COUNTY: MCLENNAN HIGHWAY: FM3051 LENGTH: 0.01MI CONTROL NUMBER: 6316-23-001 SBE GOAL: 0.0 % PROJECT NUMBER: RMC - 631623001 TYPE: ADD LEFT TURN LANE TIME FOR COMPLETION: 90 WORKING DAYSGUARANTY: 6,000.00 BIDS RECEIVED UNTIL: 1:00 PM APRIL 03, 2018 EST.COST: 305,887.20 BIDS WILL BE OPENED: 1:00 PM APRIL 03, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCHARLES SMITH ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 7479 BAGBY AVENUE 200 E RIVERSIDEWACO, TX 767120000 AUSTIN TX 78704-1204254/772-1200 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: FM 3051 AND KEYS CREEK LIMITS TO: AMD AVON ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6017REMOVING CONC (DRIVEWAYS)SY 34.0001 110 6001EXCAVATION (ROADWAY)CY 2,609.0002 132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY 1,828.0003 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 8,113.0004 164 6004BROADCAST SEED (PERM) (RURAL) (CLAY)AC 2.0005 164 6010BROADCAST SEED (TEMP) (WARM)AC 2.0006 166 6002FERTILIZERTON 1.2007 168 6001VEGETATIVE WATERINGMG 158.0008 247 6053FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)CY 949.0009 260 6016LIME (HYD, COM, OR QK(SLURRY))TON 76.00010 260 6027LIME TRT (EXST MATL)(8")SY 4,140.00011 310 6027PRIME COAT(MC-30 OR AE-P)GAL 590.00012 316 6017ASPH (AC-20-5TR)GAL 2,158.00013 316 6240AGGR(TY-PD GR-4 SAC-B)CY 76.00014 340 6014D-GR HMA(SQ) TY-B PG70-22TON 296.00015 340 6050D-GR HMA(SQ) TY-C PG70-22TON 325.00016 347 6001TOM (ASPHALT) PG 76-22TON 34.00017 347 6002TOM-C (AGGREGATE) SAC-ATON 413.00018 400 6005CEM STABIL BKFLCY 74.00019 464 6008RC PIPE (CL III)(36 IN)LF 188.00020 467 6454SET (TY II) (36 IN) (RCP) (6: 1) (P)EA 4.00021 496 6006REMOV STR (HEADWALL)EA 1.00022 496 6007REMOV STR (PIPE)LF 56.00023 496 6016REMOV STR (PIPE)EA 2.00024 500 6001MOBILIZATIONLS 1.00025 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.00026 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 692.00027 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 692.00028 529 6007CONC CURB & GUTTER (TY I)LF 226.00029 530 6004DRIVEWAYS (CONC)SY 27.00030 530 6005DRIVEWAYS (ACP)SY 55.00031 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 123.00032 666 6170REFL PAV MRK TY II (W) 4" (SLD)LF 3,142.00033 666 6207REFL PAV MRK TY II (Y) 4" (SLD)LF 4,860.00034 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 2.00035 672 6009REFL PAV MRKR TY II-A-AEA 123.00036 70326002WTR(PIPE WTR MAIN)PVC C900 CL150(8")LF 30.00037 70326025WTR(TIE-IN)COMPL(8")EA 2.00038