COUNTY: VAN ZANDT HIGHWAY: CR LENGTH: 0.0020MI CONTROL NUMBER: 0910-12-021, ETCDBE GOAL: 6.0 % PROJECT NUMBER: BR 0096(509), ETC TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 92 WORKING DAYSGUARANTY: 22,000.00 BIDS RECEIVED UNTIL: 1:00 PM MARCH 05, 2020 EST.COST: 1,107,614.69 BIDS WILL BE OPENED: 1:00 PM MARCH 05, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONPRESTON FRIEND ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 205 NE LOOP 564 200 E RIVERSIDEMINEOLA, TX 75773 AUSTIN TX 78704-1204903/569-2349 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ VAN ZANDT0910-12-021CR 3605 AT GILADON CREEK CRBR 0096(509)STR # 102340AA3605101 LENGTH: 0.0010 MILES VAN ZANDT0910-12-133CR 3117 AT CROOKED CREEK TRIBUTARY CRBR 2018(116)STR#AA3117103, 0.90 MI SE OF US 80 LENGTH: 0.0010 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 6.6001 105 6011REMOVING STAB BASE AND ASPH PAV (2"-6")SY 825.0002 110 6001EXCAVATION (ROADWAY)CY 153.0003 110 6002EXCAVATION (CHANNEL)CY 700.0004 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 101.0005 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 1,640.0006 164 6054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY 1,640.0007 164 6055BONDED FBR MTRX SEED (TEMP)(WARM)SY 820.0008 164 6056BONDED FBR MTRX SEED (TEMP)(COOL)SY 820.0009 168 6001VEGETATIVE WATERINGMG 36.00010 275 6001CEMENTTON 8.00011 275 6002CEMENT TREAT (EXIST MATL) (6")SY 1,492.00012 340 6034D-GR HMA(SQ) TY-C PG64-22TON 418.00013 407 6001SHEET PILING (PZ - 27)SF 5,041.00014 416 6002DRILL SHAFT (24 IN)LF 555.00015 420 6013CL C CONC (ABUT)CY 43.20016 420 6029CL C CONC (CAP)CY 15.40017 420 6037CL C CONC (COLUMN)CY 4.90018 422 6007REINF CONC SLAB (SLAB BEAM)SF 3,640.00019 425 6010PRESTR CONC SLAB BEAM (5SB12)LF 442.12020 425 6012PRESTR CONC SLAB BEAM (5SB15)LF 247.50021 432 6001RIPRAP (CONC)(4 IN)CY 4.00022 432 6008RIPRAP (CONC)(CL B)(RR8&RR9)CY 6.00023 432 6024RIPRAP (STONE COMMON)(DRY)(12 IN)CY 5.00024 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 641.00025 432 6045RIPRAP (MOW STRIP)(4 IN)CY 40.00026 450 6006RAIL (TY T223)LF 332.00027 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 2.00028 500 6001MOBILIZATIONLS 1.00029 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.00030 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 100.00031 506 6011ROCK FILTER DAMS (REMOVE)LF 100.00032 506 6027 EXCAV (EROSN & SEDMT CONT, IN VEH)CY 100.00033 506 6030BACKHOE WORK (EROSION & SEDMT CONT)HR 40.00034 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 1,460.00035 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 1,460.00036 506 6046TRACKHOE WORK (EROSION & SEDMT CONT)HR 40.00037 540 6007MTL BEAM GD FEN TRANS (TL2)EA 8.00038 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 8.00039 644 6076REMOVE SM RD SN SUP&AMEA 4.00040 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 4.00041 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 8.00042 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 28.00043