Letting Schedule for January, 2017 County (FY 2017)
January, 2017 (FY 2017) | (see Links) |
SEP 2016 | OCT 2016 | NOV 2016 | DEC 2016 | JAN 2017 | FEB 2017 | MAR 2017 | APR 2017 | MAY 2017 | JUN 2017 | JUL 2017 | AUG 2017 | | ||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description |
---|---|---|---|---|---|---|
0122-04-038 | Anderson/ Tyler | US 287 | Actual | $11,321,435 | 1 | SEAL COAT AND PAVEMENT MARKINGS |
0916-38-009 | Aransas/ Corpus Christi | PW | Actual | $870,452 | 10 | RAISE ROAD PROFILE GRADE & INSTALL SEAWALL AT STINKY BEACH |
0527-03-024 | Austin/ Yoakum | FM 1458 | Actual | $712,956 | 8 | SAFETY TREAT FIXED OBJECTS, IMPROVE GUARDRAIL TO DESIGN STAN |
0265-03-048 | Bastrop/ Austin | SH 71 | Actual | $317,375 | 8 | LENGTHEN LEFT TURN LANE |
0015-05-048 | Bell/ Waco | SH 317 | Actual | $405,292 | 3 | REPAIR AND INSTALL SIDEWALKS ON EASTSIDE OF SOUTH MAIN ST/ |
0909-36-151 | Bell/ Waco | CS | Actual | $312,532 | 3 | CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF |
2230-01-016 | Bexar/ San Antonio | FM 1560 | Actual | $1,539,038 | 1 | REPLACE EXISTING CULVERT WITH BRIDGE |
0024-08-128 | Bexar/ San Antonio | US 90 | Actual | $2,319,953 | 8 | CONSTRUCT PEDESTRIAN BRIDGE OVER US 90 |
2879-01-010 | Bowie/ Atlanta | FM 1297 | Actual | $2,517,450 | 1 | WIDEN EXISTING ROADWAY TO PROVIDE CONTINUOUS LEFT TURN LANE |
0598-02-100 | Brazoria/ Houston | SH 288 | Actual | $6,431,707 | 1 | MILL, SEAL AND PERMEABLE FRICTION COURSE OVERLAY |
2399-01-076 | Brazos/ Bryan | FM 2818 | Actual | $763,436 | 3 | SAFETY WORK CONSISTING OF IMPROVING TRAFFIC SIGNALS |
0021-01-053 | Brewster/ El Paso | US 67 | Actual | $4,297,972 | 1 | ROADWAY REHABILITATION |
0054-06-097 | Brown/ Brownwood | US 67 | Actual | $4,267,408 | 1 | REHABILITATE EXISTING ROADWAY |
2206-02-006 | Burnet/ Austin | FM 1478 | Actual | $346,555 | 8 | SAFETY TREAT FIXED OBJECTS |
0913-19-028 | Calhoun/ Yoakum | CR | Actual | $475,043 | 6 | REPLACE BRIDGE AND APPROACHES |
0039-07-248 | Cameron/ Pharr | IH 69E | Actual | $299,101 | 3 | LANDSCAPE IMPROVEMENTS |
0331-04-067 | Cameron/ Pharr | PR 100 | Actual | $3,242,209 | 3 | CONSTRUCT CONCRETE SIDEWALKS, RAMPS, CURBS, SIGNAGE & |
0389-02-051 | Chambers/ Beaumont | SH 146 | Actual | $236,825 | 8 | IMPROVE TRAFFIC SIGNALS |
0634-01-012 | Cherokee/ Tyler | FM 22 | Actual | $1,045,386 | 8 | SAFETY TREAT FIXED OBJECTS |
0925-00-065 | Childress/ Childress | VA | Actual | $986,697 | 1 | DISTRICT WIDE STRIPING |
0078-03-055 | Coleman/ Brownwood | US 67 | Actual | $2,522,759 | 8 | IMPROVE GUARDRAIL, SAFETY TREAT FIXED OBJECTS, ADD PASSING L |
0211-10-042 | Colorado/ Yoakum | FM 155 | Actual | $815,846 | 8 | INCREASE SUPERELEVATION |
0070-04-035 | Concho/ San Angelo | US 87 | Actual | $8,386,413 | 1 | SEAL COAT |
0909-39-128 | Coryell/ Waco | VA | Actual | $741,150 | 10 | CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN CORYELL COUNTY |
0353-04-095 | Dallas/ Dallas | SH 114 | Actual | $4,068,292 | 3 | CONSTRUCT WB 0 TO 2 LN FRONTAGE ROAD & RAMP MODIFICATIONS |
0913-17-040 | Dewitt/ Yoakum | CR | Actual | $546,517 | 6 | REPLACE BRIDGE AND APPROACHES |
0143-08-091 | Dewitt/ Yoakum | US 87 | Actual | $12,111,710 | 1 | CONSTRUCTING AUXILIARY LANES |
0922-23-009 | Duval/ Laredo | VA | Actual | $1,377,137 | 3 | SAN DIEGO ISD SAFE ROUTES TO SCHOOL SIDEWALK IMPROVEMENTS |
0172-08-053 | Ellis/ Dallas | US 287 | Actual | $71,594,336 | 7 | WIDEN 2-LANE UNDIVIDED HIGHWAY TO 4-LANE URBAN FREEWAY |
0550-02-038 | Erath/ Ft Worth | FM 8 | Actual | $7,663,047 | 1 | SEAL COAT MAIN LANES AND SHOULDERS |
0334-08-033 | Fayette/ Yoakum | FM 154 | Actual | $498,910 | 6 | REPLACE BRIDGE AND APPROACHES |
0266-01-075 | Fayette/ Yoakum | SH 71 | Actual | $831,225 | 8 | SAFETY LIGHTING AT INTERSECTION |
0271-05-043 | Fort Bend/ Houston | IH 10 | Actual | $936,142 | 11 | CONSTRUCT INTERSECTION IMPROVEMENTS |
0027-07-032 | Fort Bend/ Houston | US 90A | Actual | $20,263,944 | 3 | REPLACE RAILROAD UNDERPASS |
3312-02-014 | Galveston/ Houston | FM 270 | Actual | $1,898,044 | 3 | REALIGN ROADWAY |
0976-04-020 | Galveston/ Houston | FM 2094 | Actual | $242,698 | 8 | IMPROVE TRAFFIC SIGNALS AT INTERSECTION |
0290-03-029 | Gillespie/ Austin | SH 16 | Actual | $2,866,545 | 1 | LEVEL-UP AND SEAL COAT |
0728-04-011 | Grayson/ Paris | FM 120 | Actual | $200,000 | 3 | MEDIAN IMPROVEMENTS |
1562-03-018 | Grimes/ Bryan | FM 1696 | Actual | $6,472,919 | 1 | REHABILITATE EXISTING ROADWAY CONSISTING OF GRADING, |
0912-72-361 | Harris/ Houston | CS | Actual | $3,855,000 | 3 | RECONSTRUCT TRANSIT CENTER TO ACCOMODATE LARGER BUSES AND |
0500-03-605 | Harris/ Houston | IH 45 | Actual | $31,862,915 | 1 | CONSTRUCT ENTRANCE AND EXIT RAMPS, REMOVE AND REPLACE |
0050-06-088 | Harris/ Houston | US 290 | Actual | $34,169,000 | 3 | CONSTRUCT REVERSIBLE L-RAMP PROVIDING ACCESS TO THE US 290 |
0843-06-019 | Harrison/ Atlanta | FM 450 | Actual | $445,191 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
1539-03-001 | Hays/ Austin | FM 1626 | Actual | $1,424,174 | 1 | REPAIR AND OVERLAY |
0921-02-140 | Hidalgo/ Pharr | CS | Actual | $6,694,703 | 3 | RECONSTRUCTION AND WIDENING OF OWASSA ROAD |
0385-04-045 | Hood/ Ft Worth | SH 144 | Actual | $2,920,366 | 1 | REPLACE EXISTING DRAINAGE STRUCTURE |
0080-04-096 | Hood/ Ft Worth | US 377 | Actual | $3,528,073 | 1 | THIN OVERLAY MIXTURE (TOM) |
0902-51-028 | Hood/ Ft Worth | VA | Actual | $1,607,416 | 3 | SIDEWALK/RAMP IMPROV, HMAC OVERLAY, LIGHTING, CONST OF ADA |
0118-01-019 | Houston/ Lufkin | SH 21 | Actual | $3,358,710 | 8 | SAFETY TREAT FIXED OBJECTS |
0306-03-126 | Jefferson/ Beaumont | SH 73 | Actual | $8,645,162 | 1 | MILL AND OVERLAY EXISTING ROADWAY |
1181-04-044 | Johnson/ Ft Worth | FM 917 | Actual | $560,711 | 1 | 3/4 INCH THIN OVERLAY MIXTURE & PAVEMENT MARKINGS |
0270-03-074 | Karnes/ Corpus Christi | SH 72 | Actual | $5,080,491 | 1 | BASE REPAIR, SURFACE AND RESTRIPE ROADWAY |
0915-11-031 | Kendall/ San Antonio | CR | Actual | $1,602,520 | 6 | REPLACE BRIDGE AND APPROACHES |
0922-20-019 | La Salle/ Laredo | CS | Actual | $269,923 | 3 | FOR THE CONSTRUCTION OF SIDEWALK IMPROVEMENTS |
0073-07-063 | Live Oak/ Corpus Christi | IH 37 | Actual | $1,000,060 | 8 | INSTALL MEDIAN BARRIER |
0447-01-063 | Live Oak/ Corpus Christi | US 59 | Actual | $11,111,580 | 1 | OVERLAY ROADWAY_(NB & SB) |
0068-01-069 | Lubbock/ Lubbock | US 87 | Actual | $9,853,819 | 1 | REHABILITATION OF EXISTING ROADWAY |
0905-00-090 | Lubbock/ Lubbock | VA | Actual | $540,697 | 1 | MISCELLANEOUS CONSTRUCTION |
0130-05-083 | Lubbock/ Lubbock | US 62 | Actual | $3,601,148 | 11 | MISCELLANEOUS CONSTRUCTION |
0053-18-042 | Lubbock/ Lubbock | US 84 | Actual | $550,122 | 8 | IMPROVE TRAFFIC SIGNALS |
0905-00-091 | Lubbock/ Lubbock | VA | Actual | $506,080 | 1 | REPAIR SETS |
2506-01-036 | Mclennan/ Waco | FM 1695 | Actual | $810,287 | 1 | MILL/SEAL/INLAY |
0909-22-174 | Mclennan/ Waco | CR | Actual | $484,594 | 6 | REPLACE BRIDGE AND APPROACHES |
0909-22-167 | Mclennan/ Waco | CR | Actual | $819,669 | 6 | REPLACE BRIDGE AND APPROACHES |
0015-21-012 | Mclennan/ Waco | FM 3476 | Actual | $846,210 | 1 | MILL, SEAL AND INLAY |
0380-09-081 | Midland/ Odessa | SH 349 | Actual | $5,998,225 | 1 | ROADWAY REHABILITATION |
0289-03-026 | Mills/ Brownwood | SH 16 | Actual | $1,860,776 | 8 | IMPROVE GUARDRAIL TO SAFETY, SAFETY TREAT OBJECTS, INSTALL P |
0005-12-013 | Mitchell/ Abilene | BI 20-J | Actual | $3,664,913 | 1 | ROADWAY REHABILITATION / ARMORING |
0675-08-110 | Montgomery/ Houston | IH 45 | Actual | $74,919 | 4 | UPGRADE CONCRETE MEDIAN BARRIER CONSISTING OF BARRIER |
1407-03-016 | Nacogdoches/ Lufkin | FM 1275 | Actual | $285,642 | 8 | IMPROVE TRAFFIC SIGNAL |
0373-02-093 | Nueces/ Corpus Christi | SH 44 | Actual | $5,534,497 | 1 | OVERLAY ROADWAY |
0063-03-060 | Panola/ Atlanta | US 59 | Actual | $494,205 | 8 | IMPROVE TRAFFIC SIGNAL & SAFETY LIGHTING |
0176-04-081 | Polk/ Lufkin | US 59 | Actual | $824,653 | 6 | REPLACE BRIDGE AND APPROACH RAILING |
1681-01-012 | San Jacinto/ Lufkin | FM 1127 | Actual | $1,427,956 | 8 | SAFETY TREAT FIXED OBJECTS |
0123-07-019 | Shelby/ Lufkin | US 84 | Actual | $1,355,786 | 8 | SAFETY TREAT FIXED OBJECTS |
0910-00-100 | Smith/ Tyler | VA | Actual | $313,113 | 1 | DISTRICT WIDE THERMOPLASTIC PAVEMENT MARKINGS PROGRAM |
0905-17-014 | Swisher/ Lubbock | VA | Actual | $305,777 | 1 | MISCELLANEOUS CONSTRUCTION |
0902-00-135 | Tarrant/ Ft Worth | VA | Actual | $1,620,997 | 10 | CONSTRUCT ADA CURB RAMPS AT VARIOUS LOCATIONS IN TARRANT COU |
0094-02-131 | Tarrant/ Ft Worth | SH 10 | Actual | $699,615 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW |
0902-00-148 | Tarrant/ Ft Worth | VA | Actual | $1,512,350 | 1 | NON-SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION |
0008-13-233 | Tarrant/ Ft Worth | IH 820 | Actual | $1,496,570 | 1 | SHOULDER WIDENING & RESTRIPING OF SB IH820 TO ADD EXIT LANE |
0907-00-166 | Tom Green/ San Angelo | VA | Actual | $649,017 | 1 | PAVEMENT MARKINGS |
0114-01-060 | Travis/ Austin | SS 69 | Actual | $941,064 | 8 | IMPROVE TRAFFIC SIGNALS |
0113-08-083 | Travis/ Austin | US 290 | Actual | $435,425 | 1 | REPAIR AND OVERLAY |
0113-13-155 | Travis/ Austin | SL 360 | Actual | $1,622,976 | 1 | RESURFACE ROADWAY |
1186-01-090 | Travis/ Austin | FM 969 | Actual | $9,941,409 | 3 | REHAB ROADWAY AND ADD TWLTL & SHOULDERS |
0108-12-017 | Van Zandt/ Tyler | SH 19 | Actual | $1,149,757 | 1 | INSTALL CENTERLINE PROFILE PAVEMENT MARKINGS |
0675-07-096 | Walker/ Bryan | IH 45 | Actual | $131,101,181 | 4 | WIDEN FREEWAY CONSISTING OF GRADING, STRUCTURES, FLEXIBLE |
0114-11-076 | Waller/ Houston | US 290 | Actual | $165,791 | 8 | CLOSE THE CROSSOVER AT OLD HOWTH ROAD AND EXTEND THE |
0922-00-062 | Webb/ Laredo | VA | Actual | $1,723,999 | 10 | CONSTRUCT CURB RAMPS AT VARIOUS LOCATION IN EAGLE PASS ALONG |
0913-09-060 | Wharton/ Yoakum | CR | Actual | $993,499 | 6 | REPLACE BRIDGE AND APPROACHES |
0913-09-081 | Wharton/ Yoakum | CS | Actual | $355,972 | 3 | CONSTRUCT SIDEWALKS, CURBS, DRIVEWAYS AND ACCESSIBILITY RAMP |
0015-09-188 | Williamson/ Austin | IH 35 | Actual | $4,816,056 | 2M | MILL, SEAL AND INLAY |
0914-05-184 | Williamson/ Austin | CS | Actual | $892,509 | 3 | CONSTRUCT BAGDAD ROAD SIDEWALKS & SHARED USE PATH |
0328-02-043 | Wilson/ San Antonio | SH 97 | Actual | $21,999,845 | 1 | REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES AND |
0429-01-023 | Wood/ Tyler | SH 182 | Actual | $3,365,903 | 8 | SAFETY TREAT FIXED OBJECTS |
|