COUNTY: WILSON HIGHWAY: US 87 LENGTH: 2.5170MI CONTROL NUMBER: 0143-03-044 DBE GOAL: 3.0 % PROJECT NUMBER: NH 2018(530) TYPE: GR, BASE, SURF, PVMT MRKINGS TIME FOR COMPLETION: 103 WORKING DAYSGUARANTY: 80,000.00 BIDS RECEIVED UNTIL: 1:00 PM FEBRUARY 02, 2018*EST.COST: 4,030,996.90 BIDS WILL BE OPENED: 1:00 PM FEBRUARY 02, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONWILL LOCKETT, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 4102 IH 35 SOUTH 200 E RIVERSIDENEW BRAUNFELS, TX 78132 AUSTIN TX 78704-1204830/609-0707 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 2.5 MI N OF FM 539 LIMITS TO: FM 539 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 134.0001 105 6008REMOVING STAB BASE AND ASPH PAV (6")SY 72,009.0002 110 6001EXCAVATION (ROADWAY)CY 1,306.0003 110 6002EXCAVATION (CHANNEL)CY 10.0004 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 246.0005 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 14,644.0006 164 6066DRILL SEEDING (PERM)(WARM OR COOL)SY 14,644.0007 168 6001VEGETATIVE WATERINGMG 234.3008 169 6001SOIL RETENTION BLANKETS (CL 1) (TY A)SY 881.0009 310 6001PRIME COAT (MULTI OPTION)GAL 14,669.00010 316 6410ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)GAL 22,253.00011 316 6447AGGR (TY-PD GR-4 OR GR-4S SAC-B)CY 741.00012 341 6010D-GR HMA TY-B PG70-22TON 23,503.00013 341 6270D-GR HMA TY-B PG70-22 (LEVEL - UP)TON 985.00014 344 6135SUPERPAVE MIXTURES SP-D SAC-A PG76-22TON 8,085.00015 351 6026FLEX PAVEMENT STRUCTURE REPAIR (5"-10")SY 400.00016 354 6021PLANE ASPH CONC PAV(0" TO 2")SY 1,608.00017 354 6023PLANE ASPH CONC PAV(0" TO 4")SY 503.00018 400 6005CEM STABIL BKFLCY 54.00019 402 6001TRENCH EXCAVATION PROTECTIONLF 134.00020 403 6001TEMPORARY SPL SHORINGSF 464.00021 416 6032DRILL SHAFT (TRF SIG POLE) (36 IN)LF 26.40022 432 6001RIPRAP (CONC)(4 IN)CY 20.00023 432 6032RIPRAP (STONE PROTECTION)(15 IN)CY 64.00024 432 6045RIPRAP (MOW STRIP)(4 IN)CY 38.00025 450 6018RAIL (TY T631)LF 42.00026 462 6002CONC BOX CULV (3 FT X 3 FT)LF 4.00027 462 6005CONC BOX CULV (4 FT X 4 FT)LF 2.00028 464 6005RC PIPE (CL III)(24 IN)LF 134.00029 467 6112SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)EA 2.00030 467 6150SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)EA 1.00031 467 6391SET (TY II) (24 IN) (RCP) (4: 1) (P)EA 5.00032 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 5.00033 480 6001CLEAN EXIST CULVERTSEA 4.00034 496 6004REMOV STR (SET)EA 10.00035 496 6007REMOV STR (PIPE)LF 175.00036 500 6001MOBILIZATIONLS 1.00037 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.00038 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 399.00039 506 6011ROCK FILTER DAMS (REMOVE)LF 399.00040 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 23,946.00041 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 23,946.00042 510 6001ONE-WAY TRAF CONT (FLAGGER CONT)HR 800.00043 510 6002ONE-WAY TRAF CONT (PILOT CAR)HR 800.00044 512 6001PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)LF 900.00045 512 6025PORT CTB (MOVE)(SGL SLP)(TY 1)LF 600.00046 512 6049PORT CTB (REMOVE)(SGL SLP)(TY 1)LF 900.00047 530 6004DRIVEWAYS (CONC)SY 225.00048 530 6005DRIVEWAYS (ACP)SY 973.00049 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 862.50050 540 6014SHORT RADIUSLF 20.00051 540 6015DRIVEWAY TERMINAL ANCHOR SECTIONEA 1.00052 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 4.00053 542 6001REMOVE METAL BEAM GUARD FENCELF 1,131.50054 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 4.00055 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00056 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00057 545 6001CRASH CUSH ATTEN (INSTL)EA 6.00058 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 4.00059 545 6005CRASH CUSH ATTEN (REMOVE)EA 6.00060 621 6005TRAY CABLE (4 CONDR) (12 AWG)LF 240.00061 625 6002ZINC-COAT STL WIRE STRAND (3/16")LF 430.00062 625 6004ZINC-COAT STL WIRE STRAND (5/16")LF 430.00063 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 28.00064 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 4.00065 644 6027IN SM RD SN SUP&AM TYS80(1)SA(P)EA 2.00066 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 3.00067 644 6076REMOVE SM RD SN SUP&AMEA 35.00068 658 6001INSTL DEL ASSM (D-SW)SZ 1(FLX)GNDEA 5.00069 658 6002INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)EA 11.00070 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 19.00071 658 6060REMOVE DELIN & OBJECT MARKER ASSMSEA 38.00072 662 6048WK ZN PAV MRK REMOV (REFL) TY I-CEA 409.00073 662 6050WK ZN PAV MRK REMOV (REFL) TY II-A-AEA 753.00074 662 6056WK ZN PAV MRK REMOV (TRAF BTN) TY WEA 2,401.00075 662 6058WK ZN PAV MRK REMOV (TRAF BTN) TY YEA 4,540.00076 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 1,779.00077 662 6110WK ZN PAV MRK SHT TERM (TAB)TY YEA 1,351.00078 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 154.00079 666 6072REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)EA 2.00080 666 6224PAVEMENT SEALER 4"LF 42,670.00081 666 6230PAVEMENT SEALER 24"LF 154.00082 666 6237PAVEMENT SEALER (LNDP ARROW)EA 2.00083 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 1,145.00084 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 2,841.00085 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 2,736.00086 666 6342REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)LF 23,566.00087 666 6344REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)LF 2,286.00088 666 6345REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)LF 10,096.00089 672 6007REFL PAV MRKR TY I-CEA 62.00090 672 6009REFL PAV MRKR TY II-A-AEA 301.00091 677 6001ELIM EXT PAV MRK & MRKS (4")LF 10,312.00092 680 6001INSTALL HWY TRF SIG (FLASH BEACON)EA 1.00093 680 6004REMOVING TRAFFIC SIGNALSEA 1.00094 682 6003VEH SIG SEC (12")LED(YEL)EA 8.00095 682 6005VEH SIG SEC (12")LED(RED)EA 8.00096 684 6009TRF SIG CBL (TY A)(12 AWG)(4 CONDR)LF 564.00097 686 6007INS TRF SIG PL AM (S)STR(TY B)EA 2.00098 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 4.00099 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00