ROADWAY TIME FOR COMPLETION: 60 WORKING DAYS GUARANTY: 14,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 4, 2012 * EST.COST: 712,607.41 BIDS WILL BE OPENED: 1:00 PM December 4, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION BOSQUEZ, JUAN AUSTIN HQ - RIVERSIDE ANNEX P.O. BOX 1041 200 E RIVERSIDE ROOM 1B.1 SAN BENITO TX 78586 AUSTIN TX 78704-1204 (956)399-5103 (512)416-2498 LIMITS FROM: 1 MILE WEST OF FM 2845 (CO RD 140) LIMITS TO: FM 2845 ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 100 2002 002 PREPARING ROW STA 52.400 132 2006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 1,569.100 160 2005 FURNISHING AND PLACING TOPSOIL CY 50.000 164 2036 002 DRILL SEEDING (PERM) (RURAL) (CLAY) AC 2.900 204 2003 SPRINKLING (DUST CONTROL) MG 104.000 216 2001 PROOF ROLLING HR 5.200 1 247 2225 041 FL BS (RDWY DEL)(TY E GR 4)(FNAL POS) CY 7,123.000 1 260 2010 003 LIME TRT (NEW BASE)(12") SY 14,346.000 1 260 2016 003 LIME (HYD, COM, OR QK(SLURRY)) TON 241.000 1 260 2064 003 LIME TRT (NEW BASE) (16") SY 10,400.000 305 2014 SALV,HAUL& STKPL RCL APH PV(VAR DEPTH) SY 23,112.000 310 2001 PRIME COAT (MC-30) GAL 4,624.000 316 2707 016 ASPH (TIER III) GAL 6,935.000 316 2722 016 AGGR (GR 4P) CY 194.000 354 2041 PLANE ASPH CONC PAV (1.5") SY 178.000 400 2005 007 CEM STABIL BKFL CY 36.600 400 2006 007 CUT & RESTORING PAV SY 66.000 400 2007 007 STRUCT EXCAV (SPECIAL) CY 200.000 464 2022 006 RC PIPE (CL IV)(24 IN) LF 144.000 467 2211 SET (TY II)(24 IN)(RCP)(3:1)(C) EA 6.000 480 2001 CLEAN EXIST CULVS EA 13.000 496 2004 REMOV STR (SET) EA 2.000 496 2007 REMOV STR (PIPE) LF 46.000 500 2001 011 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 530 2011 DRIVEWAYS (ACP) SY 369.700 644 2022 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 7.000 644 2027 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1.000 644 2060 REMOVE SM RD SN SUP & AM EA 9.000 658 2316 006 INSTL OM ASSM (OM-2Z)(FLX)GND EA 6.000 658 2328 006 REMOVE DELIN & OBJECT MARKERS ASSMS EA 2.000 666 2012 008 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 10,552.000 666 2036 008 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 110.000 666 2105 008 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 1,180.000 666 2111 008 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 2,450.000 666 2126 008 REFL PAV MRK TY I (Y) 12"(SLD)(100MIL) LF 185.000 668 2064 PREFAB PAV MRK TY B (W) (ARROW) EA 2.000 668 2074 PREFAB PAV MRK TY B (W) (WORD) EA 1.000 672 2012 034 REFL PAV MRKR TY I-C EA 7.000 672 2015 034 REFL PAV MRKR TY II-A-A EA 164.000 1122 2017 001 CONSTRUCTION EXITS (INSTALL) (TY 2) SY 156.000 1122 2019 001 CONSTRUCTION EXITS (REMOVE) SY 156.000 1122 2024 001 BACKHOE WORK (EROSION & SEDM CONT) HR 6.000 1122 2037 001 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 400.000 1122 2048 001 BIOGRD EROSN CONT LOGS (12" DIA)INSTALL LF 432.000 1122 2056 001 BIODEGRADBLE EROSION CONTROL LOGS REMOV LF 432.000 1122 2057 001 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 400.000 3224 2047 D-GR HMA(QCQA) TY-D SAC-A PG76-22 TON 1,992.000 ALTERNATE NO. 1A 247 2225 041 FL BS (RDWY DEL)(TY E GR 4)(FNAL POS) CY 7,123.000 275 2001 003 CEMENT TON 241.000 275 2032 003 CEMENT TREAT (NEW BASE) (16") SY 10,400.000 275 2035 003 CEMENT TREAT (NEW BASE)(12") SY 14,346.000 ALTERNATE NO. 1B 247 2400 041 FL BS (RDWY DEL)(TY D GR 4)(FNAL POS) CY 7,123.000 275 2001 003 CEMENT TON 241.000 275 2032 003 CEMENT TREAT (NEW BASE) (16") SY 10,400.000 275 2035 003 CEMENT TREAT (NEW BASE)(12") SY 14,346.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $ 500.00