***** OFFICIAL NOTICE ***** *** STATE LET CONSTRUCTION CONTRACT *** COUNTY: SHELBY HIGHWAY: US 59 LENGTH: 2.163 MI CONTROL NUMBER: 0063-06-094 DBE GOAL: 2.0 % PROJECT NUMBER: NH 2013(283) TYPE: REHABILITATE EXISTING PAVEMENT TIME FOR COMPLETION: 73 WORKING DAYS GUARANTY: 74,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 5, 2012 * EST.COST: 3,690,277.73 BIDS WILL BE OPENED: 1:00 PM December 5, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION LEE, C MICHAEL AUSTIN HQ - RIVERSIDE ANNEX 918 INDUSTRIAL DRIVE 200 E RIVERSIDE ROOM 1B.1 NACOGDOCHES TX 75961 AUSTIN TX 78704-1204 (936)564-7782 (512)416-2498 LIMITS FROM: PANOLA COUNTY LINE LIMITS TO: SP RAILROAD OVERPASS IN TENAHA ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 104 2001 REMOVING CONC (PAV) SY 280.000 104 2017 REMOVING CONC (DRIVEWAYS) SY 19.000 105 2074 REMOVING STAB BASE AND ASPH PAV (4") SY 191.000 105 2084 REM STAB BASE & ASPH (6"-12") SY 280.000 134 2002 BACKFILL (TY B) STA 192.540 162 2002 BLOCK SODDING SY 275.000 164 2021 002 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 22,113.000 168 2001 VEGETATIVE WATERING MG 111.900 316 2431 016 AGGR(TY-E OR TY-L GR-4) CY 1,058.000 316 2576 016 ASPH (AC-10-2TR OR AC-15P) GAL 40,752.000 340 2011 003 D-GR HMA(METH) TY-B PG64-22 TON 185.000 340 2106 003 D-GR HMA(METH) TY-D PG64-22 TON 139.000 342 2002 002 PFC (ASPHALT) PG76-22 TON 548.000 342 2006 002 PFC (AGGREGATE)(PG76 MIX) SAC-A TON 7,312.000 344 2332 PRF-DSGN-MX SP-B PG76-22 TON 15,546.000 354 2057 PLANE ASPH CONC PAV (4") SY 70,662.000 400 2008 004 CUT & RESTORING PAV (ASPH) SY 14.000 400 2010 004 CUT & RESTORING PAV (FLEX BASE) SY 22.000 403 2001 TEMPORARY SPL SHORING SF 396.000 430 2141 CL C CONC FOR EXT STR (CULV)(2-10'X10') LF 6.000 432 2050 RIPRAP (CONC)(CL B)(5 IN) CY 15.200 464 2003 006 RC PIPE (CL III)(18 IN) LF 176.000 464 2005 006 RC PIPE (CL III)(24 IN) LF 44.000 466 2041 WINGWALL (FW-S)(HW=11 FT) EA 1.000 467 2285 SET (TY II)(15 IN)(RCP)(6:1)(P) EA 5.000 467 2286 SET (TY II)(18 IN)(RCP)(6:1)(P) EA 10.000 467 2288 SET (TY II)(24 IN)(RCP)(6:1)(P) EA 4.000 496 2016 REMOV STR (PIPE) EA 7.000 500 2001 011 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 530 2010 006 DRIVEWAYS (CONC) SY 19.000 533 2006 014 SHOULDER TEXTURING (MILLED)(ASPHALT) LF 29,098.000 540 2001 031 MTL W-BEAM GD FEN (TIM POST) LF 712.500 540 2011 031 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 6.000 540 2014 031 MTL W-BEAM GD FEN (LOW FILL CULVERT) LF 37.500 540 2044 031 DOWNSTREAM ANCHOR TERMINAL(DAT)SECTION EA 1.000 542 2001 REMOVING METAL BEAM GUARD FENCE LF 787.500 542 2002 REMOVING TERMINAL ANCHOR SECTION EA 2.000 542 2003 RM MTL BM GD FEN TRANS (THRIE-BEAM) EA 3.000 544 2003 001 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 544 2006 001 GDRAIL END TRT(INST)(WOOD POST)(TY III) EA 5.000 658 2240 INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2 EA 13.000 658 2258 INSTL DEL ASSM (D-SW)SZ (TYC)CTB EA 34.000 662 2001 WK ZN PAV MRK NON-REMOV (W) 4" (BRK) LF 5,750.000 662 2012 WK ZN PAV MRK NON-REMOV (W) 8" (SLD) LF 3,520.000 662 2030 WK ZN PAV MRK NON-REMOV (Y) 4" (BRK) LF 3,060.000 662 2032 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 26,576.000 662 2113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 4,132.000 662 2115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 2,172.000 662 2116 WK ZN PAV MRK SHT TERM RMV(W)(4") LF 3,074.000 662 2117 WK ZN PAV MRK SHT TERM RMV(Y)(4") LF 4,626.000 666 2002 REFL PAV MRK TY I (W) 4" (BRK)(090MIL) LF 6,370.000 666 2011 REFL PAV MRK TY I (W) 4" (SLD)(090MIL) LF 28,893.000 666 2038 REFL PAV MRK TY I (W) 12"(LNDP)(090MIL) LF 180.000 666 2041 REFL PAV MRK TY I (W) 12"(SLD)(090MIL) LF 300.000 666 2104 REFL PAV MRK TY I (Y) 4" (BRK)(090MIL) LF 3,060.000 666 2110 REFL PAV MRK TY I (Y) 4" (SLD)(090MIL) LF 34,273.000 666 2122 REFL PAV MRK TY I (Y) 8" (SLD)(090MIL) LF 2,280.000 666 2189 PAVEMENT SEALER 4" LF 6,540.000 666 2191 PAVEMENT SEALER 8" LF 160.000 668 2105 PREFAB PAV MRK TY C (W) (24") (SLD) LF 24.000 668 2106 PREFAB PAV MRK TY C (W) (ARROW) EA 3.000 668 2116 PREFAB PAV MRK TY C (W) (WORD) EA 3.000 672 2012 034 REFL PAV MRKR TY I-C EA 359.000 672 2015 034 REFL PAV MRKR TY II-A-A EA 664.000 672 2017 034 REFL PAV MRKR TY II-C-R EA 144.000 677 2001 ELIM EXT PAV MRK & MRKS ( 4") LF 6,540.000 677 2003 ELIM EXT PAV MRK & MRKS ( 8") LF 160.000 1122 2037 001 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 1,600.000 1122 2057 001 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 1,600.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $ 1,000.00