***** OFFICIAL NOTICE ***** *** STATE LET CONSTRUCTION CONTRACT *** COUNTY: BAYLOR HIGHWAY: US 277 LENGTH: 11.161 MI CONTROL NUMBER: 0157-01-062 DBE GOAL: 4.0 % PROJECT NUMBER: NH 2013(235) TYPE: UPGRADE TO 4 LANE FACILITY TIME FOR COMPLETION: 385 WORKING DAYS GUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 5, 2012 * EST.COST: 12,139,987.55 BIDS WILL BE OPENED: 1:00 PM December 5, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION FLEMING, JESSE AUSTIN HQ - RIVERSIDE ANNEX 848 US 380 WEST 200 E RIVERSIDE ROOM 1B.1 GRAHAM TX 76450 AUSTIN TX 78704-1204 (940)549-0676 (512)416-2498 LIMITS FROM: KNOX COUNTY LINE LIMITS TO: 2.155 MILES WEST OF US 183 ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 100 2002 002 PREPARING ROW STA 618.300 104 2009 REMOVING CONC (RIPRAP) SY 544.000 105 2045 REMOVING STAB BASE AND ASPH PAV (2"-8") SY 9,621.000 106 2001 OBLITERATING ABANDONED ROAD STA 74.500 110 2001 EXCAVATION (ROADWAY) CY 77,364.000 110 2002 EXCAVATION (CHANNEL) CY 842.000 132 2004 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 160,508.000 164 2036 002 DRILL SEEDING (PERM) (RURAL) (CLAY) AC 105.200 164 2042 002 DRILL SEEDING (TEMP) (WARM) AC 52.600 164 2044 002 DRILL SEEDING (TEMP) (COOL) AC 52.600 168 2001 VEGETATIVE WATERING MG 5,716.000 247 2342 033 FL BS (CMP IN PLACE)(TY A GR 2)(8") SY 309,773.000 275 2001 003 CEMENT TON 3,450.000 275 2010 003 CEMENT TREAT (SUBGRADE) (8") SY 318,994.000 310 2001 PRIME COAT (MC-30) GAL 60,762.000 316 2223 016 AGGR(TY-PB GR-4 SAC-B) CY 2,210.000 316 2446 016 ASPH (AC-20XP OR AC-20-5TR) GAL 93,384.000 351 2004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 200.000 402 2001 TRENCH EXCAVATION PROTECTION LF 130.000 430 2008 CL C CONC FOR EXT STRU(CULV)(3'X 3') LF 310.000 430 2012 CL C CONC FOR EXT STRU (CULV)(3'X 2') LF 177.000 430 2020 CL C CONC FOR EXT STR (CULV)(4'X 2') LF 176.000 430 2104 CL C CONC FOR EXT STRU (CULV)(3-6'X6') LF 168.000 430 2142 CL C CONC FOR EXT STRU (CULV)(2-5'X5') LF 90.000 432 2002 RIPRAP (CONC)(5 IN) CY 54.900 462 2002 015 CONC BOX CULV (3 FT X 3 FT) LF 102.000 462 2003 015 CONC BOX CULV (4 FT X 2 FT) LF 72.000 464 2005 006 RC PIPE (CL III)(24 IN) LF 1,844.000 464 2007 006 RC PIPE (CL III)(30 IN) LF 240.000 465 2003 001 INLET (COMPL)(TY H) EA 1.000 465 2215 001 INLET (COMPL)(TY H)(SPL) EA 8.000 467 2101 SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C) EA 2.000 467 2102 SET (TY I)(S= 3 FT)(HW= 4 FT)(4:1)(C) EA 8.000 467 2107 SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1)(C) EA 2.000 467 2116 SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1)(C) EA 2.000 467 2123 SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1)(C) EA 6.000 467 2154 SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1)(C) EA 2.000 467 2224 SET (TY II)(24 IN)(RCP)(4:1)(C) EA 4.000 467 2225 SET (TY II)(30 IN)(RCP)(4:1)(C) EA 6.000 467 2288 SET (TY II)(24 IN)(RCP)(6:1)(P) EA 62.000 496 2007 REMOV STR (PIPE) LF 337.000 496 2008 REMOV STR (BOX CULVERT) LF 60.000 500 2001 011 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 26.000 530 2005 INTERSECTIONS (ACP) SY 578.000 530 2012 DRIVEWAYS (SURF TREAT) SY 657.000 533 2006 014 SHOULDER TEXTURING (MILLED)(ASPHALT) LF 206,835.000 542 2001 REMOVING METAL BEAM GUARD FENCE LF 800.000 544 2003 GUARDRAIL END TREATMENT (REMOVE) EA 12.000 560 2004 001 MAILBOX INSTALL-S (WC-POST) TY 3 FND EA 1.000 644 2004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 25.000 644 2025 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 59.000 644 2027 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 7.000 644 2028 IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT) EA 3.000 644 2031 IN SM RD SN SUP&AM TYS80(1)SA(U-WC) EA 2.000 644 2060 REMOVE SM RD SN SUP & AM EA 144.000 644 2081 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 57.000 644 2082 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 53.000 658 2256 INSTL DEL ASSM (D-SW)SZ 2(WC) GND(BI) EA 30.000 658 2316 INSTL OM ASSM (OM-2Z)(FLX)GND EA 29.000 662 2113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 4,470.000 666 2003 REFL PAV MRK TY I (W) 4" (BRK)(100MIL) LF 30,820.000 666 2012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 125,810.000 666 2036 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 19,120.000 666 2048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 58.000 666 2102 REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA 280.000 666 2111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 126,110.000 666 2178 REF PAV MRK TY II (Y) 4" (SLD) LF 119,200.000 668 2106 PREFAB PAV MRK TY C (W) (ARROW) EA 64.000 668 2116 PREFAB PAV MRK TY C (W) (WORD) EA 64.000 672 2012 034 REFL PAV MRKR TY I-C EA 956.000 672 2015 034 REFL PAV MRKR TY II-A-A EA 49.000 672 2017 034 REFL PAV MRKR TY II-C-R EA 1,542.000 677 2001 ELIM EXT PAV MRK & MRKS ( 4") LF 1,000.000 1122 2002 001 ROCK FILTER DAMS (INSTALL) (TY 2) LF 6,900.000 1122 2009 001 ROCK FILTER DAMS (REMOVE) LF 6,900.000 1122 2016 001 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 2,045.000 1122 2019 001 CONSTRUCTION EXITS (REMOVE) SY 2,045.000 1122 2035 001 SANDBAGS FOR EROSION CONTROL (2') LF 1,890.000 1122 2037 001 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 44,534.000 1122 2057 001 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 44,534.000 3224 2042 D-GR HMA(QCQA) TY-D SAC-B PG70-22 TON 32,633.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $ 10,000.00