COUNTY: DALLAS HIGHWAY: CS LENGTH: 0.1090MI CONTROL NUMBER: 0918-47-062 DBE GOAL: 8.0 % PROJECT NUMBER: BR 2013(300) TYPE: REPL BR & APPR TIME FOR COMPLETION: 132 WORKING DAYSGUARANTY: 15,000.00 BIDS RECEIVED UNTIL: 1:00 PM APRIL 02, 2019*EST.COST: 739,072.65 BIDS WILL BE OPENED: 1:00 PM APRIL 02, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJASON MASHELL ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 4777 E. HWY 80 200 E RIVERSIDEMESQUITE, TX 75150 AUSTIN TX 78704-1204214/320-6240 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: ON THIRD ST AT KELLER BRANCH LIMITS TO: IN CITY OF LANCASTER ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 5.8001 105 6005REMOVING STAB BASE AND ASPH PAV (3")SY 1,138.0002 106 6001OBLITERATING ABANDONED ROADSTA 2.9003 110 6001EXCAVATION (ROADWAY)CY 580.0004 110 6002EXCAVATION (CHANNEL)CY 426.0005 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 243.0006 161 6017COMPOST MANUF TOPSOIL (4")SY 1,805.0007 162 6002BLOCK SODDINGSY 1,805.0008 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 1,805.0009 168 6001VEGETATIVE WATERINGMG 538.00010 247 6312FL BS (CMP IN PLC)(TY D GR1-2)(8")SY 1,380.00011 310 6027PRIME COAT(MC-30 OR AE-P)GAL 260.00012 316 6024ASPH (CRS-2P)GAL 217.00013 316 6029ASPH (RC-250)GAL 122.00014 316 6403AGGR (TY-B GR-5 OR TY-L GR-5)CY 5.00015 316 6419ASPH (AC-15P, AC-20-5TR OR AC-20XP)GAL 182.00016 316 6440AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)CY 10.00017 344 6032SUPERPAVE MIXTURES SP-C SAC-B PG64-22TON 144.00018 400 6005CEM STABIL BKFLCY 74.60019 416 6004DRILL SHAFT (36 IN)LF 286.00020 420 6014CL C CONC (ABUT)(HPC)CY 41.80021 420 6030CL C CONC (CAP)(HPC)CY 13.60022 420 6038CL C CONC (COLUMN)(HPC)CY 3.10023 422 6002REINF CONC SLAB (HPC)SF 4,200.00024 422 6016APPROACH SLAB (HPC)CY 53.40025 425 6036PRESTR CONC GIRDER (TX34)LF 555.90026 432 6001RIPRAP (CONC)(4 IN)CY 48.00027 432 6031RIPRAP (STONE PROTECTION)(12 IN)CY 50.00028 432 6045RIPRAP (MOW STRIP)(4 IN)CY 20.00029 450 6007RAIL (TY T223)(HPC)LF 316.00030 454 6001SEALED EXPANSION JOINT (4 IN) (SEJ - A)LF 60.30031 464 6001RC PIPE (CL III)(12 IN)LF 68.00032 464 6005RC PIPE (CL III)(24 IN)LF 25.00033 467 6326SET (TY II) (12 IN) (RCP) (6: 1) (P)EA 6.00034 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 2.00035 496 6007REMOV STR (PIPE)LF 98.00036 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 1.00037 500 6001MOBILIZATIONLS 1.00038 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00039 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 32.00040 506 6011ROCK FILTER DAMS (REMOVE)LF 32.00041 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 146.00042 506 6024CONSTRUCTION EXITS (REMOVE)SY 146.00043 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 1,175.00044 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 1,175.00045 540 6001MTL W-BEAM GD FEN (TIM POST)LF 212.50046 540 6007MTL BEAM GD FEN TRANS (TL2)EA 4.00047 540 6014SHORT RADIUSLF 25.00048 540 6015DRIVEWAY TERMINAL ANCHOR SECTIONEA 1.00049 542 6001REMOVE METAL BEAM GUARD FENCELF 150.00050 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 4.00051 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 3.00052 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 1.00053 644 6060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA 14.00054 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 6.00055 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 19.00056 666 6224PAVEMENT SEALER 4"LF 750.00057 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 956.00058 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 1,160.00059 678 6001PAV SURF PREP FOR MRK (4")LF 2,116.00060 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $36,780.00