COUNTY: BOWIE HIGHWAY: IH 30 LENGTH: 0.2660MI CONTROL NUMBER: 0610-06-088 DBE GOAL: 0.0 % PROJECT NUMBER: NH 1702(448) TYPE: CMT TRT BASE, ACP & PVMT MARKINGS TIME FOR COMPLETION: 69 WORKING DAYSGUARANTY: 13,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 12, 2017*EST.COST: 638,757.20 BIDS WILL BE OPENED: 1:00 PM JULY 12, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONKENNETH ICENHOWER ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 520 SOWELL LN 200 E RIVERSIDETEXARKANA, TX 75501 AUSTIN TX 78704-1204903/838-8574 TO REQUEST A PROPOSAL CALL 512/416-2498 FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 0.3 MI. W. OF SH 8 LIMITS TO: SH 8 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6017REMOVING CONC (DRIVEWAYS)SY 686.0001 104 6022REMOVING CONC (CURB AND GUTTER)LF 73.0002 104 6028REMOVING CONC (MISC)SY 21.6003 105 6018REMOVING STAB BASE AND ASPH PAV (7")SY 5,267.0004 132 6002EMBANKMENT (FINAL)(DENS CONT)(TY A)CY 425.0005 134 6001BACKFILL (TY A)STA 26.6006 150 6001BLADINGSTA 5.3007 164 6054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY 3,700.0008 164 6056BONDED FBR MTRX SEED (TEMP)(COOL)SY 2,780.0009 168 6001VEGETATIVE WATERINGMG 59.00010 169 6002SOIL RETENTION BLANKETS (CL 1) (TY B)SY 675.00011 275 6001CEMENTTON 160.30012 275 6063CEMENT TREAT (SUBGRADE)(10")SY 7,634.00013 310 6021PRIME COAT & BLOTTER (MC-30)GAL 1,909.00014 344 6064SUPERPAVE MIXTURES SP-C SAC-B PG76-22TON 2,023.00015 344 6136SUPERPAVE MIXTURES SP-D SAC-B PG76-22TON 984.00016 420 6006CL A CONC (CURB OUTLET)(TY II)EA 4.00017 420 6071CL C CONC (COLLAR)EA 2.00018 432 6045RIPRAP (MOW STRIP)(4 IN)CY 23.50019 464 6005RC PIPE (CL III)(24 IN)LF 12.00020 467 6388SET (TY II) (24 IN) (RCP) (3: 1) (C)EA 2.00021 496 6006REMOV STR (HEADWALL)EA 2.00022 500 6001MOBILIZATIONLS 1.00023 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 5.00024 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 35.00025 506 6011ROCK FILTER DAMS (REMOVE)LF 35.00026 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 1,870.00027 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 1,870.00028 529 6008CONC CURB & GUTTER (TY II)LF 32.00029 530 6004DRIVEWAYS (CONC)SY 594.00030 530 6005DRIVEWAYS (ACP)SY 216.00031 530 6008TURNOUTS (ACP)SY 47.00032 540 6001MTL W-BEAM GD FEN (TIM POST)LF 225.00033 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 1.00034 542 6001REMOVE METAL BEAM GUARD FENCELF 200.00035 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 4.00036 544 6004GDRAIL END TRT(INST)(WOOD POST)(TY I)EA 3.00037 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 1.00038 644 6068RELOCATE SM RD SN SUP&AM TY 10BWGEA 3.00039 644 6070RELOCATE SM RD SN SUP&AM TY S80EA 1.00040 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 2.00041 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 7.00042 662 6071WK ZN PAV MRK REMOV (W)8"(SLD)LF 90.00043 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 3,276.00044 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 578.00045 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 90.00046 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 5,412.00047 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 6,582.00048 672 6007REFL PAV MRKR TY I-CEA 12.00049 672 6009REFL PAV MRKR TY II-A-AEA 177.00050 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,500.00