Letting Schedule for Houston District (FY 2012)
Letting Schedule for Houston District (FY 2012) | ||||
Last Update: Monday, September 24, 2012 |
Houston District (FY 2012) |
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller | ||||||
Brazoria County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0178-02-084 | SH 35 | Actual | APR 2012 | $4,480,937 | 1 | SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS |
0178-03-147 | SH 35 | Actual | FEB 2012 | $338,836 | 8 | IMPROVE TRAFFIC SIGNAL |
0178-08-015 | BS 35-C | Actual | DEC 2011 | $168,000 | 10 | FY 2011 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0587-01-061 | FM 1495 | Actual | DEC 2011 | $84,224 | 10 | FY 2011 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0598-02-094 | SH 288 | Actual | APR 2012 | $489,303 | 1 | CONSTRUCT TURNAROUND AND RECONFIGURE RIGHT TURN LANE |
0912-31-164 | CR | Actual | JAN 2012 | $815,348 | 6 | REPLACE BRIDGE (NBI# 12020AA0519002) |
0912-31-203 | CS | Actual | JUL 2012 | $2,748,072 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12020D00561001) |
0912-31-207 | CS | Actual | JAN 2012 | $483,526 | 6 | REPLACE BRIDGE (NBI# 12020M00367001) |
0912-31-227 | VA | Actual | SEP 2011 | $114,114 | 10 | LANDSCAPE DEVELOPMENT_ON BS 288 AND FM 2004 |
0912-31-236 | CR | Actual | DEC 2011 | $18,024,342 | 3 | CONSTRUCT REVETMENT AND OVERLAY EXISTING ROADWAY; CO PLANS / |
0912-31-237 | CS | Actual | JUN 2012 | $766,157 | 6 | REPLACE BRIDGE (NBI# (120200D01100001) |
0912-31-239 | VA | Actual | APR 2012 | $7,588,695 | 1 | ACP OVERLAY AND RE - STRIPE TO PROVIDE HURRICANE EVACUATION |
0912-31-275 | CR | Actual | AUG 2012 | $15,980,617 | 3 | RECONST 2 - LN RDWY FROM SH 288 TO E OF BS 288, CONST 2 - LN |
0912-31-277 | CS | Actual | APR 2012 | $331,146 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12020M01825002) |
1004-01-052 | FM 524 | Actual | MAY 2012 | $249,163 | 1 | UPGRADE DRAINAGE STRUCTURES |
Fort Bend County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0111-03-056 | FM 521 | Actual | DEC 2011 | $33,600 | 10 | FY 2010 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0188-02-043 | SH 36 | Actual | MAY 2012 | $6,309,409 | 6 | WIDEN TO ADD A NORTHBOUND EVACUATION LANE WITH OVERLAY AND |
0527-08-010 | FM 1952 | Actual | JUL 2012 | $324,241 | 1 | BASE REPAIR & OVERLAY |
1683-01-036 | FM 1640 | Actual | DEC 2011 | $1,000,000 | 1 | RR SIGNAL AND REPLANKING |
2105-01-045 | FM 2234 | Actual | JUL 2012 | $830,894 | 3 | ACCESS MANAGEMENT (MEDIANS) IN MISSOURI CITY |
3048-01-013 | FM 2977 | Actual | DEC 2011 | $22,400 | 10 | FY 2008 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
3510-04-044 | SH 99 | Actual | AUG 2012 | $32,980,095 | 3 | CONSTRUCT OVERPASS AND APPROACHES |
3510-04-050 | SH 99 | Actual | AUG 2012 | $19,104,708 | 3 | CONSTRUCT OVERPASS AND APPROACHES |
Galveston County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0051-09-025 | FM 3005 | Actual | SEP 2011 | $1,274,439 | 1 | PLANE, ACP OVERLAY AND PAVEMENT MARKINGS |
0192-04-102 | SH 6 | Actual | MAY 2012 | $3,221,796 | 1 | BASE REPAIR, SEAL COAT & ACP OVERLAY |
0389-06-101 | SH 146 | Actual | MAY 2012 | $98,935 | 8 | ADD LEFT TURN LANE |
0500-01-140 | IH 45 | Actual | JUL 2012 | $626,034 | 1 | ASPHALT CONCRETE PAVEMENT OVERLAY |
0500-04-125 | IH 45 | Actual | JUN 2012 | $473,737 | 1 | INSTALL LEFT TURN LANES |
0686-01-047 | FM 1765 | Actual | APR 2012 | $142,457 | 8 | IMPROVE TRAFFIC SIGNAL |
0686-02-025 | FM 1765 | Actual | APR 2012 | $464,138 | 1 | BASE REPAIR, 1.5" ACP OVERLAY AND PAVEMENT MARKINGS |
0976-03-095 | FM 518 | Actual | DEC 2011 | $120,320 | 10 | FY 2008 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0976-03-097 | FM 518 | Actual | APR 2012 | $824,471 | 1 | BASE REPAIR, MILLING & ACP OVERLAY |
0976-07-011 | SH 96 | Actual | APR 2012 | $3,978,629 | 1 | MILL SEAL COAT, BASE REPAIR & ACP OVERLAY |
1607-02-021 | FM 1764 | Actual | FEB 2012 | $395,632 | 1 | MILLING, OCST & ACP OVERLAY |
3049-01-028 | FM 646 | Actual | SEP 2011 | $2,341,741 | 1 | BASE REPAIR, OCST AND OVERLAY |
3595-01-015 | SH 275 | Actual | DEC 2011 | $112,000 | 10 | FY 2010 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
Harris County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0027-09-097 | US 90A | Actual | DEC 2011 | $48,128 | 10 | FY 2008 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0027-09-098 | US 90A | Actual | DEC 2011 | $24,064 | 10 | FY 2010 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0027-13-205 | US 59 | Actual | JUN 2012 | $4,414,105 | 3 | CONSTRUCT FOUTAINVIEW AUXILIARY LANE |
0028-01-094 | BU 90-U | Actual | AUG 2012 | $2,039,775 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12102002801007) |
0028-02-082 | US 90 | Actual | JUN 2012 | $1,119,755 | 1 | ADD RAMP REVERSAL |
0050-06-083 | US 290 | Actual | JUL 2012 | $2,824,350 | 3 | INTERSECTION IMPROVEMENTS |
0177-06-080 | US 59 | Actual | NOV 2011 | $349,419 | 1 | REM CONC PVT, BS, CONC BAR, RR, AND CONST DITCH, FAST TRACK |
0271-07-303 | IH 10 | Actual | OCT 2011 | $141,823 | 1 | CONSTRUCT NOISE WALL |
0271-07-304 | IH 10 | Actual | APR 2012 | $2,096,612 | 1 | CONSTRUCT DRAINAGE AND DETENTION FACILITIES |
0271-16-131 | IH 610 | Actual | DEC 2011 | $1,018,574 | 1 | HIGH MAST ILLUMINATION |
0271-16-132 | IH 610 | Actual | FEB 2012 | $309,185 | 8 | IMPROVE TRAFFIC SIGNAL |
0389-05-119 | SH 146 | Actual | JUN 2012 | $11,747,790 | 1 | CONSTRUCT NB DIRECT CONNECTOR |
0389-13-058 | SH 146 | Actual | AUG 2012 | $100,000 | 10 | LANDSCAPE DEVELOPMENT (PURCHASE OF MATERIALS ONLY) (NON - LET) |
0500-03-569 | IH 45 | Actual | MAR 2012 | $256,944 | 8 | IMPROVE TRAFFIC SIGNAL |
0502-01-206 | SH 225 | Actual | JUL 2012 | $1,874,035 | 1 | HIGH MAST ILLUMINATION |
0502-01-208 | SH 225 | Actual | AUG 2012 | $2,342,263 | 1 | FULL DEPTH REPAIR, MILLING, CURB REPAIR & ACP OVERLAY |
0508-01-331 | IH 10 | Actual | SEP 2011 | $1,550,849 | 1 | INSTALLATION OF EAST / WEST U - TURNS, CONCRETE PAVING, |
0598-01-094 | SH 288 | Actual | AUG 2012 | $953,843 | 3 | CONSTRUCT TWO LANE DIRECT CONNECTOR FROM IH 610 EB TO SH 288 |
0720-03-124 | SH 249 | Actual | DEC 2011 | $8,400 | 10 | FY 2010 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0720-03-125 | SH 249 | Actual | DEC 2011 | $67,200 | 10 | FY 2010 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0912-00-283 | VA | Actual | OCT 2011 | $1,500,000 | 1 | TMS MAINTENANCE |
0912-00-324 | VA | Actual | JUN 2012 | $555,317 | 1 | INSTALL BATTERY BACK UP AND UPGRADE POWER METERS |
0912-00-337 | VA | Actual | AUG 2012 | $90,000 | 1 | SIGNAL SYSTEM ITS (NON - LETTING) |
0912-00-380 | VA | Actual | SEP 2011 | $1,515,999 | 1 | NEW TRAFFIC SIGNALS_ (NON - SITE SPECIFIC) |
0912-00-404 | VA | Actual | NOV 2011 | $1,680,068 | 1 | REPAIR OF BRIDGE APPROACHES |
0912-00-414 | VA | Actual | APR 2012 | $300,000 | 1 | FLOW SIGNAL REHABILITATION |
0912-00-417 | VA | Actual | APR 2012 | $859,065 | 1 | NEW / UPGRADE HPS LIGHT ASSEMBLIES TO LED LIGHT ASSEMBLIES |
0912-00-445 | VA | Actual | SEP 2011 | $3,000,000 | 1 | ITS - MAINTENANCE (NON - LETTING) |
0912-00-448 | VA | Actual | MAY 2012 | $3,000,000 | 7 | REGIONAL VANPOOL PROGRAM (FY 2012) |
0912-00-453 | VA | Actual | DEC 2011 | $2,062,500 | 7 | REGIONAL VANPOOL PROGRAM (FY 2011) |
0912-00-457 | VA | Actual | APR 2012 | $632,075 | 1 | ASR REMEDIATION OF HIGH MAST FOUNDATIONS |
0912-00-459 | VA | Actual | AUG 2012 | $437,500 | 5 | CLEAN AIR ACTION PROGRAM STAFF MARKETING AND OUTREACH |
0912-00-461 | VA | Actual | MAY 2012 | $2,000,000 | 5 | REGIONAL VANPOOL PROGRAM (FY 2012) |
0912-00-468 | VA | Actual | APR 2012 | $1,130,845 | 10 | LANDSCAPE DEVELOPMENT |
0912-00-469 | VA | Actual | MAY 2012 | $778,293 | 10 | LANDSCAPE DEVELOPMENT |
0912-70-008 | CS | Actual | OCT 2011 | $2,500,000 | 5 | MIDTOWN LIVABLE COMMUNITIES INITIATIVE (PHASE II) |
0912-70-081 | VA | Actual | MAR 2012 | $1,200,453 | 10 | LANDSCAPE DEVELOPMENT |
0912-70-084 | VA | Actual | SEP 2011 | $2,700,000 | 5 | INSTALL 3 NEW INTERSECTIONS |
0912-70-095 | VA | Actual | AUG 2012 | $1,000,000 | 7 | MOTORIST ASSISTANCE PROGRAM OPERATING EXPENSES |
0912-71-002 | CR | Actual | AUG 2012 | $13,744,578 | 3 | INSTALL 3, 900 FEET TRACK & RAIL CROSSING THRU W BELT JCT & |
0912-71-042 | CS | Actual | SEP 2011 | $7,669,961 | 5 | UPTOWN MANAGEMENT PEDESTRIAN IMPROVEMENTS |
0912-71-631 | VA | Actual | AUG 2012 | $5,688,316 | 3 | CONSTRUCT HIKE & BIKE TRAIL - KEEGANS BAYOU TRAIL |
0912-71-701 | CS | Actual | MAR 2012 | $1,411,826 | 3 | HERSHEY PARK PEDESTRIAN AND BICYCLE TIE - IN |
0912-71-794 | CS | Actual | DEC 2011 | $462,463 | 3 | BELLAIRE BOULEVARD BEAUTIFICATION IN SOUTHSIDE PLACE |
0912-71-888 | PW | Actual | SEP 2011 | $3,457,061 | 10 | CONST EMBANKMENT, FLEXIBLE BASE, ACP, STRUCTURES, CULVERTS, |
0912-72-117 | VA | Actual | OCT 2011 | $991,340 | 1 | UPGRADE VIA'S THROUGHOUT CENTRAL HOUSTON |
0912-72-174 | VA | Actual | JUL 2012 | $6,900,000 | 3 | TRANSTAR EMERGENCY OPERATIONS CENTER EXPANSION |
0912-72-180 | VA | Actual | DEC 2011 | $1,464,292 | 1 | FULL DEPTH REPAIR, BRIDGE REPAIR, BARRIER REPAIR, ARMOR |
0912-72-213 | VA | Actual | OCT 2011 | $1,887,400 | 1 | SHOULDER & GORE RECONSTRUCTION, BRIDGE REPAIR, SHEET PILING, |
0912-72-240 | VA | Actual | SEP 2011 | $209,638 | 1 | CRACK SEAL AND SPALL REPAIR |
0912-72-278 | VA | Actual | MAY 2012 | $789,714 | 1 | REPLACE ARMOR JOINTS, REPAIR SPALLED CONSTRUCTION JOINTS AND |
0912-72-287 | VA | Actual | MAY 2012 | $2,475,888 | 10 | ADA CURB RAMP PROGRAM FY 12 (VARIOUS LOCATIONS IN HARRIS |
0912-72-295 | CR | Actual | AUG 2012 | $212,667 | 8 | FY 2012 RR SIGNAL & WARNING DEVICES (UPRR DOT# 743 638B) |
1005-01-041 | FM 525 | Actual | MAY 2012 | $213,761 | 8 | IMPROVE TRAFFIC SIGNAL |
1006-01-066 | FM 529 | Actual | DEC 2011 | $78,208 | 10 | FY 2010 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
1006-01-068 | FM 529 | Actual | AUG 2012 | $1,457,279 | 3 | IMPLEMENTATION OF ACCESS MANAGEMENT |
1062-02-024 | FM 1485 | Actual | JUN 2012 | $987,119 | 1 | INSTALL LEFT TURN LANE (WB - SB) |
1685-01-098 | FM 1960 | Actual | DEC 2011 | $67,200 | 10 | FY 2010 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
1685-03-089 | FM 1960 | Actual | AUG 2012 | $962,619 | 8 | IMPROVE TRAFFIC SIGNAL AND REALIGNING EB AND WB LEFT TURN |
1812-01-019 | FM 1942 | Actual | AUG 2012 | $506,733 | 1 | INSTALL LEFT TURN LANE ON FM 1942 EB TO BOHEMIAN RD NB |
2941-01-022 | FM 2920 | Actual | JUL 2012 | $3,658,494 | 3 | INTERSECTION IMPROVEMENTS |
3050-03-015 | FM 2978 | Actual | MAR 2012 | $848,936 | 1 | CONSTRUCT DETENTION FACILITY |
3256-01-097 | BW 8 | Actual | AUG 2012 | $1,075,234 | 1 | DIAMOND GRINDING & FULL DEPTH CONCRETE REPAIR |
3256-02-040 | BW 8 | Actual | AUG 2012 | $8,671,034 | 3 | WIDEN EXISTING TO 6 MAIN LANES |
3510-05-017 | SH 99 | Actual | JUL 2012 | $31,203,250 | 3 | CONSTRUCT 4 DIRECT CONNECTORS (SEGMENT E) (TOLL) |
8170-12-006 | MH | Actual | OCT 2011 | $11,398,323 | 1 | CONSTRUCT 8 - LANE DIVIDED (RAISED MEDIAN) URBAN STREET |
Montgomery County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0338-03-086 | SH 105 | Actual | JAN 2012 | $2,748,533 | 1 | BASE & ASPHALT REPAIR, OCST AND HOT MIX |
0338-04-079 | SH 105 | Actual | MAY 2012 | $1,230,592 | 1 | INSTALL LEFT TURN LANES |
0523-08-012 | FM 1488 | Actual | MAY 2012 | $36,096 | 10 | FY 2012 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0912-37-185 | CS | Actual | JUL 2012 | $2,237,466 | 6 | REPLACE BRIDGE (NBI# 12170C00212001) |
0912-37-199 | CS | Actual | AUG 2012 | $2,836,771 | 3 | WIDEN TO 6 LANE DIVIDED |
0912-37-205 | CR | Actual | MAY 2012 | $856,575 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12170AA0852001) |
0912-37-225 | CS | Actual | AUG 2012 | $212,667 | 8 | FY 2012 RR SIGNAL & WARNING DEVICES (UPRR DOT# 430 088L) |
1062-03-046 | FM 1485 | Actual | JAN 2012 | $3,754,449 | 1 | BASE REPAIR, 1.5" ACP O / L AND CENTERLINE RUMBLE STRIPS |
1259-01-038 | FM 1097 | Actual | JUN 2012 | $302,236 | 1 | INSTALL LEFT TURN LANES |
1912-01-019 | FM 2090 | Actual | FEB 2012 | $4,948,921 | 1 | BASE REPAIR, OCST & ACP OVERLAY |
3050-02-021 | FM 2978 | Actual | AUG 2012 | $1,065,381 | 1 | WIDEN FROM 2 TO 4 LANES |
3158-01-036 | FM 3083 | Actual | MAY 2012 | $67,200 | 10 | FY 2012 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
Waller County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0409-02-028 | SH 159 | Actual | DEC 2011 | $42,112 | 10 | FY 2010 RAILROAD GRADE CROSSING REPLANKING |
0523-02-043 | FM 362 | Actual | AUG 2012 | $763,185 | 1 | INSTALL LEFT TURN LANES |
0543-01-062 | FM 359 | Actual | DEC 2011 | $60,160 | 10 | FY 2011 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0543-01-063 | FM 359 | Actual | MAY 2012 | $84,224 | 10 | FY 2012 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0912-56-040 | CR | Actual | APR 2012 | $355,823 | 6 | REPLACE BRIDGE AND APPROACHES |
|
|