COUNTY: NAVARRO HIGHWAY: VA LENGTH: 12.9860MI CONTROL NUMBER: 0918-18-135 SBE GOAL: 0.0 % PROJECT NUMBER: C 918-18-135 TYPE: REPLACE TURNDOWNS AND GUARDRAILS TIME FOR COMPLETION: 240 WORKING DAYSGUARANTY: 89,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 06, 2018*EST.COST: 3,944,835.75 BIDS WILL BE OPENED: 1:00 PM JUNE 06, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJUAN A PAREDES, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 100 S.W. C.R. 1000 200 E RIVERSIDECORSICANA, TX 75110 AUSTIN TX 78704-1204903/874-4351 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: AT VARIOUS LOCATIONS LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 233.0001 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 15,495.0002 162 6002BLOCK SODDINGSY 2,758.0003 164 6023CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)SY 41,676.0004 164 6029CELL FBR MLCH SEED(TEMP)(WARM)SY 20,838.0005 164 6031CELL FBR MLCH SEED(TEMP)(COOL)SY 20,838.0006 168 6001VEGETATIVE WATERINGMG 7,232.0007 420 6019CL C CONC (ABUT)(EXTEND)CY 8.0008 432 6045RIPRAP (MOW STRIP)(4 IN)CY 1,647.0009 451 6019RETROFIT RAIL (TY T631)LF 624.00010 500 6001MOBILIZATIONLS 1.00011 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 12.00012 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 200.00013 506 6024CONSTRUCTION EXITS (REMOVE)SY 200.00014 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 7,060.00015 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 7,060.00016 540 6001MTL W-BEAM GD FEN (TIM POST)LF 22,186.50017 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 20.00018 540 6008MTL BEAM GD FEN TRANS (T101)EA 48.00019 540 6009MTL BEAM GD FEN TRANS (T6)EA 12.00020 540 6014SHORT RADIUSLF 437.50021 540 6015DRIVEWAY TERMINAL ANCHOR SECTIONEA 4.00022 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 3.00023 540 6017MTL BM GD FEN (LONG SPAN SYSTEM)LF 450.00024 540 6020MTL W - BEAM GD FEN (LOW FILL CULVERT)LF 175.00025 542 6001REMOVE METAL BEAM GUARD FENCELF 28,087.50026 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 236.00027 542 6003REMOVE DOWNSTREAM ANCHOR TERMINALEA 6.00028 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 249.00029 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 12.00030 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 567.00031 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 567.00032 61856002TMA (STATIONARY)DAY 378.00033 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $254,913.00