Detail Letting Schedule for El Paso County (FY 2016)
El Paso County (FY 2016) |
CCSJ: 0001-05-017 | |||
District: | El Paso | Let Date: | JUN 2016 |
Highway: | FM 259 | Let Status: | Actual |
Project ID: | STP 1602(594)FRS3 | CSJ: | 0001-05-017 |
Description: | INSTALL LIGHTS AND GATES WITH ADVANCED PREEMPTION DETECTION | Handling Code: |
XX |
Limits From: | 0.046 MI W OF SH 20 | Fund Cat: | 8 |
Limits To: | SH 20 | Estimate: | $190,776 |
Length: | 0.0 Miles | Actual: | $190,776 |
Back... |
Totals for 0001-05-017 | ||
---|---|---|---|
Length: | 0.0 Miles | ||
Estimate: | $190,776 | ||
Actual: | $190,776 | ||
CCSJ: 0001-07-011 | |||
District: | El Paso | Let Date: | JUN 2016 |
Highway: | FM 1905 | Let Status: | Actual |
Project ID: | STP 1602(594)FRS3 | CSJ: | 0001-07-011 |
Description: | INSTALL LIGHTS AND GATES WITH ADVANCED PREEMPTION DETECTION | Handling Code: |
XX |
Limits From: | 0.025 MI W OF SH 20 | Fund Cat: | 8 |
Limits To: | SH 20 INTERSECTION | Estimate: | $216,262 |
Length: | 0.0 Miles | Actual: | $216,262 |
Back... |
Totals for 0001-07-011 | ||
Length: | 0.0 Miles | ||
Estimate: | $216,262 | ||
Actual: | $216,262 | ||
CCSJ: 0924-06-154 | |||
District: | El Paso | Let Date: | JAN 2016 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2008(321) | CSJ: | 0924-06-154 |
Description: | OFF - SYSTEM BRIDGE REPLACEMENT | Handling Code: |
|
Limits From: | SH 20 (ALAMEDA AVENUE) | Fund Cat: | 6 |
Limits To: | STILES/FRANKLIN DRIVE | Estimate: | $7,680,201 |
Length: | 0.3 Miles | Actual: | $7,490,552 |
District: | El Paso | Let Date: | JAN 2016 |
Highway: | CS | Let Status: | Actual |
Project ID: | ROW 924-6-521 | CSJ: | 0924-06-521 |
Description: | UTILITY ADJUSTMENT | Handling Code: |
|
Limits From: | SH 20 (ALAMEDA AVENUE) | Fund Cat: | ROW |
Limits To: | STILES/FRANKLIN DRIVE | Estimate: | $346,562 |
Length: | 0.3 Miles | Actual: | $357,979 |
Back... |
Totals for 0924-06-154 | ||
Length: | 0.6 Miles | ||
Estimate: | $8,026,763 | ||
Actual: | $7,848,531 | ||
CCSJ: 0924-06-457 | |||
District: | El Paso | Let Date: | AUG 2016 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2015(455)MM | CSJ: | 0924-06-457 |
Description: | WIDEN ROADWAY TO 4 LANE | Handling Code: |
|
Limits From: | ALBERTON AVE | Fund Cat: | 3 |
Limits To: | 200 FT S OF LTV RD | Estimate: | $8,139,049 |
Length: | 1.3 Miles | Actual: | $6,591,275 |
Back... |
Totals for 0924-06-457 | ||
Length: | 1.3 Miles | ||
Estimate: | $8,139,049 | ||
Actual: | $6,591,275 | ||
CCSJ: 0924-06-458 | |||
District: | El Paso | Let Date: | MAY 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2014(971) | CSJ: | 0924-06-458 |
Description: | BLUETOOTH WAIT SYSTEMS AT STANTON POE | Handling Code: |
XX |
Limits From: | AT STANTON | Fund Cat: | 3 |
Limits To: | . | Estimate: | $120,000 |
Length: | 1.0 Miles | Actual: | $126,795 |
Back... |
Totals for 0924-06-458 | ||
Length: | 1.0 Miles | ||
Estimate: | $120,000 | ||
Actual: | $126,795 | ||
CCSJ: 0924-06-459 | |||
District: | El Paso | Let Date: | MAY 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2014(969) | CSJ: | 0924-06-459 |
Description: | BLUETOOTH WAIT SYSTEMS AT PASO DEL NORTE POE | Handling Code: |
XX |
Limits From: | AT PDN BRIDGE | Fund Cat: | 3 |
Limits To: | . | Estimate: | $120,000 |
Length: | 1.0 Miles | Actual: | $126,753 |
Back... |
Totals for 0924-06-459 | ||
Length: | 1.0 Miles | ||
Estimate: | $120,000 | ||
Actual: | $126,753 | ||
CCSJ: 0924-06-466 | |||
District: | El Paso | Let Date: | JAN 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2016(629) | CSJ: | 0924-06-466 |
Description: | FORTY FT. BUS PURCHASE | Handling Code: |
TR |
Limits From: | CITYWIDE | Fund Cat: | 5 |
Limits To: | . | Estimate: | $540,000 |
Length: | 1.0 Miles | Actual: | $540,000 |
Back... |
Totals for 0924-06-466 | ||
Length: | 1.0 Miles | ||
Estimate: | $540,000 | ||
Actual: | $540,000 | ||
CCSJ: 0924-06-482 | |||
District: | El Paso | Let Date: | NOV 2015 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2014(997)MM | CSJ: | 0924-06-482 |
Description: | SCHOOL ZONE SAFETY | Handling Code: |
LC |
Limits From: | CITYWIDE | Fund Cat: | 3 |
Limits To: | . | Estimate: | $1,865,895 |
Length: | 1.0 Miles | Actual: | $2,056,250 |
Back... |
Totals for 0924-06-482 | ||
Length: | 1.0 Miles | ||
Estimate: | $1,865,895 | ||
Actual: | $2,056,250 | ||
CCSJ: 0924-06-491 | |||
District: | El Paso | Let Date: | AUG 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 1602(500) | CSJ: | 0924-06-491 |
Description: | REGIONAL BIKE IMPROVEMENTS (ON STATE) | Handling Code: |
|
Limits From: | EL PASO COUNTYWIDE | Fund Cat: | 11 |
Limits To: | . | Estimate: | $395,634 |
Length: | 36.1 Miles | Actual: | $324,899 |
Back... |
Totals for 0924-06-491 | ||
Length: | 36.1 Miles | ||
Estimate: | $395,634 | ||
Actual: | $324,899 | ||
CCSJ: 0924-06-499 | |||
District: | El Paso | Let Date: | AUG 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | CC 924-6-499 | CSJ: | 0924-06-499 |
Description: | WIDEN FROM 4 TO 6 LANES DIVIDED | Handling Code: |
LX |
Limits From: | (ON ROJAS) CITY OF EP LIMITS | Fund Cat: | 3 |
Limits To: | EASTLAKE BLVD | Estimate: | $3,843,034 |
Length: | 1.0 Miles | Actual: | $3,843,034 |
Back... |
Totals for 0924-06-499 | ||
Length: | 1.0 Miles | ||
Estimate: | $3,843,034 | ||
Actual: | $3,843,034 | ||
CCSJ: 0924-06-500 | |||
District: | El Paso | Let Date: | AUG 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | CC 924-6-500 | CSJ: | 0924-06-500 |
Description: | WIDEN FROM 4 TO 6 LANES DIVIDED | Handling Code: |
LX |
Limits From: | (ON EASTLAKE) DESERT MIST DR. | Fund Cat: | 3 |
Limits To: | HORIZON BLVD | Estimate: | $13,464,149 |
Length: | 1.0 Miles | Actual: | $13,434,149 |
Back... |
Totals for 0924-06-500 | ||
Length: | 1.0 Miles | ||
Estimate: | $13,464,149 | ||
Actual: | $13,434,149 | ||
CCSJ: 0924-06-511 | |||
District: | El Paso | Let Date: | JUL 2016 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2016(177)TP | CSJ: | 0924-06-511 |
Description: | CONSTRUCTION OF SIDEWALKS, DUAL USE PATHS, AND ACCESSIBLE CU | Handling Code: |
LC |
Limits From: | CITYWIDE (HORIZON CITY) | Fund Cat: | 3 |
Limits To: | . | Estimate: | $1,186,279 |
Length: | 2.1 Miles | Actual: | $674,447 |
Back... |
Totals for 0924-06-511 | ||
Length: | 2.1 Miles | ||
Estimate: | $1,186,279 | ||
Actual: | $674,447 | ||
CCSJ: 0924-06-515 | |||
District: | El Paso | Let Date: | NOV 2015 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1502(501) | CSJ: | 0924-06-515 |
Description: | RESLER DRIVE BUFFERED BIKE LANES | Handling Code: |
LC |
Limits From: | HELEN OF TROY DR | Fund Cat: | 3 |
Limits To: | BELVIDERE ST | Estimate: | $236,654 |
Length: | 2.3 Miles | Actual: | $198,843 |
Back... |
Totals for 0924-06-515 | ||
Length: | 2.3 Miles | ||
Estimate: | $236,654 | ||
Actual: | $198,843 | ||
CCSJ: 0924-06-516 | |||
District: | El Paso | Let Date: | NOV 2015 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1502(502) | CSJ: | 0924-06-516 |
Description: | INDEPENDENCE DR PEDESTRIAN AND BICYCLE ENHANCEMENTS TO | Handling Code: |
LC |
Limits From: | YARBROUGH DR | Fund Cat: | 3 |
Limits To: | WHITTIER DR | Estimate: | $873,249 |
Length: | 0.9 Miles | Actual: | $664,563 |
Back... |
Totals for 0924-06-516 | ||
Length: | 0.9 Miles | ||
Estimate: | $873,249 | ||
Actual: | $664,563 | ||
CCSJ: 0924-06-517 | |||
District: | El Paso | Let Date: | NOV 2015 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1502(503) | CSJ: | 0924-06-517 |
Description: | VISCOUNT BLVD PEDESTRIAN AND BICYCLE ENHANCEMENTS TO INCLUDE | Handling Code: |
LC |
Limits From: | MONTWOOD DR | Fund Cat: | 3 |
Limits To: | SUNMOUNT DR | Estimate: | $789,794 |
Length: | 1.2 Miles | Actual: | $703,275 |
Back... |
Totals for 0924-06-517 | ||
Length: | 1.2 Miles | ||
Estimate: | $789,794 | ||
Actual: | $703,275 | ||
CCSJ: 0924-06-518 | |||
District: | El Paso | Let Date: | NOV 2015 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1502(504) | CSJ: | 0924-06-518 |
Description: | RIVER BEND DR PEDESTRIAN AND BICYCLE ENHANCEMENTS TO INCLUDE | Handling Code: |
LC |
Limits From: | FRONTERA RD | Fund Cat: | 3 |
Limits To: | TURNSTONE DR | Estimate: | $952,265 |
Length: | 1.1 Miles | Actual: | $915,945 |
Back... |
Totals for 0924-06-518 | ||
Length: | 1.1 Miles | ||
Estimate: | $952,265 | ||
Actual: | $915,945 | ||
CCSJ: 0924-06-519 | |||
District: | El Paso | Let Date: | AUG 2016 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2016(903)TP | CSJ: | 0924-06-519 |
Description: | HAWTHORNE STREET PEDESTRIAN AND BICYCLE ENHANCEMENT | Handling Code: |
LC |
Limits From: | RIM RD | Fund Cat: | 3 |
Limits To: | CROSBY AVE | Estimate: | $480,291 |
Length: | 0.1 Miles | Actual: | $334,750 |
Back... |
Totals for 0924-06-519 | ||
Length: | 0.1 Miles | ||
Estimate: | $480,291 | ||
Actual: | $334,750 | ||
CCSJ: 0924-06-520 | |||
District: | El Paso | Let Date: | JUN 2016 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2016(796)TP | CSJ: | 0924-06-520 |
Description: | SOCORRO SAFE ROUTES TO SCHOOL, PHASE 2 (BUILD SIDEWALKS / CROS | Handling Code: |
|
Limits From: | SOCORRO CITY LIMITS | Fund Cat: | 3 |
Limits To: | . | Estimate: | $445,216 |
Length: | 2.8 Miles | Actual: | $373,865 |
Back... |
Totals for 0924-06-520 | ||
Length: | 2.8 Miles | ||
Estimate: | $445,216 | ||
Actual: | $373,865 | ||
CCSJ: 0924-06-524 | |||
District: | El Paso | Let Date: | JAN 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2016(628) | CSJ: | 0924-06-524 |
Description: | PURCHASE TWO 35' BUSES AND ONE LOW FLOOR 28' BUS (TO ASSIST | Handling Code: |
TR |
Limits From: | (ON I-10) DTC-REMCON | Fund Cat: | 5 |
Limits To: | ETC-SUNMOUNT | Estimate: | $1,250,000 |
Length: | 1.0 Miles | Actual: | $1,250,000 |
Back... |
Totals for 0924-06-524 | ||
Length: | 1.0 Miles | ||
Estimate: | $1,250,000 | ||
Actual: | $1,250,000 | ||
CCSJ: 0924-06-525 | |||
District: | El Paso | Let Date: | JAN 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2016(631) | CSJ: | 0924-06-525 |
Description: | WEST EL PASO TRAFFIC MITIGATION CIRCULATOR SERVICE | Handling Code: |
TR |
Limits From: | (ON I-10) WT-REMCON | Fund Cat: | 5 |
Limits To: | NW-TRANSMOUNTAIN TO ET-SUNMOUNT | Estimate: | $2,100,000 |
Length: | 1.0 Miles | Actual: | $2,100,000 |
Back... |
Totals for 0924-06-525 | ||
Length: | 1.0 Miles | ||
Estimate: | $2,100,000 | ||
Actual: | $2,100,000 | ||
CCSJ: 0924-06-526 | |||
District: | El Paso | Let Date: | FEB 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2016(630)MM | CSJ: | 0924-06-526 |
Description: | TWELVE BUS ENGINE REBUILDS TO EXTEND USEFUL LIFE ON BUSES TO | Handling Code: |
TR |
Limits From: | VARIOUS | Fund Cat: | 7 |
Limits To: | . | Estimate: | $1,486,634 |
Length: | 1.0 Miles | Actual: | $1,486,634 |
Back... |
Totals for 0924-06-526 | ||
Length: | 1.0 Miles | ||
Estimate: | $1,486,634 | ||
Actual: | $1,486,634 | ||
CCSJ: 0924-06-527 | |||
District: | El Paso | Let Date: | AUG 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1602(674) | CSJ: | 0924-06-527 |
Description: | EL PASO COUNTY REGIONAL TRANSIT FEASIBILITY STUDY | Handling Code: |
XX |
Limits From: | COUNTYWIDE | Fund Cat: | 12 |
Limits To: | . | Estimate: | $500,000 |
Length: | 1.0 Miles | Actual: | $500,000 |
Back... |
Totals for 0924-06-527 | ||
Length: | 1.0 Miles | ||
Estimate: | $500,000 | ||
Actual: | $500,000 | ||
CCSJ: 0924-06-528 | |||
District: | El Paso | Let Date: | AUG 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1602(675) | CSJ: | 0924-06-528 |
Description: | ACTIVATE / CUSTOMIZE METROPIA MOBILE AND METROPIA SYNERGY SOLU | Handling Code: |
XX |
Limits From: | CITYWIDE | Fund Cat: | 3 |
Limits To: | . | Estimate: | $1,791,000 |
Length: | 1.0 Miles | Actual: | $1,791,000 |
Back... |
Totals for 0924-06-528 | ||
Length: | 1.0 Miles | ||
Estimate: | $1,791,000 | ||
Actual: | $1,791,000 | ||
CCSJ: 0924-06-529 | |||
District: | El Paso | Let Date: | FEB 2016 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1602(055)FRS2 | CSJ: | 0924-06-529 |
Description: | INSTALL LIGHTS AND GATES AT RAILROAD CROSSING | Handling Code: |
XX |
Limits From: | ON SAN ANTONIO AVE IN EL PASO | Fund Cat: | 8 |
Limits To: | AT UP RR DOT #796511J | Estimate: | $236,629 |
Length: | 0.1 Miles | Actual: | $236,629 |
Back... |
Totals for 0924-06-529 | ||
Length: | 0.1 Miles | ||
Estimate: | $236,629 | ||
Actual: | $236,629 | ||
CCSJ: 0924-06-531 | |||
District: | El Paso | Let Date: | AUG 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1602(676)MM | CSJ: | 0924-06-531 |
Description: | BIKE PROG WILL PROVIDE MORE COMMUTER TRAVEL OPTIONS WITH 8 B | Handling Code: |
XX |
Limits From: | DOWNTOWN EL PASO | Fund Cat: | 3 |
Limits To: | UNIVERSITY OF TEXAS AT EL PASO | Estimate: | $584,000 |
Length: | 1.0 Miles | Actual: | $584,000 |
Back... |
Totals for 0924-06-531 | ||
Length: | 1.0 Miles | ||
Estimate: | $584,000 | ||
Actual: | $584,000 | ||
CCSJ: 2121-04-098 | |||
District: | El Paso | Let Date: | JUL 2016 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 2121-4-98 | CSJ: | 2121-04-098 |
Description: | WIDEN ROADWAY TO 8 LANES | Handling Code: |
|
Limits From: | FM 659 (ZARAGOZA) | Fund Cat: | 2M |
Limits To: | EASTLAKE | Estimate: | $15,135,187 |
Length: | 3.2 Miles | Actual: | $12,915,902 |
Back... |
Totals for 2121-04-098 | ||
Length: | 3.2 Miles | ||
Estimate: | $15,135,187 | ||
Actual: | $12,915,902 | ||
CCSJ: 2552-01-054 | |||
District: | El Paso | Let Date: | NOV 2015 |
Highway: | SL 375 | Let Status: | Actual |
Project ID: | NH 2016(343) | CSJ: | 2552-01-054 |
Description: | IMPROVE PEDESTRIAN CONNECTIVITY AT FMSP | Handling Code: |
|
Limits From: | 0.5 MI W OF FMSP ENTRANCE | Fund Cat: | 11 |
Limits To: | 1.05 MI E OF FMSP ENTRANCE | Estimate: | $3,187,094 |
Length: | 2.6 Miles | Actual: | $3,200,882 |
Back... |
Totals for 2552-01-054 | ||
Length: | 2.6 Miles | ||
Estimate: | $3,187,094 | ||
Actual: | $3,200,882 | ||
CCSJ: 2552-03-054 | |||
District: | El Paso | Let Date: | DEC 2015 |
Highway: | SL 375 | Let Status: | Actual |
Project ID: | NH 2013(631) | CSJ: | 2552-03-054 |
Description: | WIDEN TO 6 LANES | Handling Code: |
|
Limits From: | US 62/180 (MONTANA AVE) | Fund Cat: | 1 |
Limits To: | BOB HOPE DR | Estimate: | $24,610,458 |
Length: | 7.8 Miles | Actual: | $21,784,387 |
Back... |
Totals for 2552-03-054 | ||
Length: | 7.8 Miles | ||
Estimate: | $24,610,458 | ||
Actual: | $21,784,387 | ||
CCSJ: 2552-03-057 | |||
District: | El Paso | Let Date: | MAY 2016 |
Highway: | FM 2529 | Let Status: | Actual |
Project ID: | BR 1602(073) | CSJ: | 2326-01-026 |
Description: | BRIDGE CULVERT RAIL UPGRADE AND INSTALLATION | Handling Code: |
|
Limits From: | 1.023 MI S OF FM 2637 | Fund Cat: | 6 |
Limits To: | 1.103 MI S OF US 54 | Estimate: | $193,860 |
Length: | 2.4 Miles | Actual: | $189,395 |
District: | El Paso | Let Date: | MAY 2016 |
Highway: | SL 375 | Let Status: | Actual |
Project ID: | BR 1602(072) | CSJ: | 2552-03-057 |
Description: | BRIDGE CULVERT RAIL UPGRADE AND INSTALLATION | Handling Code: |
|
Limits From: | 1.85 MI S OF FM 659 | Fund Cat: | 6 |
Limits To: | 0.22 MI N OF FM 76 | Estimate: | $94,786 |
Length: | 3.6 Miles | Actual: | $107,530 |
District: | El Paso | Let Date: | MAY 2016 |
Highway: | SL 375 | Let Status: | Actual |
Project ID: | BR 1602(072) | CSJ: | 2552-04-045 |
Description: | BRIDGE CULVERT RAIL UPGRADE AND INSTALLATION | Handling Code: |
|
Limits From: | 4.319 MI E OF US 54 | Fund Cat: | 6 |
Limits To: | 1.544 MI W OF US 54 | Estimate: | $25,703 |
Length: | 5.9 Miles | Actual: | $26,916 |
Back... |
Totals for 2552-03-057 | ||
Length: | 11.9 Miles | ||
Estimate: | $314,349 | ||
Actual: | $323,841 | ||
CCSJ: 3572-01-005 | |||
District: | El Paso | Let Date: | AUG 2016 |
Highway: | SS 6 | Let Status: | Actual |
Project ID: | STP 1602(502)MM | CSJ: | 3572-01-005 |
Description: | CONSTRUCTION OF CROSSWALKS, INSTALL OF NEW SCHL ZONE FLASHERS | Handling Code: |
|
Limits From: | 4TH STREET | Fund Cat: | 1 |
Limits To: | EAST OF DESERT SAGE STREET | Estimate: | $190,114 |
Length: | 0.4 Miles | Actual: | $198,745 |
Back... |
Totals for 3572-01-005 | ||
Length: | 0.4 Miles | ||
Estimate: | $190,114 | ||
Actual: | $198,745 |
|