Last Update: Monday, February 2, 2009
Fort Worth District (FY 2008)
Denton | Erath | Hood | Jack | Johnson | Palo Pinto | Parker | Tarrant | Wise

Denton County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0718-01-047 FM 156 Actual NOV 2007 $10,449,000 10 RELOCATE EXISTING 2 LANE ROADWAY ON NEW LOCATION (STAGE I)

Erath County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0079-05-050 US 67 Actual JUL 2008 $6,340,613 1 MILL 2" AND HMAC OVERLAY
0080-02-052 US 377 Actual MAR 2008 $1,802,914 6 REPLACE BRIDGE AND APPROACHES
0902-49-048 CS Actual JUL 2008 $682,737 11 CONSTRUCT NEW ROADWAY TO CONNECT; RR CROSSING
0902-49-057 CR Actual DEC 2007 $163,558 6 REPLACE BRIDGE AND APPROACHES
0902-49-064 CS Actual JUN 2008 $400,000 8 2008 RAILROAD CROSSING SIGNAL PROGRAM

Hood County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0313-08-025 FM 51 Actual MAY 2008 $196,896 1 ADD LEFT TURN LANE
0385-02-023 FM 4 Actual SEP 2007 $1,202,601 6 REPLACE BRIDGE AND APPROACHES

Jack County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0134-04-032 US 380 Actual JUL 2008 $1,765,441 1 MICROSURFACE AND PAVEMENT MARKINGS
0134-04-033 US 380 Actual JUL 2008 $2,735,268 1 MILL 2" AND HMAC OVERLAY

Johnson County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0019-01-131 SH 174 Actual DEC 2007 $70,940 1 INSTALLATION OF SCHOOL ZONE FLASHERS
0019-01-133 SH 174 Actual AUG 2008 $57,803 10 INSTALLATION OF FULL TRAFFIC ACTUATED TRAFFIC SIGNAL
0365-03-038 SH 171 Actual AUG 2008 $287,214 10 INSTALLATION OF FULL TRAFFIC ACTUATED TRAFFIC SIGNAL
0365-03-039 SH 171 Actual JUL 2008 $525,564 10 CONSTRUCTION OF A LEFT TURN LANE AND INSTALLATION OF A FULL
1181-04-036 FM 917 Actual APR 2008   11 ACQUISITION
2213-01-012 FM 2331 Actual JUL 2008 $7,000,189 1 ROAD MIX EXISTING BASE, HMAC OVERLAY AND PAVEMENT MARKINGS
3372-01-012 FM 3391 Actual JUL 2008 $2,029,711 1 CEMENT TREAT BASE, HMAC OVERLAY AND PAVEMENT MARKINGS

Palo Pinto County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0008-01-044 US 180 Actual AUG 2008 $1,854,816 1 PLANE 2", FABRIC UNDERSEAL, 2" HMAC OVERLAY WITH PAVEMENT
0314-06-032 FM 4 Actual MAR 2008 $778,338 1 REPLACE BRIDGE AND APPROACHES
1334-01-015 FM 1195 Actual JUN 2008 $2,631,223 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
2735-01-012 FM 2256 Actual JUN 2008 $3,072,267 1 SAFETY TREAT FIXED OBJECTS; WIDEN LANES & CONSTRUCT PAVED

Parker County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0008-02-068 US 180 Actual JAN 2008 $80,000 1 INSTALLATION OF A FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL
0008-03-093 IH 20 Actual AUG 2008 $885,893 1 INSTALL_TRAFFIC SIGNAL AT INTERSECTION AND WIDEN PAVEMENT
0314-01-075 IH 20 Actual JAN 2008 $89,000 1 ABATEMENT OF ASBESTOS IN THE PAINT FOR REHABILITATION
0539-05-013 FM 1885 Actual AUG 2008 $1,060,968 6 REPLACE BRIDGE AND APPROACHES
0614-01-004 PR 71 Actual AUG 2008 $2,580,808 10 RECONSTRUCT PARK ROAD
0649-02-028 FM 1885 Actual MAY 2008 $999,247 1 REPLACE BRIDGE
0649-02-030 FM 1885 Actual MAY 2008 $3,355,562 1 HMAC OVERLAY
0717-01-021 FM 113 Actual AUG 2008 $2,584,841 1 REPAIR PAVEMENT, LEVEL - UP, FABRIC UNDERSEAL, AND 2" HMAC

Tarrant County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0013-10-073 BU 287P Actual SEP 2007 $5,073,895 1 MILL, REHABILITATE SHOULDERS AND OVERLAY OF 2"
0080-07-084 US 377 Actual SEP 2007 $372,458 8 INSTALL WIRE ROPE MEDIAN BARRIER
0094-05-062 SH 183 Actual MAY 2008 $4,535,779 8 MILL, HMAC OVERLAY, PAVEMENT AND CURB AND GUTTER REPAIR AND
0172-01-042 BU 287P Actual AUG 2008 $17,185,956 2 WIDEN FOUR LANES TO SIX LANE DIVIDED & REPLACE RR UNDERPASS
0172-01-048 BU 287P Actual SEP 2007 $978,609 1 DRAINAGE IMPROVEMENTS CONSISTING LATERALS, PIPE AND INLETS
0172-01-049 BU 287P Actual JUL 2008 $8,328,542 1 MILL, BASE REPAIR AND 2" HMAC OVERLAY AND PAVEMENT MARKINGS
0172-06-068 US 287 Actual FEB 2008 $2,898,949 1 REHABILITATE BRIDGE
0172-09-030 US 287 Actual MAY 2008 $1,700 10 REVIEW OF PLANS AND CONSTRUCTION INSPECTION OF CRASH WALL
0353-03-086 SH 114 Actual APR 2008 $629,921 8 INSTALL MEDIAN BARRIER
0353-07-026 BS 114L Actual MAY 2008 $267,030 10 LANDSCAPE MATERIALS PURCHASE THROUGH WAREHOUSE WITH THE CITY
0364-01-131 SH 121 Actual DEC 2007 $62,600 1 INSTALLATION OF FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL
0718-02-048 FM 156 Actual AUG 2008 $9,132,066 10 RELOCATED EXISTING 2 LANE ROADWAY ON NEW LOCATION (STAGE 1)
0718-02-061 FM 156 Actual MAY 2008 $1,323,667 1 REPAIR PAVEMENT AND HMAC OVERLAY
0902-00-105 VA Actual NOV 2007 $10,698,865 1 CRACK SEAL, FULL DEPTH CONCRETE REPAIR, STRIPING, MARKERS,
0902-48-499 VA Actual DEC 2007 $1,130,580 7 TRAVEL DEMAND MANAGEMENT WITH ADVANCED TRAVELER INFORMATION
0902-48-627 VA Actual JAN 2008 $1,447,784 1 GUIDE SIGN REPLACEMENT, REMOVAL AND INSTALLATION ON SH 121
0902-48-628 VA Actual DEC 2007 $2,565,335 1 GUIDE SIGN REPLACEMENT, REMOVAL AND INSTALLATION ON IH 30
0902-48-660 VA Actual SEP 2007 $356,086 1 REHABILITATION / REPLACEMENT OF DYNAMIC MESSAGE SIGNS AND
0902-48-661 VA Actual JUN 2008 $153,987 5 LAND USE / JOINT VENTURE WITH NORTH RICHLAND HILLS PHASE I
0902-48-684 VA Actual SEP 2007 $1,000,000 5 INTERSECTION IMPROVEMENTS
0902-48-713 VA Actual SEP 2007 $1,765,699 5 SIMULATION OF LIGHT RAIL TRANSIT USING BUS TECHNOLOGY,
0902-48-714 VA Actual SEP 2007 $10,000,000 5 REGIONAL RAIL PROJECTS TO ADVANCE COMMUTER RAIL
0902-48-715 VA Actual SEP 2007 $1,358,549 7 VANPOOL PROGRAM
0902-48-720 VA Actual APR 2008 $680,604 5 M & O TO REPLACE AND / OR RETROFIT OLDER SCHOOL BUS
0902-48-729 VA Actual AUG 2008 $6,010,282 5 ADD SECOND TRACK SOUTH SIDE OF EXISTING; UPGRADE THE CLASS 1
1978-01-047 FM 1938 Actual MAY 2008 $2,659,188 1 FLEXIBLE PAVEMENT REPAIR, EDGE MILLING, HMAC OVERLAY AND
2079-01-038 FM 1220 Actual JUN 2008 $2,765,797 1 PAVEMENT REPAIR, EDGE MILL AND 2" OVERLAY WITH INSTALLATION
2208-01-051 SP 303 Actual MAR 2008 $2,559,397 6 REHABILITATE AND WIDEN BRIDGES
2266-02-127 SH 360 Actual FEB 2008 $55,975,101 6 RECONSTRUCT FREEWAY INTERCHANGE WITH SH 180 INCLUDING
2266-02-132 SH 360 Actual JUL 2008 $1,319,281 1 RETAINING WALL REPAIR ON NORTHBOUND SIDE

Wise County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0134-08-041 US 380 Actual JUL 2008 $4,457,153 1 OVERLAY EXISTING AND LAY NEW PAVEMENT MARKINGS
1751-01-021 FM 1655 Actual JUL 2008 $741,525 8 CONSTRUCT PAVED SHOULDERS
2738-01-014 FM 2265 Actual MAY 2008 $227,322 1 REPLACE EXISTING CULVERT WITH NEW CULVERT


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract
 