Detail Letting Schedule for Brazoria County (FY 2008)

 
 
Last Update: Monday, February 2, 2009
Brazoria County (FY 2008)

CCSJ: 0587-01-057

District: Houston Let Date: DEC 2007
Highway: FM 1495 Let Status: Actual
Project ID: STP 2008(225) CSJ: 0587-01-057
Description: MILL, ONE - COURSE SURFACE TREATMENT, ASPHALT OVERLAY AND Handling
Code:
 
Limits From: SH 36 Fund Cat: 1
Limits To: PROTECTION LEVEE Estimate: $480,556
Length: 0.7 Miles Actual: $466,099
 
Back...

Totals for 0587-01-057
Length: 0.7 Miles
Estimate: $480,556
Actual: $466,099

CCSJ: 0598-02-042

District: Houston Let Date: AUG 2008
Highway: SH 288 Let Status: Actual
Project ID: C 598-2-42 CSJ: 0598-02-042
Description: NB AND SB FRONTAGE ROADS AND BRIDGES OVER HICKORY SLOUGH Handling
Code:
 
Limits From: FM 2234 (MCHARD ROAD) Fund Cat: 11
Limits To: FM 518 Estimate: $10,291,000
Length: 1.7 Miles Actual: $9,343,968
 
Back...

Totals for 0598-02-042
Length: 1.7 Miles
Estimate: $10,291,000
Actual: $9,343,968

CCSJ: 0598-03-023

District: Houston Let Date: NOV 2007
Highway: SH 288 Let Status: Actual
Project ID: C 598-3-23 CSJ: 0598-03-023
Description: LANDSCAPE DEVELOPMENT Handling
Code:
 
Limits From: S, OF C.R. 44 Fund Cat: 10
Limits To: S. OF SH 35 Estimate: $199,349
Length: 2.4 Miles Actual: $248,723
 
District: Houston Let Date: NOV 2007
Highway: SH 288 Let Status: Actual
Project ID: C 598-4-24 CSJ: 0598-04-024
Description: LANDSCAPE DEVELOPMENT Handling
Code:
 
Limits From: S. OF SH 35 Fund Cat: 10
Limits To: S. OF C.R. 290 Estimate: $110,617
Length: 0.4 Miles Actual: $119,005
 
Back...

Totals for 0598-03-023
Length: 2.8 Miles
Estimate: $309,966
Actual: $367,728

CCSJ: 0912-31-137

District: Houston Let Date: SEP 2007
Highway: VA Let Status: Actual
Project ID: STP 2002(144)TE CSJ: 0912-31-137
Description: BEAUTIFICATION Handling
Code:
NC
Limits From: NORTH OF DOW BARGE CANAL BRIDGE Fund Cat: 9
Limits To: 2ND STREET IN FREEPORT Estimate: $1,099,684
Length: 2.0 Miles Actual: $1,149,986
 
Back...

Totals for 0912-31-137
Length: 2.0 Miles
Estimate: $1,099,684
Actual: $1,149,986

CCSJ: 1004-01-049

District: Houston Let Date: JUN 2008
Highway: FM 524 Let Status: Actual
Project ID: C 1004-1-49 CSJ: 1004-01-049
Description: PE FOR HYDRAULIC STUDY Handling
Code:
XX
Limits From: FM 521 Fund Cat: 1
Limits To: SWEENY Estimate: $100,000
Length: 0.0 Miles Actual: $70,099
 
Back...

Totals for 1004-01-049
Length: 0.0 Miles
Estimate: $100,000
Actual: $70,099


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract