Letting Schedule for June, 2017 County (FY 2017)

Last Update: Monday, October 16, 2017
June, 2017 (FY 2017)(see Links)
SEP 2016 | OCT 2016 | NOV 2016 | DEC 2016 | JAN 2017 | FEB 2017 | MAR 2017 | APR 2017 | MAY 2017 | JUN 2017 | JUL 2017 | AUG 2017 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
Description
0200-02-031Angelina/
Lufkin
US 69Actual$10,575,1671WIDEN FROM 2 LANES TO 4 LANE DIVIDED RURAL
1835-02-054Bell/
Waco
FM 1741Actual$1,054,6951MILL AND INLAY
2452-01-064Bexar/
San Antonio
SL 1604Actual$7,934,7671INTERSECTION OPERATIONAL IMPROVEMENTS
0010-11-069Bowie/
Atlanta
US 67Actual$1,620,1266BRIDGE PREVENTATIVE MAINTENANCE
0610-06-080Bowie/
Atlanta
IH 30Actual$681,3048INSTALL SAFETY LIGHTING
0046-06-079Bowie/
Atlanta
US 82Actual$1,862,8771RESURFACE EXISTING 4-LANE ROADWAY
0598-02-092Brazoria/
Houston
SH 288Actual$167,882,8473CONSTRUCT 4 TOLL LANES
0598-02-047Brazoria/
Houston
SH 288Actual$2,124,87211CONSTRUCT NB EXIT AND ENTRANCE RAMPS AND TIE-IN ROAD AT
0282-01-016Clay/
Wichita Falls
SH 79Actual$6,090,0006REPLACE BRIDGE
0816-05-019Collin/
Dallas
FM 2862Actual$1,614,8256REPLACE BRIDGE AND APPROACHES
1973-01-014Collin/
Dallas
FM 1461Actual$2,718,0468PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0918-24-215Collin/
Dallas
CSActual$550,0003PRINCETON SAFE ROUTES TO SCHOOL - CONSTRUCT SIDEWALKS
0027-03-071Colorado/
Yoakum
US 90AActual$4,348,74811CONSTRUCT SUPER 2 LANES
0196-07-031Dallas/
Dallas
SS 366Actual$713,0641CONCRETE FULL DEPTH REPAIR AND PAVEMENT MARKINGS ON
0353-06-057Dallas/
Dallas
SH 114Actual$44,768,1561CONSTRUCT 0 TO 4 LANE SIGNATURE BRIDGE AND RAMP
0095-13-037Dallas/
Dallas
IH 20Actual$4,734,2075INSTALLATION OF WIRELESS ITS
0196-03-268Dallas/
Dallas
IH 35EActual$80,160,5491CONSTRUCT 0 TO 3/4 COLLECTOR DISTRIBUTOR, RCNST 1/3 LN SB FR
2374-04-049Dallas/
Dallas
IH 20Actual$56,411,9833CONSTRUCT 0 TO 6 LANE FRONTAGE ROADS, RAMP MODIFICATIONS AND
0009-03-045Dallas/
Dallas
SH 66Actual$1,772,19110LANDSCAPE TREATMENT OF RIGHT OF WAY MEDIANS
0136-04-035Delta/
Paris
SH 19Actual$2,195,0626REPLACE BRIDGE AND APPROACHES
0081-13-057Denton/
Dallas
IH 35WActual$18,895,3561CONSTRUCT 2 LANE NORTHBOUND FRONTAGE ROADS WITH RAMP
0918-46-274Denton/
Dallas
CSActual$1,741,2256REPLACE BRIDGE AND APPROACHES
0918-46-280Denton/
Dallas
CSActual$1,243,6963IMPROVE TRAFFIC SIGNALS
0037-05-051Dimmit/
Laredo
US 83Actual$428,8858INSTALL INTERSECTION FLASHING BEACON
0027-06-046Fort Bend/
Houston
US 90AActual$24,637,3302MREPLACE RAILROAD UNDERPASS
0010-04-021Franklin/
Paris
US 67Actual$711,5061PROFILE EDGELINE AND CENTERLINE MARKINGS
1414-01-019Galveston/
Houston
FM 528Actual$240,7198IMPROVE TRAFFIC SIGNALS
0392-03-047Gregg/
Tyler
US 259Actual$459,8921CONSTRUCT RIGHT TURN LANE ON NBL
0910-07-069Gregg/
Tyler
VAActual$1,413,1901INSTALL FLASHING YELLOW LEFT TURN ARROWS ON TRAFFIC SIGNALS
0917-17-065Grimes/
Bryan
CRActual$903,9266REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF
0339-04-035Hardin/
Beaumont
SH 105Actual$2,943,64711MILL AND OVERLAY EXISTING ROADWAY
0065-06-063Hardin/
Beaumont
US 69Actual$9,395,3201CONSTRUCT FRONTAGE ROADS OVER PINE ISLAND BAYOU
0508-01-346Harris/
Houston
IH 10Actual$17,536,5531SPALL REPAIR, FULL DEPTH REPAIR, AR, 1" CAM, PFC ACP
0912-72-409Harris/
Houston
CSActual$245,7918FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 288 014F)
0912-72-412Harris/
Houston
CSActual$79,5078FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755 618Y)
0912-72-410Harris/
Houston
CSActual$402,7988FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 512N)
0912-72-336Harris/
Houston
CRActual$12,106,0157CONSTRUCT RAILROAD GRADE SEPARATION WITH MEDIAN & SIDEWALKS
0912-72-411Harris/
Houston
CSActual$434,9758FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 513V)
0912-71-896Harris/
Houston
CSActual$7,052,6143CONSTRUCT 4 LANE DIVIDED SECTION
0912-72-313Harris/
Houston
CSActual$5,846,6973RECONSTRUCT ROADWAY WITH ANGLED PARKING AND PEDESTRIAN IMPRO
1919-02-037Harrison/
Atlanta
FM 1997Actual$864,9701UPGRADE SIDEWALKS AND RETAINING WALLS AT ETBU
0157-04-051Haskell/
Abilene
US 277Actual$725,9591UPGRADE SAFETY LIGHTING
7107-08-004Irion/
San Angelo
RL SOActual$9,517,331RLINFRASTRUCTURE REHAB TO REPLACE RAIL, REPLACE TIES, BALLAST,
0916-37-030Jim Wells/
Corpus Christi
CRActual$299,5636REPLACE BRIDGE AND APPROACHES
0918-11-085Kaufman/
Dallas
CSActual$400,0003PEDESTRIAN FACILITIES AND AMENITIES; CONSTRUCT SIDEWALK
0751-03-038Kaufman/
Dallas
FM 148Actual$4,345,8021RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS
0095-14-028Kaufman/
Dallas
IH 20Actual$1,304,1451CONCRETE PAVEMENT REPAIR AND SLOT STITCHING
1042-01-032Kendall/
San Antonio
RM 474Actual$5,512,1481WIDEN EXISTING ROADWAY TO ADD SHOULDERS
0913-29-031Lavaca/
Yoakum
CRActual$616,1816REPLACE BRIDGE AND APPROACHES
0593-01-114Liberty/
Beaumont
SH 321Actual$1,094,8881OVERLAY EXISTING ROADWAY
0348-11-015Live Oak/
Corpus Christi
FM 99Actual$2,760,3001REHAB AND WIDEN
0150-02-038Llano/
Austin
SH 29Actual$574,2828INSTALL ADVANCE CURVE WARNING SIGNALS AND SIGNS, INSTALL LED
0905-00-080Lubbock/
Lubbock
VAActual$2,533,75910CONSTRUCT CURB RAMPS AT VARIOUS LOCATION IN
0328-07-014Mcmullen/
San Antonio
SH 97Actual$4,364,2811REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES AND
0848-01-041Medina/
San Antonio
FM 462Actual$3,788,2731REHABILITATE & WIDEN NARROW ROADWAY TO ADD SHOULDERS
0463-03-049Midland/
Odessa
SH 158Actual$4,979,6531PAVEMENT OVERLAY
0917-12-080Milam/
Bryan
CRActual$554,7076REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF
0720-02-091Montgomery/
Houston
FM 149Actual$413,0278INSTALL LED FLASHING CHEVRONS ON CURVE
0920-06-033Newton/
Beaumont
CRActual$579,5226REPLACE BRIDGE AND APPROACHES
0908-20-025Nolan/
Abilene
CRActual$368,6488SIGNALS,LIGHTS,GATES
0916-35-164Nueces/
Corpus Christi
PWActual$1,528,91210RESURFACING OF ROADWAYS,PARKING LOT,AND LEVEE ROADS
0074-06-228Nueces/
Corpus Christi
IH 37Actual$748,8961IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS (FRTG LANES)
0007-08-028Palo Pinto/
Ft Worth
SH 16Actual$302,1458MILLED EDGELINE & CENTERLINE RUMBLE STRIPS
0314-07-052Parker/
Ft Worth
IH 20Actual$32,478,4391RECONSTRUCT 2 LN BRIDGE TO 1 LN U-TURN BRIDGE, CONST 0 TO 4
0302-01-020Parmer/
Lubbock
SH 86Actual$920,7626BRIDGE MAINTENANCE
0090-05-099Potter/
Amarillo
IH 40Actual$1,888,9096REPLACE WEST BOUND BRIDGE
0493-01-013Reeves/
Odessa
RM 652Actual$7,108,0091ROADWAY RESTORATION
0059-04-046Shelby/
Lufkin
SH 7Actual$2,253,0398TEXTURIZE SHOULDERS (PROFILE EDGELINE MARKINGS; PROFILE
0034-01-129Taylor/
Abilene
US 83Actual$2,046,6151REMOVE THE EXISTING PAVEMENT AND REPLACE WITH CONCERETE TO
0006-06-103Taylor/
Abilene
IH 20Actual$2,636,3566REHAB EXISTING BRIDGE
0033-06-107Taylor/
Abilene
US 83Actual$8,908,6391PLANING, UNDERSEAL, SMA SURFACES TREATMENT, BRIDGE RAIL
0221-05-064Titus/
Atlanta
US 271Actual$10,866,7376REPLACE BRIDGES AND APPROACHES
0248-01-072Titus/
Atlanta
SH 49Actual$413,1078IMPROVE TRAFFIC SIGNAL, INSTALL ADVANCE WARNING SIGNS,
0683-02-068Travis/
Austin
RM 620Actual$177,3953INSTALL TRAFFIC SIGNAL
0113-13-165Travis/
Austin
SH 71Actual$820,94210LANDSCAPING AND IRRIGATION
0015-13-401Travis/
Austin
IH 35Actual$149,0048IMPROVE TRAFFIC SIGNAL
0015-13-377Travis/
Austin
IH 35Actual$6,968,5522MRESURFACE ROADWAY
0248-04-068Upshur/
Atlanta
US 271Actual$374,1148INSTALL PAVEMENT MARKINGS & INSTALL PEDESTRIAN CROSSWALK
0022-10-064Val Verde/
Laredo
US 90Actual$530,0011IMPROVE TRAFFIC SIGNALS
0495-02-063Van Zandt/
Tyler
IH 20Actual$2,092,6088IMPROVE GUARDRAIL TO DESIGN STANDARDS
0910-12-066Van Zandt/
Tyler
CRActual$1,522,4126REPLACE RAILROAD OVERPASS & APPROACHES
0522-02-037Van Zandt/
Tyler
SH 243Actual$6,560,7171WIDEN FROM 2 LNS TO 4 LNS W/FLUSH MEDIAN
0917-27-044Walker/
Bryan
CRActual$517,2356REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING,
0271-04-071Waller/
Houston
IH 10Actual$143,849,7471CONSTRUCT 1 ADDITIONAL MAIN LANE IN EACH DIRECTION
0156-07-109Wichita/
Wichita Falls
IH 44Actual$1,062,4968INTALL MEDIAN BARRIER
0903-03-083Wichita/
Wichita Falls
CSActual$1,085,4646REPLACE BRIDGE AND APPROACHES
0903-03-111Wichita/
Wichita Falls
VAActual$559,9923CONSTRUCT SIDEWALKS
1202-01-018Williamson/
Austin
FM 972Actual$3,582,1251REHABILITATE PAVEMENT, ADD SHOULDERS & SAFETY TREAT


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract