COUNTY: NAVARRO HIGHWAY: SH 31 LENGTH: 34.1930MI CONTROL NUMBER: 0162-03-042, ETCDBE GOAL: 0.0 % PROJECT NUMBER: STP 2019(930)HES TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 376 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM MAY 08, 2019 EST.COST: 7,007,306.67 BIDS WILL BE OPENED: 1:00 PM MAY 08, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJUAN A. PAREDES, P.E ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 100 SW CR 1000 200 E RIVERSIDECORSICANA, TX 75110 AUSTIN TX 78704-1204903/874-4351 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ NAVARRO0162-03-042HILL C/L SH 31STP 2019(930)HES0.221 MI W OF NW CR 3180 LENGTH: 2.2460 MILES NAVARRO0162-03-0430.458 MI E OF FM 709 SH 31STP 2019(930)HESFM 55 LENGTH: 6.3150 MILES NAVARRO0162-04-060FM 55 SH 31STP 2019(930)HESBALCO LN LENGTH: 8.3320 MILES NAVARRO0163-01-067S 1ST SH 31STP 2019(930)HESFM 1129 LENGTH: 6.3440 MILES NAVARRO0163-02-040MARGARET DR SH 31STP 2019(930)HESWEST OF HENDERSON C/L LENGTH: 6.4950 MILES NAVARRO0163-01-068BROOKSHIRE ST SH 31STP 2019(930)HESFM 1393 LENGTH: 1.8010 MILES NAVARRO0163-02-041FM 1393 SH 31STP 2019(930)HES0.027 MI E OF NE CR 2240 LENGTH: 2.66 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 693.0001 161 6017COMPOST MANUF TOPSOIL (4")SY 128,474.0002 164 6023CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)SY 128,474.0003 168 6001VEGETATIVE WATERINGMG 11,148.0004 432 6045RIPRAP (MOW STRIP)(4 IN)CY 6,249.0005 500 6001MOBILIZATIONLS 1.0006 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 18.0007 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 546.0008 506 6024CONSTRUCTION EXITS (REMOVE)SY 546.0009 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 1,989.00010 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 1,989.00011 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 1,760.00012 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 1,760.00013 543 6002CABLE BARRIER SYSTEM (TL-4)LF 168,738.00014 543 6020CABLE BARRIER TERMINAL SECTION (TL-4)EA 214.00015 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00016 61856001TMA (STATIONARY)EA 3.00017