COUNTY: NOLAN HIGHWAY: US 84 LENGTH: 4.7560MI CONTROL NUMBER: 0053-12-065 DBE GOAL: 0.0 % PROJECT NUMBER: NH 2018(551) TYPE: ROADWAY REHABILITATION / ARMORING TIME FOR COMPLETION: 97 WORKING DAYSGUARANTY: 68,000.00 BIDS RECEIVED UNTIL: 1:00 PM FEBRUARY 01, 2018*EST.COST: 3,428,904.83 BIDS WILL BE OPENED: 1:00 PM FEBRUARY 01, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONEKDAHL WAYNE ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 1301 N HWY 350 200 E RIVERSIDEBIG SPRING, TX 79720 AUSTIN TX 78704-1204432/263-4768 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 1360 FT EAST OF MITCHELL CNTY (EBL) LIMITS TO: 5 MI EAST OF MITCHELL COUNTY LINE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6054REMOVING CONCRETE(MOW STRIP)LF 465.0001 134 6002BACKFILL (TY B)STA 252.0002 275 6001CEMENTTON 327.0003 275 6002CEMENT TREAT (EXIST MATL) (6")SY 36,270.0004 310 6009PRIME COAT (MC-30)GAL 7,254.0005 316 6001ASPH (MULTI OPTION)GAL 51,021.0006 316 6175AGGR(TY-B GR-4 SAC-B)CY 965.0007 344 6014SUPERPAVE MIXTURES SP-B PG70-22TON 8,977.0008 344 6120SUPERPAVE MIXTURES SP-D SAC-B PG70-22TON 7,309.0009 346 6015STONE-MTRX-ASPH SMA-D SAC-A PG76-28TON 9,151.00010 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 1,000.00011 354 6041PLANE ASPH CONC PAV (1.5")SY 88,093.00012 354 6091PLANE ASPH CONC PAV(4.5")SY 36,270.00013 354 6139PLANE ASPH CONC PAV (1.5" TO 3")SY 501.00014 432 6046RIPRAP (MOW STRIP)(5 IN)CY 28.00015 500 6001MOBILIZATIONLS 1.00016 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.00017 533 6001RUMBLE STRIPS (SHOULDER)LF 49,769.00018 540 6001MTL W-BEAM GD FEN (TIM POST)LF 475.00019 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 1.00020 542 6001REMOVE METAL BEAM GUARD FENCELF 475.00021 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 1.00022 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 1.00023 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 1.00024 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 4.00025 662 6001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF 12,555.00026 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 2,511.00027 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 660.00028 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 6,350.00029 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 25,130.00030 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 25,140.00031 668 6092PREFAB PAV MRK TY C (W) (36")(YLD TRI)EA 60.00032 672 6006REFL PAV MRKR TY I-AEA 109.00033 672 6010REFL PAV MRKR TY II-C-REA 381.00034 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00035 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,100.00