***** OFFICIAL NOTICE ***** *** STATE LET CONSTRUCTION CONTRACT *** COUNTY: LUBBOCK HIGHWAY: CS LENGTH: 1.482 MI CONTROL NUMBER: 0905-06-081 DBE GOAL: 4.0 % PROJECT NUMBER: STP 2013(019)MM TYPE: GRAD, BASE, C&G, ACP, STR TIME FOR COMPLETION: 148 WORKING DAYS GUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 5, 2012 * EST.COST: 6,296,808.06 BIDS WILL BE OPENED: 1:00 PM December 5, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION BARNETT, WILL AUSTIN HQ - RIVERSIDE ANNEX 135 SLATON ROAD 200 E RIVERSIDE ROOM 1B.1 LUBBOCK TX 79404 AUSTIN TX 78704-1204 (806)748-4466 (512)416-2498 LIMITS FROM: SLIDE ROAD, FROM US 84 LIMITS TO: MARSHALL STREET ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 100 2002 002 PREPARING ROW STA 78.600 104 2017 REMOVING CONC (DRIVEWAYS) SY 226.000 104 2022 REMOVING CONC (CURB AND GUTTER) LF 420.000 105 2002 REMOVING STAB BASE AND ASPH PAV (2") SY 2,215.000 105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY 2,731.000 110 2001 EXCAVATION (ROADWAY) CY 8,129.000 110 2002 EXCAVATION (CHANNEL) CY 18,166.000 132 2006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 30,659.000 134 2002 BACKFILL (TY B) STA 26.500 160 2002 FURNISHING AND PLACING TOPSOIL (6") STA 72.750 164 2013 002 STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY) SY 14,700.000 164 2053 002 DRILL SEEDING (TEMP)(WARM OR COOL) AC 8.300 168 2001 VEGETATIVE WATERING MG 1,850.000 169 2006 002 SOIL RETENTION BLANKETS (CL 2) (TY F) SY 11,000.000 216 2001 PROOF ROLLING HR 100.000 275 2001 003 CEMENT TON 480.000 275 2060 003 CEMENT TREAT (EXIST MATL)(DC)(6") SY 56,611.000 292 2002 ASPHALT STAB BASE (GR 1)(PG 64) TON 1,746.000 310 2001 PRIME COAT (MC-30) GAL 1,587.000 316 2705 016 ASPH (TIER I) GAL 3,969.000 316 2717 016 AGGR (TIER I) CY 93.000 344 2294 009 PRF-DSGN-MX CMHB-F SAC-A PG70-28 TON 873.000 360 2002 003 CONC PVMT (CONT REINF-CRCP)(9") SY 46,703.000 400 2005 CEM STABIL BKFL CY 189.000 402 2001 TRENCH EXCAVATION PROTECTION LF 306.000 416 2029 001 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 528.000 420 2001 002 CL A CONC (MISC) CY 3.100 420 2005 002 CL C CONC (FOOTING) CY 59.000 420 2029 002 CL S CONC (SLAB) CY 74.000 420 2287 002 CL S CONC (APPR SLAB)(MOD) CY 52.500 432 2002 RIPRAP (CONC)(5 IN) CY 342.000 432 2021 RIPRAP (STONE PROTECTION)(18 IN) CY 813.000 462 2003 015 CONC BOX CULV (4 FT X 2 FT) LF 1,004.000 462 2021 015 CONC BOX CULV (8 FT X 6 FT) LF 690.000 466 2005 WINGWALL (SW-0)(HW=3 FT) EA 4.000 466 2052 WINGWALL (PW)(HW=8 FT) EA 2.000 467 2177 SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1)(P) EA 4.000 479 2001 ADJ MANHS EA 1.000 479 2005 ADJ MANHS (WATER VALVE BOX) EA 2.000 500 2001 011 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 529 2004 CONC CURB & GUTTER (TY II) LF 29,724.000 529 2009 CONCRETE CURB (SPECIAL) LF 49.000 529 2011 CONC CURB & GUTTER (SAWTOOTH) LF 1,122.000 530 2022 006 DRIVEWAYS AND TURNOUTS (CONC) SY 218.000 531 2006 CURB RAMPS (TY 2) EA 2.000 531 2011 CURB RAMPS (TY 8) EA 8.000 531 2013 CURB RAMPS (TY 20) EA 2.000 536 2002 CONC MEDIAN SY 78.100 610 2052 015 INS RD IL AM (TY ST) 40T-8 (.25 KW)S EA 66.000 618 2018 CONDT (PVC) (SCHD 40) ( 2") LF 13,421.000 618 2035 CONDT (PVC) (SCHD 80) (2") (BORE) LF 728.000 620 2011 001 ELEC CONDR (NO. 8) BARE LF 14,581.000 620 2012 001 ELEC CONDR (NO. 8) INSULATED LF 29,228.000 624 2008 014 GROUND BOX TY A (122311) W/APRON EA 6.000 628 2017 003 ELC SRV TY A 240/480 060 (NS)SS(E)SP(O) EA 3.000 644 2007 IN SM RD SN SUP&AM TY10BWG(1)SB(P) EA 33.000 644 2035 IN SM RD SN SUP&AM TYS80(1)SB(T) EA 3.000 644 2056 RELOCATE SM RD SN SUP & AM TY 10BWG EA 1.000 658 2318 INSTL OM ASSM (OM-2Z)(FLX)SRF EA 10.000 668 2063 PREFAB PAV MRK TY B (W) (24") (SLD) LF 152.000 668 2064 PREFAB PAV MRK TY B (W) (ARROW) EA 24.000 672 2010 034 REFL PAV MRKR TY I-A EA 10.000 672 2017 034 REFL PAV MRKR TY II-C-R EA 538.000 678 2001 PAV SURF PREP FOR MRK ( 4") LF 5,146.000 678 2003 PAV SURF PREP FOR MRK ( 8") LF 2,292.000 678 2004 PAV SURF PREP FOR MRK (12") LF 208.000 678 2006 PAV SURF PREP FOR MRK (24") LF 152.000 678 2007 PAV SURF PREP FOR MRK (ARROW) EA 18.000 1122 2002 001 ROCK FILTER DAMS (INSTALL) (TY 2) LF 360.000 1122 2016 001 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 200.000 1122 2019 001 CONSTRUCTION EXITS (REMOVE) SY 200.000 1122 2034 001 SANDBAGS FOR EROSION CONTROL (18") LF 840.000 1122 2037 001 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 6,575.000 1122 2057 001 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 6,575.000 3224 2040 D-GR HMA(QCQA) TY-D PG64-22 TON 3,113.000 6473 2001 001 MULTIPOLYMER PAV MRK (W)(4")(SLD) LF 1,695.000 6473 2002 001 MULTIPOLYMER PAV MRK (W)(4")(BRK) LF 3,780.000 6473 2007 001 MULTIPOLYMER PAV MRK (W)(8")(SLD) LF 4,492.000 6473 2009 001 MULTIPOLYMER PAV MRK (W)(12")(SLD) LF 208.000 6473 2011 001 MULTIPOLYMER PAV MRK (Y)(4")(SLD) LF 1,547.000 6834 2002 001 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $ 10,000.00