Detail Letting Schedule for Hidalgo County (FY 2012)
Detail Letting Schedule for Hidalgo County (FY 2012) | ||||
Last Update: Monday, September 24, 2012 |
Hidalgo County (FY 2012) |
CCSJ: 0039-04-095 | |||
District: | Pharr | Let Date: | JUL 2012 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2012(642)MM | CSJ: | 0039-04-095 |
Description: | CONSTRUCT 4 LANE DIVIDED URBAN | Handling Code: |
|
Limits From: | TEXAS AVE (FM 491) IN MERCEDES, E | Fund Cat: | 7 |
Limits To: | CAMERON COUNTY LINE | Estimate: | $12,427,235 |
Length: | 3.2 Miles | Actual: | $14,872,328 |
Bid Tabulations Back... |
Totals for 0039-04-095 | ||
---|---|---|---|
Length: | 3.2 Miles | ||
Estimate: | $12,427,235 | ||
Actual: | $14,872,328 | ||
CCSJ: 0219-01-053 | |||
District: | Pharr | Let Date: | DEC 2011 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | CRX 219-1-53 | CSJ: | 0219-01-053 |
Description: | UPGRADE RAIL ROAD CROSSING PLANKING | Handling Code: |
XX |
Limits From: | RIO VALLEY SWITCHING CO,DOT#448872F | Fund Cat: | 10 |
Limits To: | @ SH 107 IN MISSION | Estimate: | $57,600 |
Length: | 0.0 Miles | Actual: | $57,600 |
Back... |
Totals for 0219-01-053 | ||
Length: | 0.0 Miles | ||
Estimate: | $57,600 | ||
Actual: | $57,600 | ||
CCSJ: 0255-07-128 | |||
District: | Pharr | Let Date: | AUG 2012 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2012(793)MM | CSJ: | 0255-07-128 |
Description: | RECONSTRUCT MAINLANES & ADD FRONTAGE RDS | Handling Code: |
|
Limits From: | FM 162 | Fund Cat: | 3 |
Limits To: | FM 490 | Estimate: | $11,630,984 |
Length: | 2.4 Miles | Actual: | $12,040,791 |
District: | Pharr | Let Date: | AUG 2012 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | C 255-7-129 | CSJ: | 0255-07-129 |
Description: | RECONSTRUCT MAINLANES & ADD FRONTAGE RDS | Handling Code: |
|
Limits From: | FM 2812 | Fund Cat: | 3 |
Limits To: | FM 162 | Estimate: | $7,056,688 |
Length: | 2.2 Miles | Actual: | $7,776,380 |
Award Status Bid Tabulations Back... |
Totals for 0255-07-128 | ||
Length: | 4.6 Miles | ||
Estimate: | $18,687,672 | ||
Actual: | $19,817,171 | ||
CCSJ: 0255-08-096 | |||
District: | Pharr | Let Date: | DEC 2011 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | CRX 255-8-96 | CSJ: | 0255-08-096 |
Description: | UPGRADE RAIL ROAD CROSSING PLANKING | Handling Code: |
XX |
Limits From: | RIO VALLEY SWITCHING CO,DOT#435754R | Fund Cat: | 10 |
Limits To: | @ US 281 IN PHARR | Estimate: | $72,800 |
Length: | 0.0 Miles | Actual: | $72,800 |
Back... |
Totals for 0255-08-096 | ||
Length: | 0.0 Miles | ||
Estimate: | $72,800 | ||
Actual: | $72,800 | ||
CCSJ: 0342-02-051 | |||
District: | Pharr | Let Date: | OCT 2011 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | NH 2012(074) | CSJ: | 0038-07-064 |
Description: | FY 2012 OVERLAY PROGRAM | Handling Code: |
|
Limits From: | FM 649 | Fund Cat: | 1 |
Limits To: | ROMA CITY LIMITS @ RIOS ST | Estimate: | $1,199,337 |
Length: | 4.2 Miles | Actual: | $1,115,352 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | US 77 | Let Status: | Actual |
Project ID: | NH 2012(074) | CSJ: | 0039-07-237 |
Description: | OVERLAY_ (MAIN LANES) | Handling Code: |
|
Limits From: | FM 509 | Fund Cat: | 1 |
Limits To: | FM 2994 | Estimate: | $2,522,585 |
Length: | 5.8 Miles | Actual: | $2,246,529 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | US 77 | Let Status: | Actual |
Project ID: | NH 2012(074) | CSJ: | 0039-08-094 |
Description: | OVERLAY_ (MAIN LANES) | Handling Code: |
|
Limits From: | OLD ALICE RD | Fund Cat: | 1 |
Limits To: | FM 511 | Estimate: | $1,208,013 |
Length: | 2.9 Miles | Actual: | $1,116,059 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | FM 1016 | Let Status: | Actual |
Project ID: | STP 2012(073) | CSJ: | 0219-01-054 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | US 83 | Fund Cat: | 1 |
Limits To: | BRYAN RD | Estimate: | $970,494 |
Length: | 3.4 Miles | Actual: | $882,084 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2012(073) | CSJ: | 0342-01-086 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | FM 3071 | Fund Cat: | 1 |
Limits To: | 0.394 MI E OF FM 88 | Estimate: | $241,013 |
Length: | 0.6 Miles | Actual: | $226,081 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2012(073) | CSJ: | 0342-02-051 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | FM 1015 | Fund Cat: | 1 |
Limits To: | FM 3071 | Estimate: | $642,099 |
Length: | 1.0 Miles | Actual: | $845,588 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2012(073) | CSJ: | 0528-01-102 |
Description: | FY 2012 OVERLAY PROGRAM | Handling Code: |
|
Limits From: | US 83 EXPRESSWAY | Fund Cat: | 1 |
Limits To: | RAILROAD TRACKS @ BUS 83 | Estimate: | $256,846 |
Length: | 0.9 Miles | Actual: | $228,920 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2012(073) | CSJ: | 0528-01-103 |
Description: | FY 2012 OVERLAY PROGRAM | Handling Code: |
|
Limits From: | RAILROAD TRACKS @ BUS 83 | Fund Cat: | 1 |
Limits To: | TOM LANDRY ST | Estimate: | $38,518 |
Length: | 0.1 Miles | Actual: | $34,154 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2012(073) | CSJ: | 0528-01-104 |
Description: | FY 2012 OVERLAY PROGRAM | Handling Code: |
|
Limits From: | TOM LANDRY ST | Fund Cat: | 1 |
Limits To: | W 18TH ST | Estimate: | $187,646 |
Length: | 0.6 Miles | Actual: | $166,904 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2012(073) | CSJ: | 0528-01-105 |
Description: | FY 2012 OVERLAY PROGRAM | Handling Code: |
|
Limits From: | W 18TH ST | Fund Cat: | 1 |
Limits To: | SH 495 | Estimate: | $155,572 |
Length: | 0.4 Miles | Actual: | $137,640 |
Back... |
Totals for 0342-02-051 | ||
Length: | 19.9 Miles | ||
Estimate: | $7,422,123 | ||
Actual: | $6,999,311 | ||
CCSJ: 0528-01-101 | |||
District: | Pharr | Let Date: | DEC 2011 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2012(169) | CSJ: | 0528-01-101 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: |
|
Limits From: | FM 2220 | Fund Cat: | 1 |
Limits To: | 0.303 MI W OF GLASSCOCK RD | Estimate: | $1,736,679 |
Length: | 2.1 Miles | Actual: | $1,932,314 |
Back... |
Totals for 0528-01-101 | ||
Length: | 2.1 Miles | ||
Estimate: | $1,736,679 | ||
Actual: | $1,932,314 | ||
CCSJ: 0862-02-018 | |||
District: | Pharr | Let Date: | JUL 2012 |
Highway: | FM 1427 | Let Status: | Actual |
Project ID: | STP 2012(665) | CSJ: | 0862-02-018 |
Description: | REHABILITATE PAVEMENT & WIDEN TO 40' | Handling Code: |
|
Limits From: | 1.9 MI SOUTH OF US 83 | Fund Cat: | 1 |
Limits To: | 0.03 MI SOUTH BUS 83 | Estimate: | $3,816,945 |
Length: | 4.6 Miles | Actual: | $3,777,778 |
Bid Tabulations Back... |
Totals for 0862-02-018 | ||
Length: | 4.6 Miles | ||
Estimate: | $3,816,945 | ||
Actual: | $3,777,778 | ||
CCSJ: 0863-01-063 | |||
District: | Pharr | Let Date: | MAY 2012 |
Highway: | FM 493 | Let Status: | Actual |
Project ID: | CRX 863-1-63 | CSJ: | 0863-01-063 |
Description: | UPGRADE RAIL ROAD CROSSING PLANKING | Handling Code: |
XX |
Limits From: | RIO VALLEY SWTCH CO, DOT # 435651R | Fund Cat: | 10 |
Limits To: | FM 493 IN DONNA | Estimate: | $80,000 |
Length: | 0.1 Miles | Actual: | $83,200 |
Back... |
Totals for 0863-01-063 | ||
Length: | 0.1 Miles | ||
Estimate: | $80,000 | ||
Actual: | $83,200 | ||
CCSJ: 0864-01-058 | |||
District: | Pharr | Let Date: | DEC 2011 |
Highway: | FM 494 | Let Status: | Actual |
Project ID: | CRX 864-1-58 | CSJ: | 0864-01-058 |
Description: | UPGRADE RRX PLANKING | Handling Code: |
XX |
Limits From: | RIO VALLEY SWITCHING CO,DOT#448859S | Fund Cat: | 10 |
Limits To: | @ FM 494 IN MISSION | Estimate: | $72,800 |
Length: | 0.0 Miles | Actual: | $72,800 |
Back... |
Totals for 0864-01-058 | ||
Length: | 0.0 Miles | ||
Estimate: | $72,800 | ||
Actual: | $72,800 | ||
CCSJ: 0921-02-195 | |||
District: | Pharr | Let Date: | SEP 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2010(827)SRS | CSJ: | 0921-02-195 |
Description: | CONSTRUCT CROSSWALKS AND SIDEWALKS ALONG ROUTES TO SCHOOLS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS WITHIN | Fund Cat: | 3 |
Limits To: | CITY OF HIDALGO | Estimate: | $808,755 |
Length: | 0.1 Miles | Actual: | $762,101 |
Back... |
Totals for 0921-02-195 | ||
Length: | 0.1 Miles | ||
Estimate: | $808,755 | ||
Actual: | $762,101 | ||
CCSJ: 0921-02-204 | |||
District: | Pharr | Let Date: | AUG 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | CBI 2012(581) | CSJ: | 0921-02-204 |
Description: | IMPROVEMENTS @ HIDALGO INTERNATIONAL BRIDGE | Handling Code: |
LC |
Limits From: | AT HIDALGO INTERNATIONAL BRIDGE | Fund Cat: | 3 |
Limits To: | . | Estimate: | $976,818 |
Length: | 0.2 Miles | Actual: | $957,021 |
Back... |
Totals for 0921-02-204 | ||
Length: | 0.2 Miles | ||
Estimate: | $976,818 | ||
Actual: | $957,021 | ||
CCSJ: 0921-02-256 | |||
District: | Pharr | Let Date: | MAY 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2012(540)MM | CSJ: | 0921-02-256 |
Description: | ADD LEFT TURN CENTER LANE | Handling Code: |
|
Limits From: | ON SAM HOUSTON, US 281 | Fund Cat: | 3 |
Limits To: | "I" RD | Estimate: | $2,305,357 |
Length: | 1.0 Miles | Actual: | $2,174,313 |
District: | Pharr | Let Date: | MAY 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | RW 921-2-294 | CSJ: | 0921-02-294 |
Description: | RIGHT OF WAY UTILITY ADJUSTMENTS | Handling Code: |
|
Limits From: | ON SAM HOUSTON, US 281 | Fund Cat: | ROW |
Limits To: | "I" RD | Estimate: | |
Length: | 1.0 Miles | Actual: | $224,576 |
Back... |
Totals for 0921-02-256 | ||
Length: | 2.0 Miles | ||
Estimate: | $2,305,357 | ||
Actual: | $2,398,889 | ||
CCSJ: 0921-02-283 | |||
District: | Pharr | Let Date: | AUG 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2011(243)TE | CSJ: | 0921-02-283 |
Description: | BICENTENNIAL HIKE & BIKE TRAIL CORRIDOR BEAUTIFICATION | Handling Code: |
LC |
Limits From: | BICENTENNIAL BOULEVARD | Fund Cat: | 3 |
Limits To: | NOLANA AVE TO .4 MI N OF TRENTON | Estimate: | $1,234,469 |
Length: | 2.6 Miles | Actual: | $1,120,000 |
Back... |
Totals for 0921-02-283 | ||
Length: | 2.6 Miles | ||
Estimate: | $1,234,469 | ||
Actual: | $1,120,000 | ||
CCSJ: 1429-02-035 | |||
District: | Pharr | Let Date: | DEC 2011 |
Highway: | FM 1426 | Let Status: | Actual |
Project ID: | CRX 1492-2-35 | CSJ: | 1429-02-035 |
Description: | UPGRADE RAIL ROAD CROSSING PLANKS | Handling Code: |
XX |
Limits From: | RIO VALLEY SWTCHNG CO, DOT #435690G | Fund Cat: | 10 |
Limits To: | @ FM 1426 IN SAN JUAN | Estimate: | $76,800 |
Length: | 0.0 Miles | Actual: | $76,800 |
Back... |
Totals for 1429-02-035 | ||
Length: | 0.0 Miles | ||
Estimate: | $76,800 | ||
Actual: | $76,800 | ||
CCSJ: 1586-01-066 | |||
District: | Pharr | Let Date: | DEC 2011 |
Highway: | FM 907 | Let Status: | Actual |
Project ID: | CRX 1586-1-66 | CSJ: | 1586-01-066 |
Description: | UPGRADE RAIL ROAD CROSSING PLANKING | Handling Code: |
XX |
Limits From: | RIO VALLEY SWTCH CO,DOT #435885K | Fund Cat: | 10 |
Limits To: | FM 907 IN ALAMO | Estimate: | $76,800 |
Length: | 0.0 Miles | Actual: | $76,800 |
Back... |
Totals for 1586-01-066 | ||
Length: | 0.0 Miles | ||
Estimate: | $76,800 | ||
Actual: | $76,800 | ||
CCSJ: 1804-02-023 | |||
District: | Pharr | Let Date: | AUG 2012 |
Highway: | FM 1926 | Let Status: | Actual |
Project ID: | STP 2012(700)MM | CSJ: | 1804-02-023 |
Description: | CONST RIGHT TURN LANES (NB & WB) | Handling Code: |
|
Limits From: | INTERSECTION OF DOVE & 23RD ST | Fund Cat: | 3 |
Limits To: | . | Estimate: | $220,665 |
Length: | 0.1 Miles | Actual: | $188,300 |
Award Status Bid Tabulations Back... |
Totals for 1804-02-023 | ||
Length: | 0.1 Miles | ||
Estimate: | $220,665 | ||
Actual: | $188,300 | ||
CCSJ: 1941-01-010 | |||
District: | Pharr | Let Date: | OCT 2011 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 0220-01-032 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | SP 600 | Fund Cat: | 1 |
Limits To: | 0.5 MI W OF FM 2557 | Estimate: | $82,834 |
Length: | 1.5 Miles | Actual: | $78,788 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | NH 2012(076) | CSJ: | 0255-07-125 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | BUS 281 (NORTH) | Fund Cat: | 1 |
Limits To: | FM 162 | Estimate: | $373,275 |
Length: | 5.7 Miles | Actual: | $351,337 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | NH 2012(076) | CSJ: | 0255-08-098 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | SH 495 | Fund Cat: | 1 |
Limits To: | SH 107 | Estimate: | $518,168 |
Length: | 6.6 Miles | Actual: | $490,387 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | SH 186 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 0433-01-029 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | US 281 | Fund Cat: | 1 |
Limits To: | 0.553 MI E OF FM 493 | Estimate: | $398,371 |
Length: | 9.4 Miles | Actual: | $384,091 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | FM 88 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 0698-02-048 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | FM 1925 | Fund Cat: | 1 |
Limits To: | SH 107 | Estimate: | $60,795 |
Length: | 1.5 Miles | Actual: | $58,440 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | FM 493 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 0863-01-059 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | MILE 10 (NORTH) | Fund Cat: | 1 |
Limits To: | MILE 14 (NORTH) | Estimate: | $156,860 |
Length: | 3.7 Miles | Actual: | $148,583 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | FM 493 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 0863-01-060 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | MILE 14 | Fund Cat: | 1 |
Limits To: | SH 107 | Estimate: | $70,611 |
Length: | 2.5 Miles | Actual: | $67,002 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | FM 493 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 0863-03-030 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | SH 107 | Fund Cat: | 1 |
Limits To: | FM 2812 | Estimate: | $166,213 |
Length: | 5.5 Miles | Actual: | $158,467 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | FM 1423 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 1427-01-023 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | BUS 83 | Fund Cat: | 1 |
Limits To: | END OF STATE MAINTENANCE | Estimate: | $26,864 |
Length: | 1.4 Miles | Actual: | $25,905 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | FM 907 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 1586-01-064 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | SH 107 | Fund Cat: | 1 |
Limits To: | FM 1925 | Estimate: | $136,683 |
Length: | 2.5 Miles | Actual: | $130,591 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | FM 1925 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 1803-03-008 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | FM 1015 | Fund Cat: | 1 |
Limits To: | FM 491 | Estimate: | $73,781 |
Length: | 1.8 Miles | Actual: | $71,140 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | FM 2062 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 1941-01-010 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | 1 MI S OF BUS 83 | Fund Cat: | 1 |
Limits To: | END OF STATE MAINTENANCE | Estimate: | $223,658 |
Length: | 2.6 Miles | Actual: | $212,950 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | FM 2220 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 2094-01-049 |
Description: | FY 2012 SEAL COAT | Handling Code: |
|
Limits From: | FM 1016 | Fund Cat: | 1 |
Limits To: | US 83 | Estimate: | $216,985 |
Length: | 3.0 Miles | Actual: | $205,937 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | FM 2220 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 2094-01-050 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | SH 107 | Fund Cat: | 1 |
Limits To: | FM 1925 | Estimate: | $114,558 |
Length: | 2.5 Miles | Actual: | $110,640 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | FM 2521 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 2416-01-006 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | US 83 | Fund Cat: | 1 |
Limits To: | OLD MILITARY | Estimate: | $57,897 |
Length: | 1.1 Miles | Actual: | $54,794 |
District: | Pharr | Let Date: | OCT 2011 |
Highway: | FM 3072 | Let Status: | Actual |
Project ID: | STP 2012(075) | CSJ: | 3098-01-013 |
Description: | FY 2012 SEAL COAT PROGRAM | Handling Code: |
|
Limits From: | FM 907 | Fund Cat: | 1 |
Limits To: | "I" RD | Estimate: | $114,324 |
Length: | 2.8 Miles | Actual: | $110,175 |
Back... |
Totals for 1941-01-010 | ||
Length: | 54.1 Miles | ||
Estimate: | $2,791,877 | ||
Actual: | $2,659,227 | ||
CCSJ: 2094-01-046 | |||
District: | Pharr | Let Date: | DEC 2011 |
Highway: | FM 2220 | Let Status: | Actual |
Project ID: | CRX 2094-1-46 | CSJ: | 2094-01-046 |
Description: | UPGRADE RAIL ROAD PLANKING | Handling Code: |
XX |
Limits From: | RIO VALLEY SWITCHING CO,DOT#448852U | Fund Cat: | 10 |
Limits To: | @ FM 2220 IN MCALLEN | Estimate: | $88,400 |
Length: | 0.0 Miles | Actual: | $88,400 |
Back... |
Totals for 2094-01-046 | ||
Length: | 0.0 Miles | ||
Estimate: | $88,400 | ||
Actual: | $88,400 | ||
CCSJ: 2966-01-011 | |||
District: | Pharr | Let Date: | SEP 2011 |
Highway: | SH 364 | Let Status: | Actual |
Project ID: | STP 2012(043) | CSJ: | 2966-01-011 |
Description: | CONSTRUCT 4 LANE DIVIDED URBAN | Handling Code: |
|
Limits From: | FM 1924 NORTH | Fund Cat: | 11 |
Limits To: | FM 676 | Estimate: | $4,545,637 |
Length: | 2.0 Miles | Actual: | $5,446,345 |
Back... |
Totals for 2966-01-011 | ||
Length: | 2.0 Miles | ||
Estimate: | $4,545,637 | ||
Actual: | $5,446,345 | ||
CCSJ: 3468-01-015 | |||
District: | Pharr | Let Date: | DEC 2011 |
Highway: | FM 3362 | Let Status: | Actual |
Project ID: | CRX 3468-1-15 | CSJ: | 3468-01-015 |
Description: | UPGRADE RAIL ROAD CROSSING PLANKING | Handling Code: |
XX |
Limits From: | RIO VALLEY SWITCHING CO,DOT#435773V | Fund Cat: | 10 |
Limits To: | @ FM 3362 IN PHARR | Estimate: | $67,600 |
Length: | 0.0 Miles | Actual: | $67,600 |
Back... |
Totals for 3468-01-015 | ||
Length: | 0.0 Miles | ||
Estimate: | $67,600 | ||
Actual: | $67,600 |
|
|