***** OFFICIAL NOTICE ***** *** STATE LET CONSTRUCTION CONTRACT *** COUNTY: SHELBY HIGHWAY: FM 711 LENGTH: 8.686 MI CONTROL NUMBER: 0895-01-014 DBE GOAL: 4.0 % PROJECT NUMBER: STP 2013(243) TYPE: RECONSTRUCT AND WIDEN PAVEMENT TIME FOR COMPLETION: 138 WORKING DAYS GUARANTY: 68,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 5, 2012 * EST.COST: 3,418,099.37 BIDS WILL BE OPENED: 1:00 PM December 5, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION LEE, C. MICHAEL AUSTIN HQ - RIVERSIDE ANNEX 918 INDUSTRIAL DRIVE 200 E RIVERSIDE ROOM 1B.1 NACOGDOCHES, TX TX 75961 AUSTIN TX 78704-1204 (936)564-7782 (512)416-2498 LIMITS FROM: SH 7 LIMITS TO: SAN AUGUSTINE COUNTY LINE ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 100 2002 002 PREPARING ROW STA 458.600 104 2017 REMOVING CONC (DRIVEWAYS) SY 24.000 112 2001 SUBGRADE WIDENING (ORD COMP) STA 458.600 132 2019 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) CY 203.000 134 2002 BACKFILL (TY B) STA 458.600 158 2003 SPEC EXCAV WORK (HYD EXCAVATOR) HR 20.000 164 2009 002 BROADCAST SEED (TEMP) (WARM) SY 50,958.000 164 2011 002 BROADCAST SEED (TEMP) (COOL) SY 50,958.000 164 2021 002 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 101,916.000 168 2001 VEGETATIVE WATERING MG 1,019.200 169 2003 002 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 275.000 204 2003 SPRINKLING (DUST CONTROL) MG 1,223.000 247 2134 045 FL BS (RDWY DEL) (TY D GR 2) TON 28,055.000 275 2001 003 CEMENT TON 2,324.000 275 2023 003 CEMENT TREAT(MX EXST MTL & NW BS)(12") SY 122,299.000 316 2015 016 ASPH (RC-250) GAL 30,575.000 316 2425 016 AGGR (TY-E GR-3 OR TY-L GR-3) CY 1,359.000 316 2427 016 AGGR (TY-E GR-5 OR TY-L GR-5) CY 940.000 316 2566 016 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 110,068.000 316 2644 016 AGGR (TY PE, PL, E, OR L GR-4 SAC-B) CY 1,112.000 340 2106 003 D-GR HMA(METH) TY-D PG64-22 TON 25.000 500 2001 011 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 530 2010 006 DRIVEWAYS (CONC) SY 20.000 530 2011 006 DRIVEWAYS (ACP) SY 3,689.000 530 2017 006 TURNOUTS (ACP) SY 1,998.000 540 2001 031 MTL W-BEAM GD FEN (TIM POST) LF 125.000 542 2001 REMOVING METAL BEAM GUARD FENCE LF 125.000 542 2002 REMOVING TERMINAL ANCHOR SECTION EA 1.000 544 2006 001 GDRAIL END TRT(INST)(WOOD POST)(TY III) EA 2.000 544 2012 001 GDRAIL END TRT(REMOV)(WOOD POST)TY III EA 1.000 560 2004 001 MAILBOX INSTALL-S (WC-POST) TY 3 FND EA 49.000 560 2005 001 MAILBOX INSTALL-D (WC-POST) TY 3 FND EA 5.000 644 2001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 13.000 644 2004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 3.000 644 2006 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 644 2060 REMOVE SM RD SN SUP & AM EA 57.000 644 2081 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 40.000 658 2241 INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2(BI) EA 3.000 662 2004 WK ZN PAV MRK NON-REMOV (W) 4" (SLD) LF 183,448.000 662 2030 WK ZN PAV MRK NON-REMOV (Y) 4" (BRK) LF 22,931.000 662 2032 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 141,098.000 662 2115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 10,323.000 666 2012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 91,724.000 666 2105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 4,491.000 666 2111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 70,549.000 668 2105 PREFAB PAV MRK TY C (W) (24") (SLD) LF 12.000 672 2015 034 REFL PAV MRKR TY II-A-A EA 1,148.000 1122 2002 001 ROCK FILTER DAMS (INSTALL) (TY 2) LF 90.000 1122 2009 001 ROCK FILTER DAMS (REMOVE) LF 90.000 1122 2037 001 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 4,470.000 1122 2057 001 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 4,470.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $ 1,500.00