COUNTY: KAUFMAN HIGHWAY: US 80 LENGTH: 14.0230MI CONTROL NUMBER: 0095-03-093, ETCSBE GOAL: 0.0 % PROJECT NUMBER: C 95-3-93, ETC TYPE: BASE REPAIR AND OVERLAY TIME FOR COMPLETION: 170 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 05, 2018 EST.COST: 9,937,840.31 BIDS WILL BE OPENED: 1:00 PM JUNE 05, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJEFF BUSH, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2750 S WASHINGTON 200 E RIVERSIDEKAUFMAN, TX 751423647 AUSTIN TX 78704-1204972/962-3617 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ KAUFMAN0095-03-093DALLAS COUNTY LINE US 80C 95-3-93FM 548 LENGTH: 5.33 MILES KAUFMAN0095-04-070FM 548 US 80C 95-4-70SP 557 LENGTH: 5.2420 MILES KAUFMAN0095-03-094DALLAS C/L US 80C 95-3-94FM740 LENGTH: 3.4510 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 123.5201 104 6017REMOVING CONC (DRIVEWAYS)SY 381.0002 110 6001EXCAVATION (ROADWAY)CY 58.0003 112 6001SUBGRADE WIDENING (ORD COMP)STA 50.3504 132 6025EMBANKMENT (FINAL) (DENS CONT) (TY C1)CY 717.0005 134 6004BACKFILL (TY A OR B)STA 1,335.9406 152 6001ROAD GRADER WORK (ORD COMP)STA 119.5407 164 6039DRILL SEEDING (PERM) (URBAN) (CLAY)SY 26,562.0008 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 6,641.0009 168 6001VEGETATIVE WATERINGMG 2,882.00010 247 6073FL BS (CMP IN PLC)(TY D GR 1-2) (6")SY 23,567.00011 247 6304FL BS (CMP IN PLACE) (TY D GR 1-2)(10")SY 1,843.00012 251 6001REWORK BS MTL (TY A) (6") (ORD COMP)STA 66.26013 275 6001CEMENTTON 80.00014 275 6026CEMENT TREAT (EXIST MATL) (5")SY 18,416.00015 305 6014SALV,HAUL& STKPL RCL APH PV(VAR DEPTH)SY 1,843.00016 314 6006EMULS ASPH (BS OR SUBGR TRT)(MS-2)GAL 5,170.00017 316 6024ASPH (CRS-2P)GAL 4,630.00018 316 6029ASPH (RC-250)GAL 1,871.00019 316 6403AGGR (TY-B GR-5 OR TY-L GR-5)CY 53.00020 316 6419ASPH (AC-15P, AC-20-5TR OR AC-20XP)GAL 3,889.00021 316 6440AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)CY 179.00022 344 6034SUPERPAVE MIXTURES SP-C PG64-22TON 4,388.00023 344 6167SUPERPAVE MIXTURES SP-B SAC-B PG64-22TON 2,720.00024 346 6002STONE-MTRX-ASPH SMA-C SAC-A PG76-22TON 61,598.30025 351 6008FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")SY 1,725.00026 354 6021PLANE ASPH CONC PAV(0" TO 2")SY 513,270.00027 361 6035FULL - DEPTH REPAIR CPCD (10")SY 300.00028 464 6003RC PIPE (CL III)(18 IN)LF 180.00029 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 8.00030 496 6004REMOV STR (SET)EA 6.00031 496 6007REMOV STR (PIPE)LF 142.00032 500 6001MOBILIZATIONLS 1.00033 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 10.00034 506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF 240.00035 506 6011ROCK FILTER DAMS (REMOVE)LF 240.00036 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 10,565.00037 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 10,565.00038 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 120.00039 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 120.00040 530 6005DRIVEWAYS (ACP)SY 283.00041 530 6017DRIVEWAYS (CONC) (HES)SY 459.00042 533 6001RUMBLE STRIPS (SHOULDER)LF 209,105.00043 540 6001MTL W-BEAM GD FEN (TIM POST)LF 12,875.00044 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 32.00045 540 6008MTL BEAM GD FEN TRANS (T101)EA 38.00046 542 6001REMOVE METAL BEAM GUARD FENCELF 11,350.00047 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 22.00048 542 6005RM MTL BM GD FEN TRANS (T101)EA 27.00049 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 105.00050 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 94.00051 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 2.00052 658 6052INSTL OM ASSM (OM-3L)(FLX)GNDEA 41.00053 658 6056INSTL OM ASSM (OM-3R)(FLX)GNDEA 53.00054 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 232.00055 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 8,542.00056 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 102.00057 666 6054REFL PAV MRK TY I (W)(ARROW)(100MIL)EA 4.00058 666 6078REFL PAV MRK TY I (W)(WORD)(100MIL)EA 8.00059 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 29,160.00060 666 6306RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)LF 137,393.00061 666 6309RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)LF 14,815.00062 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 134,682.00063 672 6010REFL PAV MRKR TY II-C-REA 1,557.00064 730 6107FULL - WIDTH MOWINGCYC 6.00065 130026001MEMBRANE UNDERSEALGAL 99,553.00066 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00067 61856001TMA (STATIONARY)EA 2.00068 1A30196001TRACKLESS TACK COATGAL 99,553.00069