COUNTY: TRAVIS HIGHWAY: FM 734 LENGTH: 1.51MI CONTROL NUMBER: 3417-03-021 DBE GOAL: 6.0 % PROJECT NUMBER: F 2023(337) TYPE: REHABILITATION OF EXISTING ROAD TIME FOR COMPLETION: 155 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 01, 2022*EST.COST: 5,259,191.66 BIDS WILL BE OPENED: 1:00 PM DECEMBER 01, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJASON CAVNESS ATTN: CONSTRUCTION DIVISION - M1C3.02 1001 EAST PARMER LANE STE 6230 E. STASSNEY LANEAUSTIN, TX 78753 AUSTIN TX 78744-3147512/997-2202 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SAMSUNG BLVD LIMITS TO: 0.02 MI EAST OF HARRIS BRANCH ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 66.0001 104 6022REMOVING CONC (CURB AND GUTTER)LF 6,750.0002 104 6028REMOVING CONC (MISC)SY 100.0003 110 6001EXCAVATION (ROADWAY)CY 12,466.0004 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 1,236.0005 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 20,534.0006 164 6007BROADCAST SEED (PERM) (URBAN) (CLAY)SY 20,534.0007 164 6009BROADCAST SEED (TEMP) (WARM)SY 20,534.0008 164 6011BROADCAST SEED (TEMP) (COOL)SY 20,534.0009 168 6001VEGETATIVE WATERINGMG 347.00010 169 6001SOIL RETENTION BLANKETS (CL 1) (TY A)SY 20,534.00011 169 6003SOIL RETENTION BLANKETS (CL 1) (TY C)SY 20,534.00012 247 6366FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)CY 11,081.00013 247 6391FL BS (RDWY DEL)(TY A GR 5)TON 550.00014 251 6114REWORK BS MATL (TY B)(10")(OC)SY 33,241.00015 310 6001PRIME COAT (MULTI OPTION)GAL 6,648.00016 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 2,587.00017 354 6043PLANE ASPH CONC PAV (1")SY 25,829.00018 401 6001FLOWABLE BACKFILLCY 1,425.00019 420 6002CL A CONC (MISC)CY 12.00020 429 6007CONC STR REPAIR (VERTICAL & OVERHEAD)SF 12.00021 432 6045RIPRAP (MOW STRIP)(4 IN)CY 90.00022 438 6004CLEANING AND SEALING EXIST JOINTS(CL7)LF 270.00023 467 6580SET (REMOV & REINSTALL)EA 11.00024 500 6001MOBILIZATIONLS 1.00025 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 8.00026 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 150.00027 506 6011ROCK FILTER DAMS (REMOVE)LF 150.00028 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 1,400.00029 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 1,400.00030 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 800.00031 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 800.00032 512 6089PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)LF 7,000.00033 512 6090PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)LF 12,260.00034 512 6091PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)LF 7,000.00035 529 6008CONC CURB & GUTTER (TY II)LF 6,750.00036 530 6011INTRSCT, DRVWAYS, & TURNOUT (ACP)SY 956.00037 540 6001MTL W-BEAM GD FEN (TIM POST)LF 1,450.00038 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 8.00039 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 4.00040 542 6001REMOVE METAL BEAM GUARD FENCELF 1,450.00041 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 8.00042 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00043 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00044 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 5.00045 545 6005CRASH CUSH ATTEN (REMOVE)EA 3.00046 545 6019CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)EA 3.00047 644 6002IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)EA 6.00048 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 6.00049 658 6044INSTL DEL ASSM (D-DY)SZ 2(WC)GNDEA 16.00050 658 6060REMOVE DELIN & OBJECT MARKER ASSMSEA 12.00051 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 24.00052 658 6069INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)EA 16.00053 658 6070INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)EA 16.00054 662 6001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF 16,000.00055 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 26,400.00056 662 6014WK ZN PAV MRK NON-REMOV (W)12"(SLD)LF 500.00057 662 6016WK ZN PAV MRK NON-REMOV (W)24"(SLD)LF 412.00058 662 6017WK ZN PAV MRK NON-REMOV (W)(ARROW)EA 12.00059 662 6030WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)EA 296.00060 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 52,800.00061 662 6048WK ZN PAV MRK REMOV (REFL) TY I-CEA 1,110.00062 662 6050WK ZN PAV MRK REMOV (REFL) TY II-A-AEA 1,320.00063 662 6063WK ZN PAV MRK REMOV (W)4"(SLD)LF 1,600.00064 662 6069WK ZN PAV MRK REMOV (W)8"(DOT)LF 500.00065 662 6071WK ZN PAV MRK REMOV (W)8"(SLD)LF 8,990.00066 662 6080WK ZN PAV MRK REMOV (W)(ARROW)EA 36.00067 662 6090WK ZN PAV MRK REMOV (W)(WORD)EA 24.00068 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 3,160.00069 662 6110WK ZN PAV MRK SHT TERM (TAB)TY YEA 1,300.00070 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 4,810.00071 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 316.00072 666 6054REFL PAV MRK TY I (W)(ARROW)(100MIL)EA 22.00073 666 6078REFL PAV MRK TY I (W)(WORD)(100MIL)EA 19.00074 666 6099REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)EA 48.00075 666 6141REFL PAV MRK TY I (Y)12"(SLD)(100MIL)LF 1,275.00076 666 6167REFL PAV MRK TY II (W) 4" (BRK)LF 3,195.00077 666 6170REFL PAV MRK TY II (W) 4" (SLD)LF 12,296.00078 666 6178REFL PAV MRK TY II (W) 8" (SLD)LF 4,810.00079 666 6182REFL PAV MRK TY II (W) 24" (SLD)LF 316.00080 666 6184REFL PAV MRK TY II (W) (ARROW)EA 22.00081 666 6192REFL PAV MRK TY II (W) (WORD)EA 19.00082 666 6198REFL PAV MRK TY II (W) 18" (YLD TRI)EA 96.00083 666 6207REFL PAV MRK TY II (Y) 4" (SLD)LF 12,580.00084 666 6212REFL PAV MRK TY II (Y) 12" (SLD)LF 1,275.00085 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 3,195.00086 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 12,296.00087 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 12,580.00088 672 6010REFL PAV MRKR TY II-C-REA 445.00089 677 6001ELIM EXT PAV MRK & MRKS (4")LF 1,280.00090 677 6003ELIM EXT PAV MRK & MRKS (8")LF 600.00091 677 6005ELIM EXT PAV MRK & MRKS (12")LF 600.00092 730 6107FULL - WIDTH MOWINGCYC 3.00093 734 6002LITTER REMOVALCYC 2.00094 738 6010CLEANING / SWEEPING (SPOT)MI 3.00095 30766001D-GR HMA TY-B PG64-22TON 9,145.00096 30766048D-GR HMA TY-D PG76-22TON 2,025.00097 30816007TOM-C PG76-22 SAC-ATON 3,523.00098 30846001BONDING COURSEGAL 8,600.00099 50016002GEOGRID BASE REINFORCEMENT (TY II)SY 33,241.000100 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 3.000101 61856002TMA (STATIONARY)DAY 260.000102 61856003TMA (MOBILE OPERATION)HR 125.000103 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $96,500.00