COUNTY: CALDWELL HIGHWAY: FM 671 LENGTH: 0.1330MI CONTROL NUMBER: 1060-01-012, ETCDBE GOAL: 4.0 % PROJECT NUMBER: BR 2023(263) TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 160 WORKING DAYSGUARANTY: 35,000.00 BIDS RECEIVED UNTIL: 1:00 PM FEBRUARY 02, 2023 EST.COST: 1,737,862.45 BIDS WILL BE OPENED: 1:00 PM FEBRUARY 02, 2023 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONDIANA SCHULZE ATTN: CONSTRUCTION DIVISION - M1C3.02 174 SH 21 EAST 6230 E. STASSNEY LANEBASTROP, TX 78602 AUSTIN TX 78744-3147512/308-4468 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ CALDWELL1060-01-012AT DRAW FM 671BR 2023(263)(STR 1060-01-004) LENGTH: 0 MILES CALDWELL1060-01-014AT DRAW FM 671BR 2023(263)STR# 14-028-0-1060-01-003 LENGTH: 0.1330 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 13.0701 104 6009REMOVING CONC (RIPRAP)SY 290.0002 110 6001EXCAVATION (ROADWAY)CY 715.0003 110 6002EXCAVATION (CHANNEL)CY 130.0004 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 2,235.0005 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 1,820.0006 164 6009BROADCAST SEED (TEMP) (WARM)SY 1,820.0007 164 6011BROADCAST SEED (TEMP) (COOL)SY 1,820.0008 168 6001VEGETATIVE WATERINGMG 40.0009 169 6002SOIL RETENTION BLANKETS (CL 1) (TY B)SY 1,820.00010 247 6392FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS)CY 1,779.00011 310 6001PRIME COAT (MULTI OPTION)GAL 911.00012 400 6005CEM STABIL BKFLCY 194.00013 403 6001TEMPORARY SPL SHORINGSF 2,295.00014 416 6002DRILL SHAFT (24 IN)LF 870.00015 420 6013CL C CONC (ABUT)CY 57.80016 420 6029CL C CONC (CAP)CY 20.80017 420 6037CL C CONC (COLUMN)CY 10.60018 422 6007REINF CONC SLAB (SLAB BEAM)SF 5,688.00019 422 6015APPROACH SLABCY 166.20020 423 6001RETAINING WALL (MSE)SF 2,275.00021 425 6011PRESTR CONC SLAB BEAM (4SB15)LF 398.77022 425 6012PRESTR CONC SLAB BEAM (5SB15)LF 797.54023 432 6002RIPRAP (CONC)(5 IN)CY 69.00024 432 6045RIPRAP (MOW STRIP)(4 IN)CY 77.00025 432 6057RIPRAP (STONE TY R)(GROUT)(18 IN)CY 415.00026 450 6006RAIL (TY T223)LF 322.00027 454 6004ARMOR JOINT (SEALED)LF 170.00028 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 2.00029 496 6043REMOV STR (SMALL FENCE)LF 535.00030 500 6001MOBILIZATIONLS 1.00031 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 8.00032 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 226.00033 506 6011ROCK FILTER DAMS (REMOVE)LF 226.00034 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 2,370.00035 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 2,370.00036 540 6001MTL W-BEAM GD FEN (TIM POST)LF 800.00037 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 8.00038 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 8.00039 552 6003WIRE FENCE (TY C)LF 535.00040 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 4.00041 644 6076REMOVE SM RD SN SUP&AMEA 4.00042 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 2,614.00043 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 2,614.00044 672 6009REFL PAV MRKR TY II-A-AEA 50.00045 30766070D-GR HMA TY-D PG 76-22 SAC-B (EXEMPT)TON 565.00046 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 4.00047