COUNTY: LOVING HIGHWAY: SH 302 LENGTH: 0MI CONTROL NUMBER: 0479-03-021 DBE GOAL: 3.5 % PROJECT NUMBER: F 2022(590) TYPE: SUPER-2 HIGHWAY TIME FOR COMPLETION: 478 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 02, 2022*EST.COST: 26,165,542.17 BIDS WILL BE OPENED: 1:00 PM DECEMBER 02, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONSAUL ROMERO, P.E ATTN: CONSTRUCTION DIVISION - M1C3.02 3901 EAST US HIGHWAY 80 6230 E. STASSNEY LANEODESSA, TX 79761 AUSTIN TX 78744-3147432/498-4770 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: EAST OF PURPLE CATTLE GUARD RD LIMITS TO: WINKLER COUNTY LINE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 105 6020REMOVING STAB BASE & ASPH PAV (12")SY 37,682.0001 105 6023REMOVING STAB BASE AND ASPH PAV (5")SY 121,397.0002 110 6001EXCAVATION (ROADWAY)CY 75,165.0003 132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY 26,532.0004 150 6001BLADINGSTA 398.0005 216 6001PROOF ROLLINGHR 15.0006 247 6318FL BS (CMP IN PLC)(TY A GR 4)(5")SY 199,003.0007 251 6079REWORK BS MTL (TY D)(SURF)(ORD COMP)SY 99,997.0008 310 6009PRIME COAT (MC-30)GAL 56,964.0009 315 6004FOG SEAL (CSS-1H)GAL 59,482.00010 316 6017ASPH (AC-20-5TR)GAL 108,234.00011 316 6126AGGR(TY-PB GR-4 SAC-A)CY 2,477.00012 400 6001STRUCT EXCAVCY 839.00013 400 6005CEM STABIL BKFLCY 452.00014 400 6006CUT & RESTORING PAVSY 165.00015 402 6001TRENCH EXCAVATION PROTECTIONLF 529.00016 403 6001TEMPORARY SPL SHORINGSF 6,481.00017 462 6003CONC BOX CULV (4 FT X 2 FT)LF 240.00018 462 6006CONC BOX CULV (5 FT X 2 FT)LF 606.00019 1464 6003RC PIPE (CL III)(18 IN)LF 847.00020 2464 6005RC PIPE (CL III)(24 IN)LF 1,160.00021 464 6020RC PIPE (CL IV)(36 IN)LF 344.00022 464 6046RC PIPE (ARCH)(CL IV)(DES 3)LF 525.00023 466 6179WINGWALL (PW - 1) (HW=4 FT)EA 1.00024 467 6144SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)EA 3.00025 467 6172SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)EA 14.00026 467 6359SET (TY II) (18 IN) (RCP) (4: 1) (P)EA 14.00027 467 6391SET (TY II) (24 IN) (RCP) (4: 1) (P)EA 20.00028 467 6448SET (TY II) (36 IN) (RCP) (3: 1) (C)EA 8.00029 467 6542SET (TY II) (DES 3) (RCP) (4: 1) (C)EA 15.00030 467 6544SET (TY II) (DES 3) (RCP) (6: 1) (C)EA 3.00031 496 6006REMOV STR (HEADWALL)EA 14.00032 496 6016REMOV STR (PIPE)EA 11.00033 500 6001MOBILIZATIONLS 1.00034 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 24.00035 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 247.00036 506 6011ROCK FILTER DAMS (REMOVE)LF 247.00037 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 444.00038 506 6024CONSTRUCTION EXITS (REMOVE)SY 444.00039 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 620.00040 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 620.00041 508 6001CONSTRUCTING DETOURSSY 8,095.00042 512 6072PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)LF 12,650.00043 512 6074PTB (MOVE)(SGL SLP)(TY 1) OR (STL)LF 37,945.00044 512 6076PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)LF 12,650.00045 530 6011INTRSCT, DRVWAYS, & TURNOUT (ACP)SY 4,064.00046 533 6001RUMBLE STRIPS (SHOULDER)LF 78,416.00047 533 6002RUMBLE STRIPS (CENTERLINE)LF 20,650.00048 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 14.00049 545 6005CRASH CUSH ATTEN (REMOVE)EA 4.00050 545 6019CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)EA 4.00051 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 18.00052 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 3.00053 644 6017IN SM RD SN SUP&AM TY10BWG(2)SA(P)EA 1.00054 644 6068RELOCATE SM RD SN SUP&AM TY 10BWGEA 8.00055 644 6076REMOVE SM RD SN SUP&AMEA 9.00056 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 245,794.00057 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 246,988.00058 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 3,976.00059 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 1,988.00060 666 6006REFL PAV MRK TY I (W)4"(DOT)(100MIL)LF 2,093.00061 666 6030REFL PAV MRK TY I (W)8"(DOT)(100MIL)LF 1,500.00062 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 6,083.00063 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 7,083.00064 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 78,416.00065 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 106,384.00066 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 225.00067 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 30.00068 668 6083PREFAB PAV MRK TY C (W) (LNDP ARROW)EA 16.00069 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 30.00070 672 6007REFL PAV MRKR TY I-CEA 662.00071 672 6009REFL PAV MRKR TY II-A-AEA 3,948.00072 677 6001ELIM EXT PAV MRK & MRKS (4")LF 82,837.00073 30776007SP MIXES SP-B SAC-B PG70-22TON 153,026.00074 30776075TACK COATGAL 56,964.00075 30806021STONE-MTRX-ASPH SMAR-F SAC-ATON 23,580.00076 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00077 61856002TMA (STATIONARY)DAY 308.00078 61856003TMA (MOBILE OPERATION)HR 80.00079 1A41226014THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)LF 847.00080 2A41226010THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)LF 1,160.00081 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $110,000.00