Detail Letting Schedule for Titus County (FY 2017)
Titus County (FY 2017) |
CCSJ: 0010-06-041 |
|||
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | STP 2017(053)HESG | CSJ: | 0010-06-041 |
Description: | PROFILE EDGELINE MARKINGS | Handling Code: | |
Limits From: | US 271 | Fund Cat: | 8 |
Limits To: | FRANKLIN C/L | ESTIMATE: | $143,011 |
Length: | 7.7 | Actual | $104,676 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | SH 11 | Let Status: | Actual |
Project ID: | STP 2017(054)HESG | CSJ: | 0083-08-049 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | 1.0 MI. E. OF US 271 | Fund Cat: | 8 |
Limits To: | TITUS C/L | ESTIMATE: | $76,402 |
Length: | 3.8 | Actual | $65,897 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | SH 11 | Let Status: | Actual |
Project ID: | STP 2017(055)HESG | CSJ: | 0218-05-030 |
Description: | PROFILE EDGELINE MARKINGS | Handling Code: | |
Limits From: | 2.5 MI. W. OF FM 130 | Fund Cat: | 8 |
Limits To: | FM 130 | ESTIMATE: | $38,683 |
Length: | 2.5 | Actual | $33,295 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | SH 11 | Let Status: | Actual |
Project ID: | STP 2017(056)HESG | CSJ: | 0218-06-025 |
Description: | PROFILE EDGELINE MARKINGS | Handling Code: | |
Limits From: | SH 49 | Fund Cat: | 8 |
Limits To: | 2.5 W. OF FM 130 | ESTIMATE: | $107,955 |
Length: | 6.9 | Actual | $92,947 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | STP 2017(057)HESG | CSJ: | 0222-04-056 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | SH 11 | Fund Cat: | 8 |
Limits To: | SH 155 | ESTIMATE: | $148,741 |
Length: | 7.7 | Actual | $128,696 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | STP 2017(058)HESG | CSJ: | 0223-02-030 |
Description: | PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS | Handling Code: | |
Limits From: | SH 43 | Fund Cat: | 8 |
Limits To: | LA LINE | ESTIMATE: | $166,853 |
Length: | 8.0 | Actual | $143,764 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | FM 3384 | Let Status: | Actual |
Project ID: | STP 2017(059)HESG | CSJ: | 0248-08-012 |
Description: | PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS | Handling Code: | |
Limits From: | US 271 N | Fund Cat: | 8 |
Limits To: | US 271 S | ESTIMATE: | $95,714 |
Length: | 4.6 | Actual | $61,018 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | SH 77 | Let Status: | Actual |
Project ID: | STP 2017(060)HESG | CSJ: | 0277-02-049 |
Description: | PROFILE CENTERLINE & EDGELINE MARKINGS | Handling Code: | |
Limits From: | CASS C/L | Fund Cat: | 8 |
Limits To: | FM 250 | ESTIMATE: | $143,919 |
Length: | 6.8 | Actual | $124,219 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | SH 77 | Let Status: | Actual |
Project ID: | STP 2017(061)HESG | CSJ: | 0278-01-055 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | 0.2 MI E FM 1841 | Fund Cat: | 8 |
Limits To: | LOUISIANA STATE LINE | ESTIMATE: | $189,476 |
Length: | 9.4 | Actual | $163,171 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | FM 1840 | Let Status: | Actual |
Project ID: | STP 2017(062)HESG | CSJ: | 0330-01-031 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | SH 98 | Fund Cat: | 8 |
Limits To: | SH 8 | ESTIMATE: | $55,952 |
Length: | 3.5 | Actual | $48,376 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | FM 728 | Let Status: | Actual |
Project ID: | STP 2017(063)HESG | CSJ: | 0843-03-014 |
Description: | PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS | Handling Code: | |
Limits From: | 3.63 MI N OF SH 49 | Fund Cat: | 8 |
Limits To: | SH 49 | ESTIMATE: | $77,530 |
Length: | 3.6 | Actual | $49,904 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | FM 250 | Let Status: | Actual |
Project ID: | STP 2017(064)HESG | CSJ: | 0946-01-042 |
Description: | PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS | Handling Code: | |
Limits From: | FM 130 | Fund Cat: | 8 |
Limits To: | SH 11 | ESTIMATE: | $105,505 |
Length: | 4.7 | Actual | $69,011 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | FM 250 | Let Status: | Actual |
Project ID: | STP 2017(065)HESG | CSJ: | 0946-02-024 |
Description: | PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS | Handling Code: | |
Limits From: | CASS C/L | Fund Cat: | 8 |
Limits To: | US 259 | ESTIMATE: | $118,206 |
Length: | 5.2 | Actual | $105,600 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | FM 729 | Let Status: | Actual |
Project ID: | STP 2017(066)HESG | CSJ: | 1018-03-040 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | MORRIS C/L | Fund Cat: | 8 |
Limits To: | SH 49 | ESTIMATE: | $372,724 |
Length: | 18.7 | Actual | $321,361 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | FM 556 | Let Status: | Actual |
Project ID: | STP 2017(067)HESG | CSJ: | 1019-01-029 |
Description: | PROFILE CENTERLINE & EDGELINE MARKINGS | Handling Code: | |
Limits From: | FM 3042 | Fund Cat: | 8 |
Limits To: | UPSHUR C/L | ESTIMATE: | $151,251 |
Length: | 7.3 | Actual | $98,447 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | FM 556 | Let Status: | Actual |
Project ID: | STP 2017(068)HESG | CSJ: | 1019-04-029 |
Description: | PROFILE CENTERLINE & EDGELINE MARKINGS | Handling Code: | |
Limits From: | CAMP C/L | Fund Cat: | 8 |
Limits To: | FM 2088 | ESTIMATE: | $71,969 |
Length: | 3.5 | Actual | $44,852 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | FM 1840 | Let Status: | Actual |
Project ID: | STP 2017(069)HESG | CSJ: | 1215-02-015 |
Description: | PROFILE CENTERLINE & EDGELINE MARKINGS | Handling Code: | |
Limits From: | IH 30 | Fund Cat: | 8 |
Limits To: | SH 98 | ESTIMATE: | $50,880 |
Length: | 2.1 | Actual | $32,855 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | FM 1735 | Let Status: | Actual |
Project ID: | STP 2017(070)HESG | CSJ: | 1226-02-020 |
Description: | PROFILE EDGELINE MARKINGS | Handling Code: | |
Limits From: | SH 49 | Fund Cat: | 8 |
Limits To: | SH 11 | ESTIMATE: | $140,816 |
Length: | 8.2 | Actual | $85,633 |
District: | ATLANTA | Let Date: | Sep 2016 |
Highway: | FM 3001 | Let Status: | Actual |
Project ID: | STP 2017(071)HESG | CSJ: | 3041-02-017 |
Description: | PROFILE EDGELINE MARKINGS | Handling Code: | |
Limits From: | FM 726 | Fund Cat: | 8 |
Limits To: | HARRISON C/L | ESTIMATE: | $101,574 |
Length: | 6.6 | Actual | $87,614 |
Back... | Totals for 0010-06-041 | ||
---|---|---|---|
Length: | 120.8 | ||
Estimate: | $2,357,159 | ||
Actual: | $1,861,333 | ||
CCSJ: 0010-07-050 |
|||
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | STP 2017(703)HESG | CSJ: | 0010-07-050 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | MORRIS C/L | Fund Cat: | 8 |
Limits To: | 0.9 MI. E. OF FM 1402 | ESTIMATE: | $146,350 |
Length: | 7.9 | Actual | $118,615 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | STP 2017(704)HESG | CSJ: | 0046-06-075 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | FM 1398 | Fund Cat: | 8 |
Limits To: | FM 2148 | ESTIMATE: | $119,676 |
Length: | 5.9 | Actual | $102,942 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2017(705)HESG | CSJ: | 0062-01-041 |
Description: | PROFILE CENTERLINE MARKINGS | Handling Code: | |
Limits From: | US 67 | Fund Cat: | 8 |
Limits To: | CASS C/L | ESTIMATE: | $36,196 |
Length: | 5.5 | Actual | $30,582 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2017(706)HESG | CSJ: | 0062-01-042 |
Description: | PROFILE EDGELINE MARKINGS | Handling Code: | |
Limits From: | US 67 | Fund Cat: | 1 |
Limits To: | CASS C/L | ESTIMATE: | $66,075 |
Length: | 5.5 | Actual | $57,565 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | STP 2017(707)HESG | CSJ: | 0248-03-023 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | FM 3384 | Fund Cat: | 8 |
Limits To: | UPSHUR C/L | ESTIMATE: | $88,618 |
Length: | 5.4 | Actual | $73,859 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | STP 2017(709)HESG | CSJ: | 0248-04-070 |
Description: | PROFILE EDGELINE MARKINGS | Handling Code: | |
Limits From: | CAMP C/L | Fund Cat: | 1 |
Limits To: | FM 2088 | ESTIMATE: | $94,043 |
Length: | 6.5 | Actual | $78,073 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | FM 44 | Let Status: | Actual |
Project ID: | STP 2017(708)HESG | CSJ: | 0330-02-016 |
Description: | PROFILE EDGELINE MARKINGS | Handling Code: | |
Limits From: | RED RIVER C/L | Fund Cat: | 1 |
Limits To: | FM 3165 | ESTIMATE: | $44,905 |
Length: | 4.6 | Actual | $37,506 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2017(710)HESG | CSJ: | 0569-01-053 |
Description: | PROFILE EDGELINE MARKINGS | Handling Code: | |
Limits From: | SH 77 | Fund Cat: | 1 |
Limits To: | FM 248 | ESTIMATE: | $71,248 |
Length: | 6.3 | Actual | $60,721 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | FM 144 | Let Status: | Actual |
Project ID: | STP 2017(711)HESG | CSJ: | 0750-02-017 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | SH 11 | Fund Cat: | 8 |
Limits To: | US 259 | ESTIMATE: | $122,293 |
Length: | 8.6 | Actual | $103,250 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | FM 2625 | Let Status: | Actual |
Project ID: | STP 2017(712)HESG | CSJ: | 0843-07-020 |
Description: | PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS | Handling Code: | |
Limits From: | FM 3251 | Fund Cat: | 8 |
Limits To: | US 59 | ESTIMATE: | $127,669 |
Length: | 7.1 | Actual | $111,832 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | FM 2796 | Let Status: | Actual |
Project ID: | STP 2017(713)HESG | CSJ: | 0946-04-004 |
Description: | PROFILE CENTERLINE MARKINGS | Handling Code: | |
Limits From: | FM 593 | Fund Cat: | 1 |
Limits To: | FM 557 | ESTIMATE: | $59,155 |
Length: | 5.7 | Actual | $49,219 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | FM 1649 | Let Status: | Actual |
Project ID: | STP 2017(714)HESG | CSJ: | 1382-04-014 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | FM 555 | Fund Cat: | 8 |
Limits To: | 0.3 MI. W. OF US 259 | ESTIMATE: | $167,974 |
Length: | 10.7 | Actual | $145,640 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | FM 1845 | Let Status: | Actual |
Project ID: | STP 2017(715)HESG | CSJ: | 1763-01-011 |
Description: | PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS | Handling Code: | |
Limits From: | FM 726 | Fund Cat: | 8 |
Limits To: | GREGG C/L | ESTIMATE: | $37,767 |
Length: | 3.5 | Actual | $32,280 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | FM 2149 | Let Status: | Actual |
Project ID: | STP 2017(716)HESG | CSJ: | 1987-01-035 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | END OF MAINTENANCE | Fund Cat: | 8 |
Limits To: | US 67 | ESTIMATE: | $159,428 |
Length: | 11.8 | Actual | $135,197 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | FM 2152 | Let Status: | Actual |
Project ID: | STP 2017(717)HESG | CSJ: | 1988-01-024 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | END OF MAINTENANCE | Fund Cat: | 8 |
Limits To: | 0.3 MI. N. OF BU 271 | ESTIMATE: | $121,335 |
Length: | 8.4 | Actual | $102,894 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | FM 3417 | Let Status: | Actual |
Project ID: | STP 2017(718)HESG | CSJ: | 3404-01-014 |
Description: | PROFILE CENTERLINE MARKINGS | Handling Code: | |
Limits From: | FM 127 | Fund Cat: | 8 |
Limits To: | US 271 | ESTIMATE: | $25,876 |
Length: | 4.3 | Actual | $22,814 |
District: | ATLANTA | Let Date: | Feb 2017 |
Highway: | FM 3417 | Let Status: | Actual |
Project ID: | STP 2017(719)HESG | CSJ: | 3404-01-015 |
Description: | PROFILE EDGELINE MARKINGS | Handling Code: | |
Limits From: | FM 127 | Fund Cat: | 8 |
Limits To: | US 271 | ESTIMATE: | $38,683 |
Length: | 4.3 | Actual | $32,598 |
Award Status Bid Tabulations Bid List Back... | Totals for 0010-07-050 | ||
Length: | 112 | ||
Estimate: | $1,527,289 | ||
Actual: | $1,295,587 | ||
CCSJ: 0221-05-064 |
|||
District: | ATLANTA | Let Date: | Jun 2017 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | BR 1702(392) | CSJ: | 0221-05-064 |
Description: | REPLACE BRIDGES AND APPROACHES | Handling Code: | |
Limits From: | AT RIPLEY CREEK | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $5,872,715 |
Length: | 0.7 | Actual | $4,865,215 |
District: | ATLANTA | Let Date: | Jun 2017 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | BR 1702(392) | CSJ: | 0221-05-092 |
Description: | REPLACE BRIDGE & APPROACHES | Handling Code: | |
Limits From: | AT RIPLEY CREEK RELIEF | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $4,994,022 |
Length: | 0.4 | Actual | $4,045,835 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0221-05-064 | ||
Length: | 1.1 | ||
Estimate: | $10,866,737 | ||
Actual: | $8,911,051 | ||
CCSJ: 0248-01-072 |
|||
District: | ATLANTA | Let Date: | Jun 2017 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | STP 1702(393)HES | CSJ: | 0248-01-072 |
Description: | IMPROVE TRAFFIC SIGNAL, INSTALL ADVANCE WARNING SIGNS, | Handling Code: | |
Limits From: | AT ARIZONA STREET INTERSECTION | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $164,285 |
Length: | 0.0 | Actual | $155,733 |
District: | ATLANTA | Let Date: | Jun 2017 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | STP 1702(394)HES | CSJ: | 0248-01-073 |
Description: | IMPROVE TRAFFIC SIGNAL, INSTALL ADVANCE WARNING SIGNS, | Handling Code: | |
Limits From: | AT MADISON STREET INTERSECTION | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $134,345 |
Length: | 0.0 | Actual | $133,463 |
District: | ATLANTA | Let Date: | Jun 2017 |
Highway: | BU 271E | Let Status: | Actual |
Project ID: | STP 1702(395)HES | CSJ: | 0248-01-075 |
Description: | IMPROVE TRAFFIC SIGNAL, INSTALL ADVANCE WARNING SIGNS, | Handling Code: | |
Limits From: | AT PECAN STREET INTERSECTION | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $114,477 |
Length: | 0.0 | Actual | $128,991 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0248-01-072 | ||
Length: | 0 | ||
Estimate: | $413,107 | ||
Actual: | $418,187 | ||
CCSJ: 0248-01-077 |
|||
District: | ATLANTA | Let Date: | May 2017 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | NH 1702(147) | CSJ: | 0248-01-077 |
Description: | CONSTRUCT GRADE SEPARATION AND APPROACHES ON 4-LANE HIGHWAY | Handling Code: | |
Limits From: | 0.7 MI. N. OF FM 3417 | Fund Cat: | 1 |
Limits To: | 0.3 MI. S. OF FM 3417 | ESTIMATE: | $14,887,891 |
Length: | 1.1 | Actual | $12,222,496 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0248-01-077 | ||
Length: | 1.1 | ||
Estimate: | $14,887,891 | ||
Actual: | $12,222,496 | ||
CCSJ: 0610-03-090 |
|||
District: | ATLANTA | Let Date: | Nov 2016 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | STP 2017(239)HES | CSJ: | 0610-03-090 |
Description: | SAFETY LIGHTING | Handling Code: | |
Limits From: | SS 185 | Fund Cat: | 8 |
Limits To: | FM 1001 | ESTIMATE: | $1,149,571 |
Length: | 11.7 | Actual | $1,189,798 |
District: | ATLANTA | Let Date: | Nov 2016 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | STP 2017(240)HES | CSJ: | 0610-05-053 |
Description: | SAFETY LIGHTING | Handling Code: | |
Limits From: | MORRIS C/L | Fund Cat: | 8 |
Limits To: | 0.384 MI. E. OF SH 98 | ESTIMATE: | $691,524 |
Length: | 17.1 | Actual | $651,961 |
Back... | Totals for 0610-03-090 | ||
Length: | 28.8 | ||
Estimate: | $1,841,095 | ||
Actual: | $1,841,759 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |