COUNTY: WISE HIGHWAY: CR LENGTH: 0.10MI CONTROL NUMBER: 0902-20-099 DBE GOAL: 7.0 % PROJECT NUMBER: BR 2009(900) TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 107 WORKING DAYSGUARANTY: 14,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 09, 2019*EST.COST: 703,994.50 BIDS WILL BE OPENED: 1:00 PM JULY 09, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONEDREAN CHENG ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 P.O. BOX 979 200 E RIVERSIDEDECATUR, TX 76234 AUSTIN TX 78704-1204940/626-3400 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: CR 2224 AT CATLETT CREEK LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 3.2001 105 6041REMOVING STAB BASE AND ASPH PAV(8")SY 571.0002 110 6001EXCAVATION (ROADWAY)CY 130.0003 110 6002EXCAVATION (CHANNEL)CY 600.0004 132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY 442.0005 164 6013STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)SY 2,500.0006 164 6047STRAW/HAY MLCH SEED(TEMP)(WARM)SY 1,250.0007 164 6049STRAW/HAY MLCH SEED(TEMP)(COOL)SY 1,250.0008 166 6002FERTILIZERTON 0.1509 168 6001VEGETATIVE WATERINGMG 175.00010 169 6006SOIL RETENTION BLANKETS (CL 2) (TY F)SY 1,100.00011 247 6201FL BS (CMP IN PLC)(TY A GR 4) (8")SY 675.00012 310 6028PRIME COAT (MC-30 OR EC-30)GAL 135.00013 340 6106D-GR HMA(SQ) TY-D PG64-22TON 78.00014 401 6001FLOWABLE BACKFILLCY 44.00015 416 6004DRILL SHAFT (36 IN)LF 300.00016 420 6014CL C CONC (ABUT)(HPC)CY 31.60017 422 6002REINF CONC SLAB (HPC)SF 1,950.00018 422 6015APPROACH SLABCY 50.40019 425 6035PRESTR CONC GIRDER (TX28)LF 297.93020 432 6036RIPRAP (STONE PROTECTION)(30 IN)CY 1,080.00021 432 6045RIPRAP (MOW STRIP)(4 IN)CY 19.00022 450 6018RAIL (TY T631)LF 182.00023 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 1.00024 500 6001MOBILIZATIONLS 1.00025 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 5.00026 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 624.00027 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 624.00028 506 6040BIODEG EROSN CONT LOGS (INSTL) (8")LF 100.00029 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 100.00030 540 6001MTL W-BEAM GD FEN (TIM POST)LF 175.00031 540 6015DRIVEWAY TERMINAL ANCHOR SECTIONEA 1.00032 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 2.00033 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 1.00034 552 6004WIRE FENCE (TY D)LF 324.00035 552 6007GATE (TY 3)EA 3.00036 644 6056IN SM RD SN SUP&AM TYTWT(1)UA(P)EA 2.00037 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 6.00038 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 2.00039 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 12.00040 666 6207REFL PAV MRK TY II (Y) 4" (SLD)LF 75.00041 666 6345REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)LF 75.00042 678 6001PAV SURF PREP FOR MRK (4")LF 75.00043 10046001TREE PROTECTIONEA 1.00044 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 28.00045 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $17,000.00