COUNTY: PALO PINTO HIGHWAY: CR LENGTH: 0.10MI CONTROL NUMBER: 0902-39-021 DBE GOAL: 0.0 % PROJECT NUMBER: BR 2007(456) TYPE: REPLACE BRIDGE AND APPROACHES TIME FOR COMPLETION: 128 WORKING DAYSGUARANTY: 17,000.00 BIDS RECEIVED UNTIL: 1:00 PM MARCH 06, 2018*EST.COST: 855,121.83 BIDS WILL BE OPENED: 1:00 PM MARCH 06, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONDAVID NEELEY ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 1427 W. BANKHEAD 200 E RIVERSIDEWEATHERFORD, TX 76086 AUSTIN TX 78704-1204682/229-2800 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: DAIRY FARM ROAD AT PALO PINTO CREEK LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 5.0001 105 6005REMOVING STAB BASE AND ASPH PAV (3")SY 595.0002 110 6001EXCAVATION (ROADWAY)CY 109.0003 110 6002EXCAVATION (CHANNEL)CY 190.0004 132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY 383.0005 164 6013STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)SY 150.0006 168 6001VEGETATIVE WATERINGMG 8.0007 247 6064FL BS (CMP IN PLC)(TY A GR 4) (6")SY 753.0008 340 6011D-GR HMA(SQ) TY-B PG64-22TON 166.0009 340 6106D-GR HMA(SQ) TY-D PG64-22TON 83.00010 400 6005CEM STABIL BKFLCY 73.00011 416 6004DRILL SHAFT (36 IN)LF 483.00012 420 6014CL C CONC (ABUT)(HPC)CY 38.60013 420 6030CL C CONC (CAP)(HPC)CY 23.40014 420 6038CL C CONC (COLUMN)(HPC)CY 23.60015 422 6002REINF CONC SLAB (HPC)SF 4,290.00016 425 6035PRESTR CONC GIRDER (TX28)LF 654.00017 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 1,061.40018 450 6007RAIL (TY T223)(HPC)LF 378.00019 454 6004ARMOR JOINT (SEALED)LF 40.00020 496 6010REMOV STR (BRIDGE 100 - 499 FT LENGTH)EA 1.00021 500 6001MOBILIZATIONLS 1.00022 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.00023 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 640.00024 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 640.00025 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 106.00026 540 6007MTL BEAM GD FEN TRANS (TL2)EA 4.00027 540 6014SHORT RADIUSLF 20.00028 540 6015DRIVEWAY TERMINAL ANCHOR SECTIONEA 1.00029 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 3.00030 552 6001WIRE FENCE (TY A)LF 125.00031 658 6013INSTL DEL ASSM (D-SW)SZ (BRF)CTBEA 10.00032 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 8.00033 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 888.00034 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 930.00035 678 6001PAV SURF PREP FOR MRK (4")LF 1,818.00036 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00