COUNTY: PRESIDIO, ETCHIGHWAY: US 90, ETCLENGTH: 177.3730MI CONTROL NUMBER: 0020-06-017, ETCDBE GOAL: 0.0 % PROJECT NUMBER: NH 2018(338), ETC TYPE: PREVENTATIVE MAINTENANCE TIME FOR COMPLETION: 80 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 05, 2017 EST.COST: 9,971,176.81 BIDS WILL BE OPENED: 1:00 PM DECEMBER 05, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCHRIS WEBER ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2400 N HWY 118 200 E RIVERSIDEALPINE, TX 79830 AUSTIN TX 78704-1204432/837-3391 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ PRESIDIO0020-06-017JEFF DAVIS/PRESIDIO COUNTY LINE US 90NH 2018(338)12.96 MI W OF RM 2810 LENGTH: 14.0120 MILES PRESIDIO0020-07-03112.96 MI E OF RM 2810 US 90NH 2018(338)US 67 LENGTH: 13.71 MILES BREWSTER0485-01-025US 90 US 385STP 2018(339)15.268 MI N OF RM 2627 LENGTH: 23.5570 MILES BREWSTER0485-02-01715.268 MI N OF RM 2627 US 385STP 2018(339)0.814 MI S OF RM 2627 LENGTH: 16.0240 MILES PRESIDIO0020-08-0440.403 MI E OF US 67/90 INTERSECTION US 67NH 2018(338)US 67/90 INTERSECTION LENGTH: 0.4030 MILES HUDSPETH0374-04-034EL PASO/HUDSPETH COUNTY LINE US 62NH 2018(338)1.982 MI E OF EL PASO/HUDSPETH CL LENGTH: 2.06 MILES EL PASO0374-03-0291.476 MI W OF RM 2775 US 62NH 2018(338)EL PASO/HUDSPETH COUNTY LINE LENGTH: 5.6550 MILES EL PASO0374-02-1052.640 MI W OF RM 2775 US 62NH 2018(338)1.476 MI W OF RM 2775 LENGTH: 1.1640 MILES PRESIDIO0104-06-0261.84 MI S OF US 90 US 67NH 2018(338)9.08 MI S OF FM 169 LENGTH: 15.18 MILES PRESIDIO0104-07-0239.08 MI S OF RM 169 US 67NH 2018(338)23.92 MI N OF FM 170 LENGTH: 17.1140 MILES BREWSTER0358-03-0390.03 MI N OF US 67 SH 118STP 2018(339)30.5 MI S OF US 67 LENGTH: 29.9930 MILES BREWSTER0358-04-01830.5 MI S OF US 67 SH 118STP 2018(339)17.3 MI N OF FM 170 LENGTH: 30.1140 MILES CULBERSON0233-01-0489.03 MI N OF SH 54 US 62NH 2018(338)NM/TX STATE LINE LENGTH: 8.3870 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 316 6004ASPH (TIER I)GAL 310,763.0001 316 6005ASPH (TIER II)GAL 518,745.0002 316 6126AGGR(TY-PB GR-4 SAC-A)CY 38,213.0003 316 6405ASPH (AC-20-5TR OR AC-20XP)GAL 1,272,062.0004 500 6001MOBILIZATIONLS 1.0005 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 4.0006 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 17,964.0007 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 206,260.0008 666 6170REFL PAV MRK TY II (W) 4" (SLD)LF 1,874,018.0009 666 6171REFL PAV MRK TY II (W) 6" (BRK)LF 54,156.00010 666 6174REFL PAV MRK TY II (W) 6" (SLD)LF 2,660.00011 666 6182REFL PAV MRK TY II (W) 24" (SLD)LF 686.00012 666 6184REFL PAV MRK TY II (W) (ARROW)EA 8.00013 666 6192REFL PAV MRK TY II (W) (WORD)EA 6.00014 666 6196REFL PAV MRK TY II (W) (RR XING)EA 4.00015 666 6199REFL PAV MRK TY II (W) 36" (YLD TRI)EA 8.00016 666 6205REFL PAV MRK TY II (Y) 4" (BRK)LF 266,194.00017 666 6207REFL PAV MRK TY II (Y) 4" (SLD)LF 1,156,173.00018 666 6212REFL PAV MRK TY II (Y) 12" (SLD)LF 324.00019 668 6055PRE PM TY B(ACC PRK)(BL&WH)(W/BORDR)LGEA 2.00020 672 6009REFL PAV MRKR TY II-A-AEA 19,506.00021 672 6012TRAFFIC BUTTON TY I-CEA 978.00022 677 6001ELIM EXT PAV MRK & MRKS (4")LF 830,430.00023