COUNTY: CARSON HIGHWAY: US 60 LENGTH: 8.7730MI CONTROL NUMBER: 0169-05-042 DBE GOAL: 0.0 % PROJECT NUMBER: NH 2013(614) TYPE: REHAB EXISTING ROADWAY TIME FOR COMPLETION: 125 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM FEBRUARY 02, 2018*EST.COST: 12,685,031.95 BIDS WILL BE OPENED: 1:00 PM FEBRUARY 02, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONWESLEY KIMMELL ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 PO BOX 1136 200 E RIVERSIDEPAMPA, TX 79066 AUSTIN TX 78704-1204806/665-2374 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: CR W WEST OF WHITE DEER LIMITS TO: GRAY COUNTY LINE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6001PREPARING ROWAC 18.5401 134 6001BACKFILL (TY A)STA 807.4602 164 6036DRILL SEEDING (PERM) (RURAL) (CLAY)AC 18.5403 164 6053DRILL SEEDING (TEMP)(WARM OR COOL)AC 18.5404 275 6001CEMENTTON 808.0005 310 6009PRIME COAT (MC-30)GAL 56,074.0006 314 6004EMULS ASPH (BS OR SUBGR TRT)(CSS-1)GAL 632,501.0007 314 6009EMULS ASPH (EROSN CONT)(MULTI)GAL 5,607.0008 316 6011ASPH (AC-10)GAL 89,716.0009 316 6175AGGR(TY-B GR-4 SAC-B)CY 2,039.00010 341 6009D-GR HMA TY-B PG64-28TON 44,277.00011 344 6051SUPERPAVE MIXTURES SP-C SAC-A PG70-28TON 46,617.00012 354 6021PLANE ASPH CONC PAV(0" TO 2")SY 11,895.00013 354 6048PLANE ASPH CONC PAV (3")SY 224,292.00014 354 6057PLANE ASPH CONC PAV (4")SY 33,043.00015 500 6001MOBILIZATIONLS 1.00016 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00017 533 6001RUMBLE STRIPS (SHOULDER)LF 148,464.00018 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 200.00019 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 1.00020 540 6017MTL BM GD FEN (LONG SPAN SYSTEM)LF 50.00021 542 6001REMOVE METAL BEAM GUARD FENCELF 210.00022 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 1.00023 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 1.00024 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 1.00025 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 12.00026 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 144.00027 644 6010IN SM RD SN SUP&AM TY10BWG(1)SB(P-BM)EA 4.00028 644 6028IN SM RD SN SUP&AM TYS80(1)SA(P-BM)EA 28.00029 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 10.00030 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 8.00031 644 6045IN SM RD SN SUP&AM TYS80(1)SB(U-1EXT)EA 4.00032 644 6076REMOVE SM RD SN SUP&AMEA 178.00033 658 6001INSTL DEL ASSM (D-SW)SZ 1(FLX)GNDEA 31.00034 658 6018INSTL DEL ASSM (D-SY)SZ 1(FLX)GNDEA 79.00035 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 195,240.00036 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 106,730.00037 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 6,950.00038 666 6035REFL PAV MRK TY I (W)8"(SLD)(090MIL)LF 6,040.00039 666 6053REFL PAV MRK TY I (W)(ARROW)(090MIL)EA 26.00040 666 6098REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)EA 68.00041 666 6299RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)LF 23,339.00042 666 6302RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)LF 91,543.00043 666 6311RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)LF 3,255.00044 666 6314RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)LF 90,861.00045 30036008EMUL TRTMNT(MX EXST MTRL & NEW BASE) 8"SY 224,295.00046 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $30,000.00