COUNTY: CHAMBERS HIGHWAY: FM 1410 LENGTH: 0.60MI CONTROL NUMBER: 1420-02-012 DBE GOAL: 0.0 % PROJECT NUMBER: STP 2018(758)HES TYPE: PROVIDE ADDITIONAL SURFACE_WIDTH TIME FOR COMPLETION: 28 WORKING DAYSGUARANTY: 8,000.00 BIDS RECEIVED UNTIL: 1:00 PM APRIL 04, 2018*EST.COST: 388,198.90 BIDS WILL BE OPENED: 1:00 PM APRIL 04, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONOMAR DELEON, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 209 LAYL DRIVE 200 E RIVERSIDELIBERTY, TX 77575 AUSTIN TX 78704-1204936/336-2244 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 0.6 MILES NORTH OF FM 1663 LIMITS TO: FM 1663 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 112 6001SUBGRADE WIDENING (ORD COMP)STA 30.6301 134 6004BACKFILL (TY A OR B)STA 30.6302 164 6009BROADCAST SEED (TEMP) (WARM)SY 2,066.0003 164 6011BROADCAST SEED (TEMP) (COOL)SY 2,066.0004 164 6023CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)SY 4,132.0005 168 6001VEGETATIVE WATERINGMG 35.0006 247 6483FL BS(RDWY DEL)(TY D GR 1-2)(FNAL POS)CY 662.0007 275 6001CEMENTTON 130.0008 275 6033CEMENT TREAT (MX EXST MATL & NW BS)(7")SY 9,539.0009 310 6005PRIME COAT (AE-P)GAL 1,908.00010 316 6398AGGR (TY-PD GR-4 OR TY-PL GR-4)(SAC-B)CY 87.00011 316 6436ASPH (AC-15P OR AC-10-2TR)GAL 3,434.00012 344 6032SUPERPAVE MIXTURES SP-C SAC-B PG64-22TON 1,051.00013 500 6001MOBILIZATIONLS 1.00014 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 2.00015 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 75.00016 506 6011ROCK FILTER DAMS (REMOVE)LF 75.00017 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 220.00018 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 220.00019 530 6002INTERSECTIONS (ACP)SY 514.00020 530 6015DRIVEWAYS AND TURNOUTS (SURF TREAT)SY 168.00021 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 2.00022 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 346.00023 666 6035REFL PAV MRK TY I (W)8"(SLD)(090MIL)LF 322.00024 666 6302RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)LF 6,099.00025 666 6311RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)LF 520.00026 666 6314RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)LF 2,583.00027 668 6092PREFAB PAV MRK TY C (W) (36")(YLD TRI)EA 10.00028 672 6009REFL PAV MRKR TY II-A-AEA 56.00029 61856002TMA (STATIONARY)DAY 28.00030 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00