Dallas District (FY 2008)
Collin | Dallas | Denton | Ellis | Kaufman | Navarro

Collin County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0047-06-132 US 75 Actual JUN 2008 $1,559,000 7 REVERSE SB EXIT AND ENTERANCE RAMPS
0047-06-134 US 75 Actual APR 2008 $20,172,429 10 RECONSTRUCT INTERCHANGE AS SINGLE POINT URBAN INTERCHANGE
0047-06-140 US 75 Actual AUG 2008 $1,869,779 10 REVERSE NB EXIT AND ENTRANCE RAMPS
0047-14-063 US 75 Actual FEB 2008 $25,662,948 7 RECONSTRUCT INTERCHANGE
0387-05-016 FM 982 Actual JAN 2008 $7,173,041 1 RECONSTRUCT RURAL 2 LANE HIGHWAY TO 2 LANE RURAL WITH
0549-03-020 SH 121 Actual MAR 2008 $410,184 10 CONSTRUCT NB AND SB TURN LANES
0918-24-118 VA Actual JUN 2008 $654,981 5 INTERSECTION IMPROVEMENTS
0918-24-142 VA Actual AUG 2008 $405,410 7 FRISCO SQUARE LU / JV PHASE 2: FRISCO SQUARE BLVD AT BNSF
1012-02-029 FM 545 Actual SEP 2007 $2,804,673 1 SEALCOAT
1012-03-013 FM 981 Actual MAR 2008 $1,084,982 6 REPLACE BRIDGE AND APPROACHES
2056-01-044 FM 2551 Actual MAY 2008 $978,394 1 BASE REPAIR AND LEVEL UP

Dallas County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-11-210 IH 30 Actual AUG 2008 179,976,985 2 CONSTRUCT INTERCHANGE WITH TOLLWAY_ (TOLL) _ (SECTION 32)
0009-11-216 IH 30 Actual MAR 2008 $537,964 1 GUIDE SIGN REFURBISHING
0092-07-052 SH 356 Actual NOV 2007 $186,675 5 INTERSECTION IMPROVEMENTS;TRAFFIC SIGNAL & GEOMETRIC CHANGES
0095-10-034 US 80 Actual AUG 2008 $15,941,431 10 REPLACE BRIDGE AND APPROACHES
0196-03-251 IH 35E Actual AUG 2008 $209,000 1 RE - WIRE EXISTING CIRCUIT & RELOCATE ILLUMINATION ASSEMBLIES
0196-07-018 SP 366 Actual JUN 2008 $47,458,274 10 EXTENSION OVER TRINITY AS 6 LANES WITH RAMPS TO INDUSTRIAL &
0261-03-056 US 67 Actual MAR 2008 $975,346 1 CLEANING AND PAINTING OF SB FRTG RD AT FIVE MILE CREEK
0353-04-084 SH 114 Actual AUG 2008 $2,710,250 7 ADD U - TURN EB SH 114 TO WB SH 114
0353-05-084 LP 12 Actual AUG 2008 $31,480,361 2 RECONSTRUCT AND RAISE SIX LANE ROADWAY IN WHITE ROCK CREEK
0442-02-143 IH 35E Actual APR 2008 $1,774,363 5 INSTALLATION OF INCIDENT, DETECTION, AND RESPONSE SYSTEM
0581-02-118 LP 12 Actual APR 2008 $324,106 10 REHABILITATE BRIDGE
0918-00-127 VA Actual JUN 2008 $1,145,000 1 NON SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION
0918-00-131 VA Actual MAR 2008 $8,000,000 5 MOBILITY ASSISTANCE PATROL
0918-00-137 VA Actual DEC 2007 $642,425 1 ASBESTOS ABATEMENT ON BRIDGES IN ADVANCE OF OTHER
0918-00-139 VA Actual JUN 2008 $328,000 1 INSTALL UNINTERRUPTED POWER SUPPLY AT VARIOUS SIGNALIZED
0918-00-143 VA Actual MAY 2008 $1,699,999 7 NCTCOG - HIGH EMITTING VEHICLE PROGRAM
0918-00-147 VA Actual AUG 2008 $400,000 7 NCTCOG REGIONAL ITS DATA ARCHIVING
0918-00-148 VA Actual AUG 2008 $503,636 5 REGIONAL FREEWAY INCIDENT MANAGEMENT TRAINING
0918-45-275 CS Actual AUG 2008 $10,393,453 7 WIDEN 4 - LANE FACILITY TO 6 - LANE FACILITY
0918-45-322 CS Actual APR 2008 $2,512,373 5 3 INTERSECTION IMPROVEMENTS
0918-45-369 CS Actual DEC 2007 $2,116,402 7 WIDEN 4 - LANE FACILITY TO 6 - LANE FACILITY
0918-45-689 VA Actual DEC 2007 $738,225 5 SPREAD SYSTEM RADIO SYSTEM UPGRADE
0918-45-796 VA Actual NOV 2007 $589,398 7 KATY TRAIL EXTENION PHASE 5
0918-45-803 CS Actual JUN 2008 $176,872 8 INSTALL TRAFFIC SIGNAL AND ADD LEFT TURN LANES
0918-45-819 VA Actual NOV 2007 $497,100 5 ITS COMMUNICATIONS UPGRADE; INSTALL FIBER OPTICS TO COMMUN
0918-45-827 VA Actual JUL 2008 $1,106,483 1 REFLECTORIZED PAVEMENT MARKINGS
1047-02-045 FM 1382 Actual JAN 2008 $1,091,383 1 MILL, INLAY AND ADA RAMPS
1047-03-061 FM 1382 Actual DEC 2007 $1,730,444 1 MILL, LEVEL - UP, OVERLAY AND ADA RAMPS
1068-04-144 IH 30 Actual AUG 2008 $2,588,040 1 RETAINING WALL REPLACEMENT AND SOUNDWALL MODIFICATION
2374-02-128 IH 635 Actual FEB 2008 $15,926 10 LANDSCAPE DEVELOPMENT
2374-07-048 IH 635 Actual JAN 2008 $459,793 10 CONSTRUCT 2 LANE EB FRONTAGE ROAD
2964-01-031 SH 161 Actual MAR 2008 215,740,714 10 CONSTRUCT 6 LANE FRONTAGE ROAD SEGMENTS AND MAINLANES OVER

Denton County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0081-05-037 FM 428 Actual APR 2008 $1,786,704 1 ACP OVERLAY
0081-13-046 IH 35W Actual JUN 2008 $1,734,110 5 INSTALLATION OF INCIDENT DETECTION AND RESPONSE SYSTEM
0135-10-048 US 377 Actual JUN 2008 $1,624,317 1 FULL DEPTH CONCRETE REPAIR
0196-02-116 IH 35E Actual JUL 2008 $314,872 1 REHABILITATION OF AN EXISTING ROAD
0353-02-070 SH 114 Actual SEP 2007 $631,070 1 INTERSECTION IMPROVEMENTS AND TRAFFIC SIGNALS
0918-46-055 CR Actual MAY 2008 $1,349,101 6 REPLACE EXISTING BRIDGE AND APPROACHES (NEW STEEL TRUSS)
0918-46-064 CR Actual FEB 2008 $444,201 6 REPLACE BRIDGE AND APPROACHES
0918-46-130 VA Actual FEB 2008 $170,100 9 LANDSCAPING AND IRRIGATION OF MORRIS ROAD MEDIAN FOR APPROX
0918-46-142 VA Actual DEC 2007 $1,387,295 9 10 FT. WIDE CONCRETE PEDESTRIAN TRAIL
0918-46-181 VA Actual SEP 2007 $780,680 5 CONSTRUCT 200 SPACE PARK - N - RIDE FACILITY
0918-46-211 CR Actual JUN 2008 $493,379 6 REPLACE BRIDGE AND APPROACHES
0918-46-222 VA Actual AUG 2008 $2,393,117 1 BASE REPAIR
1311-01-031 FM 1171 Actual NOV 2007 $25,393,707 2 WIDEN TWO LANE RURAL TO SIX LANE DIVIDED URBAN HIGHWAY
2681-01-009 FM 2499 Actual NOV 2007 $45,831,630 2 CONSTRUCT 4 - LANE DIVIDED URBAN SECTION
2980-01-008 FM 2934 Actual FEB 2008 $21,211,560 10 WIDEN EXISTING 2 LANE RURAL TO 6 LANE DIVIDED URBAN HIGHWAY

Ellis County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0596-04-039 FM 878 Actual MAR 2008 $1,019,000 6 REPLACE BRIDGE AND APPROACHES
0918-22-085 CS Actual SEP 2007 $1,695,000 7 REALIGN RED OAK RD
1160-02-015 FM 1446 Actual MAY 2008 $3,986,485 8 ADD 3 FOOT PAVED SHOULDERS

Kaufman County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0173-03-033 SH 34 Actual JUN 2008 $3,155,257 1 REHABILITATE EXISTING ROADWAY
0197-04-067 US 175 Actual NOV 2007 $1,580,860 1 ADD ACCELERATION / DECELERATION LANE AND WIDEN STRUCTURE
0197-04-075 US 175 Actual SEP 2007 $8,970,611 1 SEALCOAT
0443-02-013 SH 198 Actual DEC 2007 $6,970,336 1 RECONSTRUCT TO 4 LANE UNDIVIDED URBAN
0495-01-054 IH 20 Actual AUG 2008 $177,091 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING AND
0918-11-063 CR Actual APR 2008 $760,656 6 REPLACE BRIDGE AND APPROACHES
1091-01-017 FM 740 Actual FEB 2008 $342,185 1 CONSTRUCT RIGHT TURN LANE AND SIGNAL UPGRADES
1397-01-023 FM 1836 Actual MAR 2008 $2,137,532 1 REPLACE BRIDGE AND APPROACHES

Navarro County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0093-01-081 IH 45 Actual JUL 2008 $3,177,500 10 CONSTRUCTION OF SB FRONTAGE RDS
0162-04-049 SH 31 Actual SEP 2007 $3,134,390 1 FULL DEPTH REPAIR OF CONCRETE PAVEMENT AND TRAFFIC SIGNALS
0162-09-034 FM 709 Actual SEP 2007 $515,000 6 REPLACE BRIDGE AND APPROACHES
1724-01-015 FM 1126 Actual MAR 2008 $6,256,370 1 OVERLAY - ASPHALTIC CONCRETE PAVEMENT OVERLAY


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract
 