COUNTY: TARRANT HIGHWAY: US 287 LENGTH: 1.9440MI CONTROL NUMBER: 0172-09-034 DBE GOAL: 5.0 % PROJECT NUMBER: STP 1702(732) TYPE: GR, BS, DR, STR, PAV TIME FOR COMPLETION: 128 WORKING DAYSGUARANTY: 43,000.00 BIDS RECEIVED UNTIL: 1:00 PM OCTOBER 04, 2017*EST.COST: 2,190,474.42 BIDS WILL BE OPENED: 1:00 PM OCTOBER 04, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONRANDY BOWERS ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2501 SW LOOP 820 200 E RIVERSIDEFORT WORTH, TX 76133 AUSTIN TX 78704-1204817/370-6640 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: LITTLE ROAD LIMITS TO: SOUTH OF SUBLETT ROAD ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 41.0001 104 6001REMOVING CONC (PAV)SY 1,256.0002 104 6029REMOVING CONC (CURB OR CURB & GUTTER)LF 941.0003 104 6044REMOVING CONC (FLUME)SY 402.0004 105 6014REMOVING STAB BASE & ASPH PAV (7"-12")SY 4,160.0005 110 6001EXCAVATION (ROADWAY)CY 6,881.1006 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 650.0007 132 6008EMBANKMENT (FINAL)(DENS CONT)(TY D)CY 6,845.8008 161 6017COMPOST MANUF TOPSOIL (4")SY 3,142.0009 162 6002BLOCK SODDINGSY 1,715.00010 164 6029CELL FBR MLCH SEED(TEMP)(WARM)SY 8,924.00011 164 6031CELL FBR MLCH SEED(TEMP)(COOL)SY 5,586.00012 168 6001VEGETATIVE WATERINGMG 677.90013 247 6041FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)CY 295.90014 260 6016LIME (HYD, COM, OR QK(SLURRY))TON 101.60015 260 6079LIME TRT (SUBGRADE)(6")SY 8,125.00016 310 6001PRIME COAT (MULTI OPTION)GAL 2,145.80017 341 6008D-GR HMA TY-B PG64-22TON 2,662.70018 341 6277D-GR HMA TY D PG 70-28(LATEX ADDITIVE)TON 325.70019 354 6049PLANE ASPH CONC PAV (6")SY 1,825.00020 360 6002CONC PVMT (CONT REINF - CRCP) (8")SY 3,978.00021 402 6001TRENCH EXCAVATION PROTECTIONLF 1,000.00022 420 6011CL B CONC (FLUME)CY 253.10023 432 6002RIPRAP (CONC)(5 IN)CY 339.70024 432 6046RIPRAP (MOW STRIP)(5 IN)CY 69.30025 464 6004RC PIPE (CL III)(21 IN)LF 91.30026 464 6005RC PIPE (CL III)(24 IN)LF 617.70027 464 6009RC PIPE (CL III)(42 IN)LF 290.50028 465 6002MANH (COMPL)(PRM)(48IN)EA 1.00029 465 6220INLET (COMPL)(DROP)(TY 3)EA 2.00030 467 6373SET (TY II) (21 IN) (RCP) (6: 1) (C)EA 2.00031 467 6394SET (TY II) (24 IN) (RCP) (6: 1) (C)EA 1.00032 467 6465SET (TY II) (42 IN) (RCP) (6: 1) (C)EA 1.00033 496 6002REMOV STR (INLET)EA 2.00034 496 6006REMOV STR (HEADWALL)EA 2.00035 496 6007REMOV STR (PIPE)LF 554.00036 500 6001MOBILIZATIONLS 1.00037 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.00038 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 160.00039 506 6024CONSTRUCTION EXITS (REMOVE)SY 160.00040 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 3,032.00041 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 3,032.00042 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 120.00043 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 120.00044 512 6017PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)LF 3,300.00045 512 6021PORT CTB (DES SOURCE)(LOW PROF)(TY 1)LF 2,190.00046 512 6022PORT CTB (DES SOURCE)(LOW PROF)(TY 2)LF 20.00047 512 6029PORT CTB (MOVE)(F-SHAPE)(TY 1)LF 1,380.00048 512 6033PORT CTB (MOVE)(LOW PROF)(TY 1)LF 1,740.00049 512 6034PORT CTB (MOVE)(LOW PROF)(TY 2)LF 20.00050 512 6041PORT CTB (STKPL)(F-SHAPE)(TY 1)LF 3,300.00051 512 6045PORT CTB (STKPL)(LOW PROF)(TY 1)LF 2,190.00052 512 6046PORT CTB (STKPL)(LOW PROF)(TY 2)LF 20.00053 529 6005CONC CURB (MONO) (TY II)LF 176.50054 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 1,186.00055 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 1.00056 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 1.00057 545 6001CRASH CUSH ATTEN (INSTL)EA 1.00058 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 1.00059 545 6005CRASH CUSH ATTEN (REMOVE)EA 1.00060 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 7.00061 644 6068RELOCATE SM RD SN SUP&AM TY 10BWGEA 7.00062 644 6076REMOVE SM RD SN SUP&AMEA 1.00063 647 6002RELOCATE LRSAEA 3.00064 658 6003INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BR)EA 19.00065 658 6019INSTL DEL ASSM (D-SY)SZ 1(FLX)GND(BR)EA 36.00066 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 20.00067 662 6063WK ZN PAV MRK REMOV (W)4"(SLD)LF 10,016.00068 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 6,863.00069 666 6054REFL PAV MRK TY I (W)(ARROW)(100MIL)EA 8.00070 666 6078REFL PAV MRK TY I (W)(WORD)(100MIL)EA 2.00071 666 6084REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)EA 1.00072 666 6224PAVEMENT SEALER 4"LF 17,665.00073 666 6226PAVEMENT SEALER 8"LF 501.00074 666 6231PAVEMENT SEALER (ARROW)EA 8.00075 666 6232PAVEMENT SEALER (WORD)EA 2.00076 672 6010REFL PAV MRKR TY II-C-REA 92.00077 677 6001ELIM EXT PAV MRK & MRKS (4")LF 1,196.00078 678 6001PAV SURF PREP FOR MRK (4")LF 17,665.00079 678 6004PAV SURF PREP FOR MRK (8")LF 501.00080 678 6009PAV SURF PREP FOR MRK (ARROW)EA 8.00081 678 6016PAV SURF PREP FOR MRK (WORD)EA 2.00082 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 110.00083 60386001MULTIPOLYMER PAV MRK (W)(4")(SLD)LF 3,075.00084 60386002MULTIPOLYMER PAV MRK (W)(4")(BRK)LF 7,148.00085 60386007MULTIPOLYMER PAV MRK (W)(8")(SLD)LF 501.00086 60386014MULTIPOLYMER PAV MRK (Y)(4")(SLD)LF 7,442.00087 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $23,000.00