***** OFFICIAL NOTICE ***** *** STATE LET CONSTRUCTION CONTRACT *** COUNTY: BELL HIGHWAY: FM 935 LENGTH: 6.828 MI CONTROL NUMBER: 0752-03-021 DBE GOAL: 7.0 % PROJECT NUMBER: STP 2013(275) TYPE: WIDEN PAVEMENT TO ADD SHOULDERS PROV SAFTY UPGR TIME FOR COMPLETION: 140 WORKING DAYS GUARANTY: 47,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 5, 2012 * EST.COST: 2,345,444.55 BIDS WILL BE OPENED: 1:00 PM December 5, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION BASHI ALI AUSTIN HQ - RIVERSIDE ANNEX 4100 W LP 121 200 E RIVERSIDE ROOM 1B.1 BELTON TX 76513 AUSTIN TX 78704-1204 (254)939-3778 (512)416-2498 LIMITS FROM: IH 35 LIMITS TO: FALLS CO LINE ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 100 2002 002 PREPARING ROW STA 358.900 104 2009 REMOVING CONC (RIPRAP) SY 118.000 132 2020 EMBANKMENT (VEHICLE)(DENS CONT)(TY B) CY 300.000 152 2003 ROAD GRADER WORK (DENS CONT) STA 322.100 164 2036 002 DRILL SEEDING (PERM) (RURAL) (CLAY) AC 31.800 164 2042 002 DRILL SEEDING (TEMP) (WARM) AC 15.900 164 2044 002 DRILL SEEDING (TEMP) (COOL) AC 15.900 168 2001 VEGETATIVE WATERING MG 2,499.500 169 2001 002 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 500.000 216 2001 PROOF ROLLING HR 30.000 247 2056 038 FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS) CY 8,884.000 275 2001 003 CEMENT TON 1,675.200 275 2011 003 CEMENT TREAT(EXIST MATL)(8") SY 101,152.000 310 2016 PRIME COAT (RC-250) GAL 22,253.000 316 2363 016 AGGR (TY-PD GR-4 OR TY-PL GR-4)(SAC-B) CY 878.000 316 2406 016 AGGR (TY-B GR-5 OR TY-L GR-5 SAC-B) CY 723.000 316 2616 016 ASPH(AC-15P,AC-20XP,AC10-2TR,AC-12-5TR) GAL 38,496.000 351 2004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 500.000 430 2012 CL C CONC FOR EXT STRU (CULV)(3'X 2') LF 3.000 430 2035 CL C CONC FOR EXT STRU (CULV)(4'X3') LF 27.000 430 2065 CL C CONC FOR EXT STRU (CULV)(2-6'X6') LF 24.000 430 2082 CL C CONC EXT STR (CULV)(8'X 3') LF 6.000 430 2085 CL C CONC FOR EXT STR (CULV)(1-10'X3') LF 29.000 430 2100 CL C CONC FOR EXT STR (CULV)(6'X 2') LF 3.000 432 2039 RIPRAP (MOW STRIP)(4 IN) CY 62.000 432 2066 RIPRAP (CONC)(CL B) CY 18.000 450 2130 001 RAIL (TY T401)(RETROFIT) LF 362.830 452 2002 REMOV RAIL (METAL ELEMENTS) LF 400.000 460 2004 CMP (GAL STL 24 IN) LF 23.000 464 2003 006 RC PIPE (CL III)(18 IN) LF 1,698.000 464 2005 006 RC PIPE (CL III)(24 IN) LF 166.000 466 2048 WINGWALL (PW)(HW=4 FT) EA 4.000 466 2052 WINGWALL (PW)(HW=8 FT) EA 2.000 467 2024 SET (TY I)(S= 3 FT)(HW= 4 FT)(3:1)(C) EA 1.000 467 2031 SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1)(C) EA 1.000 467 2048 SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1)(C) EA 1.000 467 2066 SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1)(C) EA 2.000 467 2262 SET (TY II)(24 IN)(CMP)(4:1)(C) EA 3.000 467 2286 SET (TY II)(18 IN)(RCP)(6:1)(P) EA 106.000 467 2288 SET (TY II)(24 IN)(RCP)(6:1)(P) EA 4.000 496 2004 REMOV STR (SET) EA 14.000 496 2007 REMOV STR (PIPE) LF 979.000 500 2001 011 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 11.000 530 2011 DRIVEWAYS (ACP) SY 6,287.000 540 2002 023 MTL W-BEAM GD FEN (STEEL POST) LF 725.000 540 2011 023 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 540 2030 023 MTL BEAM GD FEN (MOVE AND RESET) LF 450.000 540 2044 023 DOWNSTREAM ANCHOR TERMINAL(DAT)SECTION EA 3.000 542 2001 REMOVING METAL BEAM GUARD FENCE LF 300.000 542 2002 REMOVING TERMINAL ANCHOR SECTION EA 6.000 544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 3.000 544 2002 GUARDRAIL END TREATMENT (MOVE & RESET) EA 6.000 544 2003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 560 2004 001 MAILBOX INSTALL-S (WC-POST) TY 3 FND EA 23.000 560 2005 001 MAILBOX INSTALL-D (WC-POST) TY 3 FND EA 1.000 560 2009 001 MAILBOX INSTALL-M (TWG-POST) TY 1 FND EA 1.000 644 2001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 5.000 644 2004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 4.000 644 2006 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 644 2027 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1.000 644 2053 IN SM RD SN SUP&AM TYTWT(1)WA(P) EA 46.000 644 2054 IN SM RD SN SUP&AM TYTWT(1)WA(T) EA 12.000 644 2060 REMOVE SM RD SN SUP & AM EA 2.000 644 2064 IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL) EA 7.000 644 2065 RELOCATE SM RD SN SUP & AM TY TEMP EA 72.000 658 2316 INSTL OM ASSM (OM-2Z)(FLX)GND EA 22.000 662 2030 WK ZN PAV MRK NON-REMOV (Y) 4" (BRK) LF 3,710.000 662 2032 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 33,993.000 662 2115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 4,132.000 666 2048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 246.000 668 2112 PREFAB PAV MRK TY C (W) (RR XING) EA 2.000 672 2015 034 REFL PAV MRKR TY II-A-A EA 801.000 672 2024 034 TRAFFIC BUTTON TY W EA 20.000 1122 2002 001 ROCK FILTER DAMS (INSTALL) (TY 2) LF 450.000 1122 2009 001 ROCK FILTER DAMS (REMOVE) LF 450.000 1122 2024 001 BACKHOE WORK (EROSION & SEDM CONT) HR 150.000 1122 2037 001 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 2,500.000 1122 2057 001 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 2,500.000 8251 2006 005 RE PM W/RET REQ TY I(W)4"(SLD)(100MIL) LF 72,106.000 8251 2015 005 RE PM W/RET REQ TY I(Y)4"(BRK)(100MIL) LF 3,710.000 8251 2018 005 RE PM W/RET REQ TY I(Y)4"(SLD)(100MIL) LF 33,993.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: RAILROAD FORCE ACCOUNT WORK $ 800.00