COUNTY: COLLIN HIGHWAY: FM 2194 LENGTH: 5.6170MI CONTROL NUMBER: 2247-01-011, ETCDBE GOAL: 10.5 % PROJECT NUMBER: STP 2020(723)HES, ETC TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 231 WORKING DAYSGUARANTY: 64,000.00 BIDS RECEIVED UNTIL: 1:00 PM APRIL 08, 2020*EST.COST: 3,322,783.27 BIDS WILL BE OPENED: 1:00 PM APRIL 08, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJENNIFER VORSTER ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2205 SOUTH SH 5 200 E RIVERSIDEMCKINNEY, TX 75069 AUSTIN TX 78704-1204972/547-2231 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ COLLIN2247-01-011BS 78E FM 2194STP 2020(723)HES0.25 MI E OF CR 657 LENGTH: 2.8070 MILES COLLIN2247-01-013BS 78E FM 2194STP 2020(718)EAST OF CR 657 LENGTH: 2.81 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 147.3001 104 6017REMOVING CONC (DRIVEWAYS)SY 581.0002 110 6001EXCAVATION (ROADWAY)CY 4,653.0003 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 6,972.0004 134 6004BACKFILL (TY A OR B)STA 147.3005 150 6001BLADINGSTA 147.3006 164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY 98,199.0007 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 98,199.0008 168 6001VEGETATIVE WATERINGMG 29,216.0009 247 6133FL BS (RDWY DEL) (TY D GR 1-2)TON 2,200.00010 247 6304FL BS (CMP IN PLACE) (TY D GR 1-2)(10")SY 47,463.00011 251 6060REWORK BS MTL (TY C)(12"-18")(ORD COMP)SY 36,007.00012 275 6001CEMENTTON 491.00013 275 6005CEMENT TREAT (EXIST MATL)(12")SY 49,100.00014 314 6021EMULS ASPH (PRIME)(MS-2 OR SS-1)GAL 9,493.00015 316 6024ASPH (CRS-2P)GAL 28,794.00016 316 6029ASPH (RC-250)GAL 4,430.00017 316 6177AGGR(TY-B GR-5 SAC-B)CY 127.00018 316 6419ASPH (AC-15P, AC-20-5TR OR AC-20XP)GAL 23,732.00019 316 6434AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)CY 396.00020 316 6435AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)CY 396.00021 316 6440AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)CY 301.00022 403 6001TEMPORARY SPL SHORINGSF 580.00023 432 6001RIPRAP (CONC)(4 IN)CY 98.00024 432 6030RIPRAP (STONE COMMON)(GROUT)(12 IN)CY 26.00025 432 6045RIPRAP (MOW STRIP)(4 IN)CY 63.00026 462 6060CONC BOX CULV (7 FT X 5 FT)(EXTEND)LF 24.00027 464 6003RC PIPE (CL III)(18 IN)LF 1,288.00028 464 6005RC PIPE (CL III)(24 IN)LF 384.00029 464 6008RC PIPE (CL III)(36 IN)LF 26.00030 464 6010RC PIPE (CL III)(48 IN)LF 12.00031 465 6126INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)EA 1.00032 466 6097HEADWALL (CH - PW - 0) (DIA= 24 IN)EA 4.00033 466 6101HEADWALL (CH - PW - 0) (DIA= 36 IN)EA 3.00034 466 6103HEADWALL (CH - PW - 0) (DIA= 48 IN)EA 1.00035 466 6183WINGWALL (PW - 1) (HW=8 FT)EA 2.00036 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 90.00037 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 26.00038 479 6002ADJUSTING INLETSEA 1.00039 480 6001CLEAN EXIST CULVERTSEA 1.00040 496 6002REMOV STR (INLET)EA 1.00041 496 6004REMOV STR (SET)EA 116.00042 496 6005REMOV STR (WINGWALL)EA 2.00043 496 6006REMOV STR (HEADWALL)EA 8.00044 496 6007REMOV STR (PIPE)LF 1,474.00045 500 6001MOBILIZATIONLS 1.00046 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 11.00047 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 300.00048 506 6011ROCK FILTER DAMS (REMOVE)LF 300.00049 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 163.00050 506 6024CONSTRUCTION EXITS (REMOVE)SY 163.00051 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 2,266.00052 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 2,266.00053 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 590.00054 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 590.00055 530 6004DRIVEWAYS (CONC)SY 571.00056 530 6005DRIVEWAYS (ACP)SY 5,430.00057 540 6001MTL W-BEAM GD FEN (TIM POST)LF 1,434.00058 540 6015DRIVEWAY TERMINAL ANCHOR SECTIONEA 1.00059 542 6001REMOVE METAL BEAM GUARD FENCELF 2,161.00060 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 7.00061 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 10.00062 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 28.00063 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 2.00064 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 34.00065 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 2.00066 644 6036IN SM RD SN SUP&AM TYS80(1)SA(U-BM)EA 1.00067 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 16.00068 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 30.00069 662 6110WK ZN PAV MRK SHT TERM (TAB)TY YEA 6,178.00070 666 6018REFL PAV MRK TY I (W)6"(DOT)(100MIL)LF 737.00071 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 117.00072 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 690.00073 666 6342REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)LF 20,304.00074 666 6343REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)LF 8,322.00075 666 6345REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)LF 28,821.00076 672 6009REFL PAV MRKR TY II-A-AEA 360.00077 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00078 61856002TMA (STATIONARY)DAY 200.00079 61856003TMA (MOBILE OPERATION)HR 176.00080 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $112,000.00