COUNTY: TARRANT HIGHWAY: CR LENGTH: 0MI CONTROL NUMBER: 0902-48-850 DBE GOAL: 5.0 % PROJECT NUMBER: BR 2018(291) TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 64 WORKING DAYSGUARANTY: 15,000.00 BIDS RECEIVED UNTIL: 1:00 PM AUGUST 05, 2020*EST.COST: 733,096.00 BIDS WILL BE OPENED: 1:00 PM AUGUST 05, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONBAO-PHUC TRAN, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2501 W EULESS BLVD 200 E RIVERSIDEEULESS, TX 76040 AUSTIN TX 78704-1204817/399-4300 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: AT GILMORE BRANCH CREEK LIMITS TO: ON GRANTS LANE ROAD ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 5.0001 110 6001EXCAVATION (ROADWAY)CY 146.0002 132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY 158.0003 161 6017COMPOST MANUF TOPSOIL (4")SY 2,886.0004 162 6002BLOCK SODDINGSY 2,886.0005 168 6001VEGETATIVE WATERINGMG 101.0006 169 6003SOIL RETENTION BLANKETS (CL 1) (TY C)SY 300.0007 340 6011D-GR HMA(SQ) TY-B PG64-22TON 225.0008 340 6051D-GR HMA(SQ) TY-C SAC-A PG70-28TON 88.0009 403 6001TEMPORARY SPL SHORINGSF 498.00010 432 6031RIPRAP (STONE PROTECTION)(12 IN)CY 12.00011 432 6045RIPRAP (MOW STRIP)(4 IN)CY 16.00012 450 6019RAIL (TY T631LS)LF 112.00013 462 6010CONC BOX CULV (6 FT X 3 FT)LF 36.00014 462 6021CONC BOX CULV (8 FT X 6 FT)LF 78.00015 464 6001RC PIPE (CL III)(12 IN)LF 106.00016 464 6005RC PIPE (CL III)(24 IN)LF 26.00017 466 6182WINGWALL (PW - 1) (HW=7 FT)EA 2.00018 467 6324SET (TY II) (12 IN) (RCP) (4: 1) (P)EA 4.00019 467 6389SET (TY II) (24 IN) (RCP) (3: 1) (P)EA 2.00020 496 6007REMOV STR (PIPE)LF 62.00021 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 1.00022 500 6001MOBILIZATIONLS 1.00023 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 4.00024 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 26.00025 506 6011ROCK FILTER DAMS (REMOVE)LF 26.00026 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 156.00027 506 6024CONSTRUCTION EXITS (REMOVE)SY 156.00028 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 1,002.00029 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 1,002.00030 508 6001CONSTRUCTING DETOURSSY 1,253.00031 512 6021PORT CTB (DES SOURCE)(LOW PROF)(TY 1)LF 680.00032 512 6022PORT CTB (DES SOURCE)(LOW PROF)(TY 2)LF 80.00033 512 6045PORT CTB (STKPL)(LOW PROF)(TY 1)LF 680.00034 512 6046PORT CTB (STKPL)(LOW PROF)(TY 2)LF 80.00035 530 6005DRIVEWAYS (ACP)SY 66.00036 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 94.00037 540 6014SHORT RADIUSLF 16.00038 540 6015DRIVEWAY TERMINAL ANCHOR SECTIONEA 1.00039 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 3.00040 552 6003WIRE FENCE (TY C)LF 1,065.00041 644 6076REMOVE SM RD SN SUP&AMEA 2.00042 658 6011INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)EA 12.00043 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 2.00044 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 930.00045 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 930.00046 666 6170REFL PAV MRK TY II (W) 4" (SLD)LF 650.00047 666 6207REFL PAV MRK TY II (Y) 4" (SLD)LF 650.00048 678 6001PAV SURF PREP FOR MRK (4")LF 1,300.00049 752 6007TREE REMOVAL (18" - 24" DIA)EA 5.00050 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00051 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $11,100.00