COUNTY: HIDALGO HIGHWAY: FM1426 LENGTH: 0.01MI CONTROL NUMBER: 6316-43-001 SBE GOAL: 0.0 % PROJECT NUMBER: RMC - 631643001 TYPE: SEAL COAT TIME FOR COMPLETION: 60 WORKING DAYSGUARANTY: 42,000.00 BIDS RECEIVED UNTIL: 1:00 PM SEPTEMBER 07, 2017*EST.COST: 2,163,744.02 BIDS WILL BE OPENED: 1:00 PM SEPTEMBER 07, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONREX COSTLEY ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 600 W INTERSTATE 2 200 E RIVERSIDEPHARR, TX 785770000 AUSTIN TX 78704-1204956/702-6137 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: DISTRICT WIDE LIMITS TO: DISTRICT WIDE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 315 6010FOG SEAL (HRSS)GAL 3,738.0001 316 6277ASPH (SPG 73-19)GAL 312,826.0002 316 6462AGGR (TY-PD GR-4P)(SAC-B)CY 8,520.0003 316 6508ASPH (SPG 79-13)GAL 14,361.0004 500 6001MOBILIZATIONLS 1.0005 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 3.0006 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 6,245.0007 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 6,245.0008 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 13,166.0009 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 89,174.00010 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 9,798.00011 666 6042REFL PAV MRK TY I (W)12"(SLD)(100MIL)LF 8,338.00012 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 3,749.00013 666 6147REFL PAV MRK TY I (Y)24"(SLD)(100MIL)LF 1,047.00014 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 46,740.00015 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 303,271.00016 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 55,300.00017 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 218,127.00018 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 137.00019 668 6078PREFAB PAV MRK TY C (W) (DBL ARROW)EA 6.00020 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 73.00021 668 6089PREFAB PAV MRK TY C (W) (RR XING)EA 7.00022 672 6007REFL PAV MRKR TY I-CEA 2,368.00023 672 6009REFL PAV MRKR TY II-A-AEA 42,020.00024 672 6010REFL PAV MRKR TY II-C-REA 214.00025 677 6003ELIM EXT PAV MRK & MRKS (8")LF 9,798.00026 677 6005ELIM EXT PAV MRK & MRKS (12")LF 8,338.00027 677 6007ELIM EXT PAV MRK & MRKS (24")LF 4,158.00028 677 6008ELIM EXT PAV MRK & MRKS (ARROW)EA 137.00029 677 6009ELIM EXT PAV MRK & MRKS (DBL ARROW)EA 6.00030 677 6012ELIM EXT PAV MRK & MRKS (WORD)EA 73.00031 677 6016ELIM EXT PAV MRK & MRKS (RR XING)EA 7.00032 678 6004PAV SURF PREP FOR MRK (8")LF 9,798.00033 678 6006PAV SURF PREP FOR MRK (12")LF 8,338.00034 678 6008PAV SURF PREP FOR MRK (24")LF 4,158.00035 678 6009PAV SURF PREP FOR MRK (ARROW)EA 137.00036 678 6010PAV SURF PREP FOR MRK (DBL ARROW)EA 6.00037 678 6016PAV SURF PREP FOR MRK (WORD)EA 73.00038 678 6020PAV SURF PREP FOR MRK (RR XING)EA 7.00039 30286002FRICTIONAL ASPH SURF PRESERV TRTMTSY 139,419.00040 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $55,000.00