COUNTY: COMAL HIGHWAY: US 281 LENGTH: 0.60MI CONTROL NUMBER: 0253-03-072 DBE GOAL: 0.0 % PROJECT NUMBER: NH 2018(594) TYPE: GRAD, STRUC, BASE & SURF TIME FOR COMPLETION: 57 WORKING DAYSGUARANTY: 15,000.00 BIDS RECEIVED UNTIL: 1:00 PM APRIL 04, 2018*EST.COST: 781,252.66 BIDS WILL BE OPENED: 1:00 PM APRIL 04, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONWILL LOCKETT, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 4102 IH 35 S 200 E RIVERSIDENEW BRAUNFELS, TX 78132 AUSTIN TX 78704-1204830/625-6278 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 0.9 MI N OF FM 311 LIMITS TO: 1.5 MI N OF FM 311 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 16.0001 104 6009REMOVING CONC (RIPRAP)SY 429.0002 110 6001EXCAVATION (ROADWAY)CY 16,367.0003 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 1,689.0004 161 6017COMPOST MANUF TOPSOIL (4")SY 24,863.0005 164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY 24,863.0006 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 24,863.0007 168 6001VEGETATIVE WATERINGMG 387.8708 169 6001SOIL RETENTION BLANKETS (CL 1) (TY A)SY 24,863.0009 247 6053FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)CY 1,041.00010 305 6046SALV, HAUL & STKPL RCL ASPH PV (10")SY 5,816.00011 310 6027PRIME COAT(MC-30 OR AE-P)GAL 359.00012 316 6409AGGR (TY-B GR-4)CY 144.00013 316 6410ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)GAL 4,745.00014 340 6048D-GR HMA(SQ) TY-C SAC-B PG70-22TON 192.00015 342 6002PFC (ASPHALT) PG76-22TON 61.00016 342 6006PFC-C (AGGREGATE)(PG76 MIX) SAC-ATON 939.00017 351 6008FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")SY 300.00018 467 6224SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)EA 1.00019 496 6007REMOV STR (PIPE)LF 40.00020 496 6008REMOV STR (BOX CULVERT)LF 85.00021 496 6042REMOV STR (SMALL)EA 1.00022 500 6001MOBILIZATIONLS 1.00023 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 4.00024 506 6005ROCK FILTER DAMS (INSTALL) (TY 5)LF 224.00025 506 6011ROCK FILTER DAMS (REMOVE)LF 224.00026 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 222.00027 506 6024CONSTRUCTION EXITS (REMOVE)SY 222.00028 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 580.00029 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 580.00030 512 6005PORT CTB (FUR & INST)(F-SHAPE)(TY 1)LF 2,910.00031 512 6049PORT CTB (REMOVE)(SGL SLP)(TY 1)LF 2,910.00032 512 6053PORT CTB (REMOVE)(F-SHAPE)(TY 1)LF 1,050.00033 530 6005DRIVEWAYS (ACP)SY 196.00034 530 6008TURNOUTS (ACP)SY 39.00035 542 6001REMOVE METAL BEAM GUARD FENCELF 200.00036 542 6003REMOVE DOWNSTREAM ANCHOR TERMINALEA 1.00037 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 1.00038 545 6005CRASH CUSH ATTEN (REMOVE)EA 2.00039 545 6019CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)EA 2.00040 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 1.00041 560 6013MAILBOX INSTALL-M (TWW-POST) TY 4EA 1.00042 644 6076REMOVE SM RD SN SUP&AMEA 31.00043 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 1.00044 658 6060REMOVE DELIN & OBJECT MARKER ASSMSEA 28.00045 662 6001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF 730.00046 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 2,900.00047 662 6012WK ZN PAV MRK NON-REMOV (W)8"(SLD)LF 1,250.00048 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 1,760.00049 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 742.00050 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 1,685.00051 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 30.00052 666 6054REFL PAV MRK TY I (W)(ARROW)(100MIL)EA 3.00053 666 6063REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)EA 5.00054 666 6078REFL PAV MRK TY I (W)(WORD)(100MIL)EA 8.00055 666 6147REFL PAV MRK TY I (Y)24"(SLD)(100MIL)LF 24.00056 666 6178REFL PAV MRK TY II (W) 8" (SLD)LF 1,685.00057 666 6182REFL PAV MRK TY II (W) 24" (SLD)LF 30.00058 666 6184REFL PAV MRK TY II (W) (ARROW)EA 3.00059 666 6187REFL PAV MRK TY II (W) (UTURN ARROW)EA 5.00060 666 6192REFL PAV MRK TY II (W) (WORD)EA 8.00061 666 6214REFL PAV MRK TY II (Y) 24" (SLD)LF 24.00062 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 3,900.00063 666 6306RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)LF 750.00064 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 2,794.00065 666 6323RE PM W/RET REQ TY II (W) 4" (SLD)LF 3,900.00066 666 6324RE PM W/RET REQ TY II (W) 6" (BRK)LF 750.00067 666 6327RE PM W/RET REQ TY II (Y) 4" (SLD)LF 2,794.00068 672 6007REFL PAV MRKR TY I-CEA 157.00069 677 6001ELIM EXT PAV MRK & MRKS (4")LF 1,803.00070 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00