COUNTY: LEE, ETCHIGHWAY: US 290, ETCLENGTH: 13.6300MI CONTROL NUMBER: 0114-07-082, ETCDBE GOAL: 0.0 % PROJECT NUMBER: STP 1702(665)HES, ETC TYPE: INSTALL MEDIAN BARRIER TIME FOR COMPLETION: 118 WORKING DAYSGUARANTY: 30,000.00 BIDS RECEIVED UNTIL: 1:00 PM AUGUST 09, 2017 EST.COST: 1,529,924.55 BIDS WILL BE OPENED: 1:00 PM AUGUST 09, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONDIANA SCHULZE ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 174 SH 21 EAST 200 E RIVERSIDEBASTROP, TX 78602 AUSTIN TX 78704-1204512/321-2195 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ LEE0114-07-0820.690 MI EAST OF CR 226 US 290STP 1702(665)HESLEE/FAYETTE COUNTY LINE LENGTH: 5.4810 MILES BASTROP0265-03-050TRAVIS/BASTROP COUNTY LINE SH 71STP 1702(666)HESSH 21 LENGTH: 8.1490 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 150 6001BLADINGSTA 655.1601 164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY 43,475.0002 168 6001VEGETATIVE WATERINGMG 871.0003 432 6045RIPRAP (MOW STRIP)(4 IN)CY 2,429.0004 500 6001MOBILIZATIONLS 1.0005 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 8.0006 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 1,000.0007 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 1,000.0008 543 6002CABLE BARRIER SYSTEM (TL-4)LF 62,742.0009 543 6020CABLE BARRIER TERMINAL SECTION (TL-4)EA 84.00010 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00011