COUNTY: WASHINGTON HIGHWAY: CS LENGTH: 0.0680MI CONTROL NUMBER: 0917-19-050 DBE GOAL: 0.0 % PROJECT NUMBER: BR 2017(904) TYPE: REPLACE EXISTING BRIDGE TIME FOR COMPLETION: 69 WORKING DAYSGUARANTY: 7,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 06, 2018*EST.COST: 365,648.50 BIDS WILL BE OPENED: 1:00 PM JUNE 06, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONMARK SHAFER ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 1821 SH 105 200 E RIVERSIDEBRENHAM, TX 77833 AUSTIN TX 78704-1204979/836-9359 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: ON TEXAS STREET LIMITS TO: AT INDIAN CREEK ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 3.6001 100 6004PREPARING ROW(TREE)(12" TO 24" DIA)EA 1.0002 110 6001EXCAVATION (ROADWAY)CY 218.0003 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 318.0004 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 539.0005 164 6023CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)SY 539.0006 164 6029CELL FBR MLCH SEED(TEMP)(WARM)SY 270.0007 164 6031CELL FBR MLCH SEED(TEMP)(COOL)SY 270.0008 168 6001VEGETATIVE WATERINGMG 71.0009 247 6073FL BS (CMP IN PLC)(TY D GR 1-2) (6")SY 947.00010 400 6005CEM STABIL BKFLCY 70.00011 416 6004DRILL SHAFT (36 IN)LF 234.00012 420 6013CL C CONC (ABUT)CY 37.60013 422 6001REINF CONC SLABSF 1,950.00014 425 6035PRESTR CONC GIRDER (TX28)LF 298.00015 432 6022RIPRAP (STONE COMMON)(DRY)(6 IN)CY 22.00016 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 392.00017 450 6006RAIL (TY T223)LF 198.00018 454 6004ARMOR JOINT (SEALED)LF 44.00019 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 1.00020 500 6001MOBILIZATIONLS 1.00021 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 5.00022 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 40.00023 506 6011ROCK FILTER DAMS (REMOVE)LF 40.00024 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 312.00025 506 6024CONSTRUCTION EXITS (REMOVE)SY 312.00026 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 827.00027 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 827.00028 540 6007MTL BEAM GD FEN TRANS (TL2)EA 4.00029 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00030 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 2.00031 644 6076REMOVE SM RD SN SUP&AMEA 2.00032 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 2.00033 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 4.00034 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $6,300.00