Detail Letting Schedule for Comal County (FY 2015)
Comal County (FY 2015) |
CCSJ: 0016-04-109 | |||
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 2015(359)HES | CSJ: | 0016-04-109 |
Description: | INSTALL PROFILE PAVEMENT MARKINGS ALONG CENTERLINE | Handling Code: |
|
Limits From: | FM 725 | Fund Cat: | 8 |
Limits To: | HAYS COUNTY LINE | Estimate: | $342,789 |
Length: | 9.6 Miles | Actual: | $328,217 |
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | FM 78 | Let Status: | Actual |
Project ID: | STP 2015(356)HES | CSJ: | 0025-10-090 |
Description: | MILL - IN RUMBLESTRIPS ALONG SHOULDERS, PAVEMENT MARKINGS & | Handling Code: |
|
Limits From: | BEXAR COUNTY LINE | Fund Cat: | 8 |
Limits To: | FM 1620 | Estimate: | $86,974 |
Length: | 15.8 Miles | Actual: | $84,741 |
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | US 181 | Let Status: | Actual |
Project ID: | STP 2015(366)HES | CSJ: | 0100-03-072 |
Description: | MILL - IN RUMBLESTRIPS ALONG CENTERLINE & SHOULDERS, PAVEMENT | Handling Code: |
|
Limits From: | FM 537 | Fund Cat: | 8 |
Limits To: | 0.3 MI S OF FM 537 | Estimate: | $4,520 |
Length: | 0.3 Miles | Actual: | $4,330 |
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | US 181 | Let Status: | Actual |
Project ID: | STP 2015(365)HES | CSJ: | 0100-04-037 |
Description: | MILL - IN RUMBLESTRIPS ALONG CENTERLINE & SHOULDERS, PAVEMENT | Handling Code: |
|
Limits From: | 0.3 MI S OF FM 537 | Fund Cat: | 8 |
Limits To: | FM 541 | Estimate: | $38,085 |
Length: | 4.1 Miles | Actual: | $38,243 |
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | SH 46 | Let Status: | Actual |
Project ID: | STP 2015(358)HES | CSJ: | 0215-01-040 |
Description: | INSTALL PROFILE PAVEMENT MARKINGS ALONG CENTERLINE | Handling Code: |
|
Limits From: | FM 311 | Fund Cat: | 8 |
Limits To: | FM 3009 | Estimate: | $55,245 |
Length: | 2.8 Miles | Actual: | $45,833 |
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | SH 46 | Let Status: | Actual |
Project ID: | STP 2015(362)HES | CSJ: | 0215-06-032 |
Description: | MILL - IN RUMBLESTRIPS ALONG CENTERLINE & SHOULDERS, PAVEMENT | Handling Code: |
|
Limits From: | US 87 | Fund Cat: | 8 |
Limits To: | FM 3351 | Estimate: | $60,995 |
Length: | 10.1 Miles | Actual: | $67,893 |
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | SH 46 | Let Status: | Actual |
Project ID: | STP 2015(357)HES | CSJ: | 0216-01-050 |
Description: | MILL - IN RUMBLESTRIPS ALONG SHOULDERS, PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | GUADALUPE COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 46/LP 337 | Estimate: | $13,230 |
Length: | 6.4 Miles | Actual: | $12,522 |
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 2015(361)HES | CSJ: | 0291-03-064 |
Description: | MILL - IN RUMBLESTRIPS ALONG SHOULDERS, PAVEMENT MARKINGS & | Handling Code: |
|
Limits From: | 1.36 MI S OF SH 173 | Fund Cat: | 8 |
Limits To: | FM 1273 | Estimate: | $27,822 |
Length: | 5.7 Miles | Actual: | $33,134 |
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | SH 123 | Let Status: | Actual |
Project ID: | STP 2015(354)HES | CSJ: | 0366-02-084 |
Description: | MILL - IN RUMBLESTRIPS ALONG CENTERLINE & SHOULDERS, PAVEMENT | Handling Code: |
|
Limits From: | HAYS COUNTY LINE | Fund Cat: | 8 |
Limits To: | IH 10 | Estimate: | $84,994 |
Length: | 21.8 Miles | Actual: | $97,438 |
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | SH 123 | Let Status: | Actual |
Project ID: | STP 2015(353)HES | CSJ: | 0366-03-063 |
Description: | SAFETY TREAT FIXED OBJECT | Handling Code: |
|
Limits From: | WILSON COUNTY LINE | Fund Cat: | 8 |
Limits To: | FM 477 | Estimate: | $117,113 |
Length: | 9.4 Miles | Actual: | $125,451 |
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | FM 1103 | Let Status: | Actual |
Project ID: | STP 2015(364)HES | CSJ: | 1268-01-011 |
Description: | INSTALL PROFILE PAVEMENT MARKINGS ALONG CENTERLINE | Handling Code: |
|
Limits From: | IH 35 | Fund Cat: | 8 |
Limits To: | GUADALUPE COUNTY LINE | Estimate: | $3,128 |
Length: | 0.3 Miles | Actual: | $2,778 |
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | FM 1103 | Let Status: | Actual |
Project ID: | STP 2015(363)HES | CSJ: | 1268-02-025 |
Description: | INSTALL PROFILE PAVEMENT MARKINGS ALONG CENTERLINE | Handling Code: |
|
Limits From: | COMAL COUNTY LINE | Fund Cat: | 8 |
Limits To: | FM 78 | Estimate: | $89,566 |
Length: | 5.6 Miles | Actual: | $77,945 |
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | FM 1102 | Let Status: | Actual |
Project ID: | STP 2015(360)HES | CSJ: | 1273-01-033 |
Description: | INSTALL PROFILE PAVEMENT MARKINGS ALONG CENTERLINE | Handling Code: |
|
Limits From: | FM 306 | Fund Cat: | 8 |
Limits To: | IH 35 | Estimate: | $109,606 |
Length: | 7.4 Miles | Actual: | $86,447 |
District: | San Antonio | Let Date: | JAN 2015 |
Highway: | FM 1518 | Let Status: | Actual |
Project ID: | STP 2015(355)HES | CSJ: | 1542-01-018 |
Description: | MILL - IN CENTERLINE RUMBLESTRIP, REPLACE CENTERLINE PAVEMENT | Handling Code: |
|
Limits From: | IH 35 | Fund Cat: | 8 |
Limits To: | FM 78 | Estimate: | $19,111 |
Length: | 3.7 Miles | Actual: | $21,287 |
Back... |
Totals for 0016-04-109 | ||
---|---|---|---|
Length: | 103.0 Miles | ||
Estimate: | $1,053,178 | ||
Actual: | $1,026,259 | ||
CCSJ: 0016-04-110 | |||
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 2015(282) | CSJ: | 0016-04-110 |
Description: | SEAL COAT AND PAVEMENT MARKINGS ON FRONTAGE ROADS | Handling Code: |
|
Limits From: | KOHLENBERG ROAD | Fund Cat: | 1 |
Limits To: | COMAL/HAYES COUNTY LINE | Estimate: | $361,422 |
Length: | 4.5 Miles | Actual: | $342,876 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2015(282) | CSJ: | 0072-05-087 |
Description: | SEAL COAT AND PAVEMENT MARKINGS ON FRONTAGE ROADS | Handling Code: |
|
Limits From: | .31 MI E OF 473 | Fund Cat: | 1 |
Limits To: | FM 289 | Estimate: | $100,594 |
Length: | 2.8 Miles | Actual: | $99,522 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2015(282) | CSJ: | 0142-15-025 |
Description: | SEAL COAT AND PAVEMENT MARKINGS ON FRONTAGE ROADS | Handling Code: |
|
Limits From: | .77 MI W OF US 87 | Fund Cat: | 1 |
Limits To: | .31 MI W OF US 87 | Estimate: | $22,975 |
Length: | 0.5 Miles | Actual: | $21,764 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | SH 46 | Let Status: | Actual |
Project ID: | STP 2015(279)HESG | CSJ: | 0215-07-020 |
Description: | PLACE INVERTED PROFILE PAVEMENT MARKINGS ALONG EDGELINES | Handling Code: |
|
Limits From: | KENDALL COUNTY LINE | Fund Cat: | 8 |
Limits To: | 0.7 MI W OF US 281 | Estimate: | $126,386 |
Length: | 8.0 Miles | Actual: | $114,934 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | SH 46 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 0215-07-023 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | KENDALL/COMAL C/L | Fund Cat: | 1 |
Limits To: | 0.7 MI W OF US 281 | Estimate: | $357,223 |
Length: | 8.0 Miles | Actual: | $336,041 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | SH 55 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 0235-04-028 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | REAL/UVALDE COUNTY LINE | Fund Cat: | 1 |
Limits To: | 1.5 MI S OF RM 334 (NUECES RIVER) | Estimate: | $660,910 |
Length: | 16.6 Miles | Actual: | $638,306 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | SH 127 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 0369-01-038 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.3 MI N OF FM 2690 | Fund Cat: | 1 |
Limits To: | RM 187 | Estimate: | $557,467 |
Length: | 15.3 Miles | Actual: | $550,242 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | RM 32 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 0511-02-020 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | BLANCO/COMAL COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 3424 | Estimate: | $282,136 |
Length: | 9.1 Miles | Actual: | $269,057 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | RM 187 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 0678-02-036 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 4 MI N OF RM 337 (LOST MAPLE SNA) | Fund Cat: | 1 |
Limits To: | BANDERA/UVALDE COUNTY LINE | Estimate: | $485,404 |
Length: | 14.5 Miles | Actual: | $474,036 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | FM 465 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 0850-01-023 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 78 | Fund Cat: | 1 |
Limits To: | IH 10 FRONTAGE ROAD | Estimate: | $114,512 |
Length: | 3.7 Miles | Actual: | $108,735 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | FM 467 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 0851-01-023 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 775 | Fund Cat: | 1 |
Limits To: | BS 123 | Estimate: | $423,539 |
Length: | 13.3 Miles | Actual: | $404,291 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | FM 20 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 0987-01-034 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 123 | Fund Cat: | 1 |
Limits To: | 2.86 MI E OF SH 123 | Estimate: | $84,624 |
Length: | 2.9 Miles | Actual: | $82,474 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | FM 1049 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 1168-02-016 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 4.673 MI S OF SH 127 | Fund Cat: | 1 |
Limits To: | US 90 | Estimate: | $195,962 |
Length: | 5.2 Miles | Actual: | $189,127 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | FM 1049 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 1168-03-012 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 90 (KNIPPA) | Fund Cat: | 1 |
Limits To: | FM 1023 | Estimate: | $119,394 |
Length: | 4.0 Miles | Actual: | $113,631 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | FM 1102 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 1273-01-035 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 2439 | Fund Cat: | 1 |
Limits To: | IH 35 FRONTAGE ROAD | Estimate: | $57,928 |
Length: | 1.1 Miles | Actual: | $53,932 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | FM 2369 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 2175-01-015 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 90 | Fund Cat: | 1 |
Limits To: | FM 1435 | Estimate: | $183,698 |
Length: | 6.2 Miles | Actual: | $179,733 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | FM 539 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 2233-02-006 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 467 | Fund Cat: | 1 |
Limits To: | GUADALUPE/WILSON COUNTY LINE | Estimate: | $167,472 |
Length: | 3.7 Miles | Actual: | $160,108 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | FM 2439 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 2293-02-006 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 1102 | Fund Cat: | 1 |
Limits To: | HAYS/COMAL C/L | Estimate: | $18,773 |
Length: | 0.5 Miles | Actual: | $14,354 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | FM 3009 | Let Status: | Actual |
Project ID: | STP 2015(280)HESG | CSJ: | 3107-01-040 |
Description: | PLACE INVERTED PROFILE PAVEMENT MARKINGS ON EDGELINES & | Handling Code: |
|
Limits From: | FM 1863 | Fund Cat: | 8 |
Limits To: | FM 2252 | Estimate: | $132,903 |
Length: | 8.1 Miles | Actual: | $120,840 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | FM 3009 | Let Status: | Actual |
Project ID: | STP 2015(278) | CSJ: | 3107-01-041 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.119 MI NORTH OF BAT CAVE | Fund Cat: | 1 |
Limits To: | FM 2252 | Estimate: | $219,678 |
Length: | 8.6 Miles | Actual: | $204,287 |
District: | San Antonio | Let Date: | NOV 2014 |
Highway: | SL 534 | Let Status: | Actual |
Project ID: | NH 2015(281) | CSJ: | 3362-01-014 |
Description: | SEAL COAT & PAVMENT MARKINGS | Handling Code: |
|
Limits From: | IH 10 FRONTAGE ROAD | Fund Cat: | 1 |
Limits To: | SH 173 | Estimate: | $310,986 |
Length: | 5.0 Miles | Actual: | $290,969 |
Back... |
Totals for 0016-04-110 | ||
Length: | 141.6 Miles | ||
Estimate: | $4,983,986 | ||
Actual: | $4,769,259 | ||
CCSJ: 0215-07-025 | |||
District: | San Antonio | Let Date: | AUG 2015 |
Highway: | SH 46 | Let Status: | Actual |
Project ID: | STP 1502(272)HES | CSJ: | 0215-07-025 |
Description: | FLASHING BEACON, HIGH FRICTION SURFACE TREATMENT | Handling Code: |
|
Limits From: | AT BLANCO ROAD | Fund Cat: | 8 |
Limits To: | . | Estimate: | $279,971 |
Length: | 0.2 Miles | Actual: | $299,823 |
District: | San Antonio | Let Date: | AUG 2015 |
Highway: | SH 123 | Let Status: | Actual |
Project ID: | STP 1502(266)HES | CSJ: | 0366-02-085 |
Description: | HIGH FRICTION SURFACE TREATMENT AND ADD LEFT TURN LANE | Handling Code: |
|
Limits From: | AT FM 758 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $294,718 |
Length: | 0.5 Miles | Actual: | $310,139 |
District: | San Antonio | Let Date: | AUG 2015 |
Highway: | SH 123 | Let Status: | Actual |
Project ID: | STP 1502(268)HES | CSJ: | 0366-02-086 |
Description: | INSTALL FLASHING BEACON, CONSTRUCT LEFT TURN LANE AND ADD | Handling Code: |
|
Limits From: | AT FM 1101 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $190,901 |
Length: | 0.5 Miles | Actual: | $211,368 |
District: | San Antonio | Let Date: | AUG 2015 |
Highway: | FM 1863 | Let Status: | Actual |
Project ID: | STP 1502(269)HES | CSJ: | 0470-03-019 |
Description: | FLASHING BEACON, HIGH FRICTION SURFACE TREATMENT AT | Handling Code: |
|
Limits From: | AT SMITHSON VALLEY ROAD (NORTH) | Fund Cat: | 8 |
Limits To: | . | Estimate: | $145,620 |
Length: | 0.2 Miles | Actual: | $155,717 |
District: | San Antonio | Let Date: | AUG 2015 |
Highway: | FM 3432 | Let Status: | Actual |
Project ID: | STP 1502(270)HES | CSJ: | 0850-04-026 |
Description: | CONSTRUCT LEFT TURN LANE | Handling Code: |
|
Limits From: | AT CR 324 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $249,140 |
Length: | 0.3 Miles | Actual: | $443,846 |
District: | San Antonio | Let Date: | AUG 2015 |
Highway: | FM 306 | Let Status: | Actual |
Project ID: | STP 1502(267)HES | CSJ: | 0857-01-031 |
Description: | CONSTRUCT LEFT TURN LANE AT BRAVO, TEXTURIZE SHOULDERS - | Handling Code: |
|
Limits From: | 2.4 MI S OF FM 3424 | Fund Cat: | 8 |
Limits To: | 2.7 MI S OF FM 3424 | Estimate: | $207,371 |
Length: | 0.2 Miles | Actual: | $379,385 |
District: | San Antonio | Let Date: | AUG 2015 |
Highway: | FM 3351 | Let Status: | Actual |
Project ID: | STP 1502(271)HES | CSJ: | 3212-05-008 |
Description: | FLASHING BEACON, HIGH FRICTION SURFACE TREATMENT AT | Handling Code: |
|
Limits From: | AT AMMANN ROAD | Fund Cat: | 8 |
Limits To: | . | Estimate: | $243,450 |
Length: | 0.3 Miles | Actual: | $286,141 |
Back... |
Totals for 0215-07-025 | ||
Length: | 2.2 Miles | ||
Estimate: | $1,611,171 | ||
Actual: | $2,086,419 | ||
CCSJ: 1728-02-058 | |||
District: | San Antonio | Let Date: | AUG 2015 |
Highway: | FM 306 | Let Status: | Actual |
Project ID: | STP 1502(615)MM | CSJ: | 1728-02-058 |
Description: | EXPAND 2 TO 4 LANES WITH CONTINUOUS LEFT TURN LANE, BIKE | Handling Code: |
|
Limits From: | HOFFMANN LANE | Fund Cat: | 7 |
Limits To: | 0.5 MI NORTH OF HUNTER ROAD | Estimate: | $11,017,434 |
Length: | 3.2 Miles | Actual: | $7,936,419 |
Back... |
Totals for 1728-02-058 | ||
Length: | 3.2 Miles | ||
Estimate: | $11,017,434 | ||
Actual: | $7,936,419 |
|