COUNTY: UVALDE HIGHWAY: SH0055 LENGTH: 0.01MI CONTROL NUMBER: 6411-75-001 SBE GOAL: 0.0 % PROJECT NUMBER: BPM - 641175001 TYPE: EROSION REPAIR TIME FOR COMPLETION: 16 WORKING DAYSGUARANTY: 2,000.00 BIDS RECEIVED UNTIL: 1:30 PM DECEMBER 14, 2022 EST.COST: 111,697.08 BIDS WILL BE OPENED: 1:30 PM DECEMBER 14, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONHENRY FOJTIK SAN ANTONIO DISTRICT4615 NW LOOP 410 ATTN: MAINTENANCE CONTRACT OFFICESAN ANTONIO, TX 78229 4615 NW LOOP 410210/615-5939 SAN ANTONIO, TX 782290-000 210/615-5801 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SH 55 LIMITS TO: AT PANTHER CREEK ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 110 6002EXCAVATION (CHANNEL)CY 10.0001 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 10.0002 161 6017COMPOST MANUF TOPSOIL (4")SY 250.0003 164 6003BROADCAST SEED (PERM) (RURAL) (CLAY)SY 250.0004 169 6003SOIL RETENTION BLANKETS (CL 1) (TY C)SY 250.0005 401 6001FLOWABLE BACKFILLCY 10.0006 432 6022RIPRAP (STONE COMMON)(DRY)(6 IN)CY 35.0007 459 6007GABION MATTRESSES (GALV)(12 IN)SY 343.0008 459 6009GABIONS (3' X 3')(GALV)CY 29.0009 459 6011GABIONS (5'X 3')(GALV)CY 38.00010 500 6001MOBILIZATIONLS 1.00011 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 1.00012 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 112.00013 506 6024CONSTRUCTION EXITS (REMOVE)SY 112.00014 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 80.00015 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 80.00016 752 6015TREE AND BRUSH REMOVALAC 0.10017 61856002TMA (STATIONARY)DAY 16.00018