***** OFFICIAL NOTICE ***** *** STATE LET CONSTRUCTION CONTRACT *** COUNTY: WICHITA HIGHWAY: SH 240 LENGTH: 4.518 MI CONTROL NUMBER: 0156-03-045 DBE GOAL: 3.0 % PROJECT NUMBER: STP 2013(234) TYPE: OVERLAY TIME FOR COMPLETION: 32 WORKING DAYS GUARANTY: 17,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 4, 2012 EST.COST: 871,641.85 BIDS WILL BE OPENED: 1:00 PM December 4, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION DAVID M. ROHMER AUSTIN HQ - RIVERSIDE ANNEX 2844 E. CENTRAL FRWY 200 E RIVERSIDE ROOM 1B.1 WICHITA FALLS, TX TX 76301 AUSTIN TX 78704-1204 (940)397-7717 (512)416-2498 LIMITS FROM: NEAR MISSLE ROAD LIMITS TO: WICHITA RIVER ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 315 2011 FOG SEAL (HARD RESIDUE SURFACE SEALANT) GAL 3,940.000 354 2090 PLANE ASPH CONC PAV (3/4") SY 536.000 432 2039 RIPRAP (MOW STRIP)(4 IN) CY 34.000 500 2001 005 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 540 2001 031 MTL W-BEAM GD FEN (TIM POST) LF 500.000 542 2001 REMOVING METAL BEAM GUARD FENCE LF 650.000 542 2002 REMOVING TERMINAL ANCHOR SECTION EA 6.000 544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 6.000 658 2241 INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2(BI) EA 9.000 662 2113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 1,750.000 662 2114 WK ZN PAV MRK SHT TERM (TAB) TY Y EA 2,504.000 666 2003 REFL PAV MRK TY I (W) 4" (BRK)(100MIL) LF 5,550.000 666 2012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 46,250.000 666 2030 REFL PAV MRK TY I (W) 8" (DOT)(100MIL) LF 36.000 666 2036 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 1,645.000 666 2048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 628.000 666 2105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 1,078.000 666 2111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 43,713.000 666 2123 REFL PAV MRK TY I (Y) 8" (SLD)(100MIL) LF 128.000 668 2106 PREFAB PAV MRK TY C (W) (ARROW) EA 16.000 668 2116 PREFAB PAV MRK TY C (W) (WORD) EA 7.000 672 2012 034 REFL PAV MRKR TY I-C EA 356.000 672 2015 034 REFL PAV MRKR TY II-A-A EA 832.000 3260 2001 TOM (ASPHALT) PG 76-22 TON 402.000 3260 2002 TOM (AGGREGATE) SAC A TON 5,994.000