1MIS.CIS.01 CONTRACT TIME STATEMENT CONTRACT 7114010 MGR.NO. 006 PAGE 001 CONT 6225 SEC 77 JOB 001 RES ENGR CLARK, JOHN PAUL PROJ RMC - 622577001 HWY FM1291 2000 E SH 71 BYPASS LA GR CNTY FAYETTE DIST 13 CONTRACT PRICE $ 2,387,300.52 REPORT DATE 06/25/2012 08.47.43 CONTRACTOR BIG CREEK CONSTRUCTION, LTD. 8175 EST PERIOD SEP 26,2011 TO JUN 15,2012 EST NO 010 & FINAL --------------------------------------------------------------------------------------------------------- DATE WORK BEGAN SEP 26, 2011 TIME COMPUTED FROM SEP 26, 2011 SUMMARY INFORMATION 0 DATE WORKING REASONS FOR DAYS CREDITED MONTH/YEAR OR DAYS DAYS /COMMENTS FOR DAYS CHARGED PHASE I DAYS CHARGED CREDITED CONTRACT WORK DAYS = 105 249 99 150 BROUGHT FORWARD ADDL DAYS GRANTED = 0 JUN 12 1 1 RAIN TOTAL DAYS ALLOWED = 105 2 1 SATURDAY DATE WORK COMPLETED 06/15/12 3 1 SUNDAY DAYS CHARGED TO DATE = 101 4 1 CONTRACTOR MOBILIZING FOR PUNCHLIST ASSESSED LIQ DAMAGES = 0 5 1 LIQ DAMAGE RATE $ 800 6 1 7 1 AWAITING DCE INSPECTION LIQUIDATED DAMAGES 8 1 WORKING ON PUNCHLIST 0 DAYS AT $ 800 PER DAY 9 1 SATURDAY TOTAL = $ .00 10 1 SUNDAY 11 1 WORKING ON PUNCHLIST CERTIFIED AS CORRECT AND 12 1 RAIN ONE COPY HAS BEEN GIVEN 13 1 TOO WET TO THE CONTRACTOR 14 1 AWAITING DCE INSPECTION 15 1 WORK COMPLETED AND ACCEPTED ---------------------------- AREA/PROJECT ENGINEER - - - - - ----- ----- ----- 264 101 163 2 SATURDAY 2 SUNDAY 0 HOLIDAY 2 RAIN 1 CONTRACTOR MOBILIZING FOR PUNCHLIST 2 AWAITING DCE INSPECTION 2 WORKING ON PUNCHLIST 1 TOO WET 1 WORK COMPLETED AND ACCEPTED 1MIS.CIS.03 CONSTRUCTN ESTIMATE BREAKDOWN CONTRACT 7114010 MGR.NO. 006 PAGE 001 CONT 6225 SEC 77 JOB 001 RES ENGR CLARK, JOHN PAUL PROJ RMC - 622577001 HWY FM1291 2000 E SH 71 BYPASS LA GR CNTY FAYETTE DIST 13 CONTRACT PRICE $ 2,387,300.52 REPORT DATE 06/25/2012 08.47.44 CONTRACTOR BIG CREEK CONSTRUCTION, LTD. 8175 EST PERIOD SEP 26,2011 TO JUN 15,2012 EST NO 010 & FINAL DIST. 13 COUNTY FAYETTE CONTROL 6225-77-001 PROJECT RMC - 622577001 HIGHWAY FM1291 0LIMITS- WALDECK SH 237 0TYPE OF WORK- RESTORE ROADWAY 0 0050 REHAB ROADWAY NET LENGTH 5.355 MILES 0 LINE ITEM ESTIMATED WORK DONE CONTRACT AMOUNT NO. NO. DESCRIPTION UNIT QUANTITIES ON CONTRACT PRICE($) ($) - 0070 DESIGNED BY DISTRICT DESIGN 5/2011 0 0075 0110 EXCAVATION (ROADWAY) CY 1,740.000 1,740.000 10.000 17,400.00 0080 0112 SUBGRADE WIDENING (ORD COMP) STA 269.930 269.930 500.000 134,965.00 0085 0132 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 9,425.000 304.000 1.000 304.00 0090 0150 BLADING HR 20.000 0.000 100.000 .00 0095 0164 STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY) AC 20.800 12.090 795.000 9,611.55 0100 0164 STRAW/HAY MLCH SEED(TEMP)(WARM) AC 5.200 0.000 750.000 .00 0105 0164 STRAW/HAY MLCH SEED(TEMP)(COOL) AC 5.200 0.000 750.000 .00 0110 0168 VEGETATIVE WATERING MG 282.500 0.000 10.000 .00 0115 0247 FL BS (CMP IN PLC)(TY A GR 2)(FNAL POS) CY 14,029.000 14,088.460 45.000 633,980.70 0120 0260 LIME TRT (EXST MATL) (6") SY 10,000.000 11,744.400 1.750 20,552.70 0125 0260 LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON 119.000 140.380 150.000 21,057.00 0130 0275 CEMENT TON 1,603.000 1,599.400 100.000 159,940.00 0135 0275 CEMENT TREAT(EXIST MATL)(8") SY 98,975.000 98,974.650 1.500 148,461.98 0140 0316 ASPH (RC-250) GAL 17,840.000 17,525.000 3.850 67,471.25 0145 0316 AGGR(TY-PB GR-4 SAC-B) CY 743.000 714.000 80.000 57,120.00 0150 0316 AGGR (TY-PB GR-3) CY 1,049.000 1,093.000 80.000 87,440.00 0155 0316 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 66,006.000 53,350.000 3.500 186,725.00 0160 0316 AGGR (TY-E GR-5) CY 637.000 652.000 70.000 45,640.00 0165 0400 CEM STABIL BKFL CY 118.000 118.000 120.000 14,160.00 0170 0400 CUT & RESTORING PAV SY 90.000 0.000 60.000 .00 0175 0402 TRENCH EXCAVATION PROTECTION LF 50.000 50.000 5.000 250.00 0180 0403 TEMPORARY SPL SHORING SF 565.000 565.000 30.000 16,950.00 1 0185 0432 RIPRAP (CONC)(5 IN) CY 54.800 57.500 325.000 18,687.50 0190 0452 REMOVE RAIL (TY 6) LF 100.000 100.000 10.000 1,000.00 0195 0460 CMP (GAL STL 24 IN) LF 60.000 120.000 70.000 8,400.00 0200 0462 CONC BOX CULV (5 FT X 4 FT) LF 64.000 64.000 425.000 27,200.00 0205 0462 CONC BOX CULV (6 FT X 6 FT) LF 6.000 6.000 850.000 5,100.00 0210 0462 CONC BOX CULV (7 FT X 4 FT) LF 15.000 15.000 600.000 9,000.00 0215 0462 CONC BOX CULV (8 FT X 5 FT) LF 8.000 8.000 900.000 7,200.00 0220 0464 RC PIPE (CL III)(15 IN) LF 142.000 142.000 40.000 5,680.00 0225 0464 RC PIPE (CL III)(18 IN) LF 316.000 316.000 45.000 14,220.00 0230 0464 RC PIPE (CL III)(24 IN) LF 214.000 214.000 50.000 10,700.00 0235 0464 RC PIPE (CL III)(30 IN) LF 36.000 36.000 75.000 2,700.00 0240 0467 SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1)(C) EA 6.000 6.000 4,000.000 24,000.00 0245 0467 SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1)(C) EA 2.000 2.000 5,500.000 11,000.00 0250 0467 SET (TY I)(S= 7 FT)(HW= 5 FT)(3:1)(C) EA 1.000 1.000 4,500.000 4,500.00 0255 0467 SET (TY I)(S= 7 FT)(HW= 6 FT)(3:1)(C) EA 5.000 5.000 5,000.000 25,000.00 0260 0467 SET (TY I)(S= 7 FT)(HW= 7 FT)(3:1)(C) EA 4.000 4.000 7,500.000 30,000.00 0265 0467 SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1)(C) EA 2.000 2.000 8,500.000 17,000.00 0270 0467 SET (TY II)(15 IN)(RCP)(6:1)(P) EA 6.000 6.000 650.000 3,900.00 0275 0467 SET (TY II)(18 IN)(RCP)(6:1)(P) EA 22.000 22.000 750.000 16,500.00 0280 0467 SET (TY II)(24 IN)(RCP)(6:1)(P) EA 12.000 12.000 800.000 9,600.00 0285 0467 SET (TY II)(30 IN)(RCP)(6:1)(P) EA 2.000 2.000 1,500.000 3,000.00 0286 0467*SET (TY II)(24 IN)(CMP)(6:1)(P) EA 4.000 4.000 800.000 3,200.00 0290 0496 REMOV STR (BOX CULVERT) EA 1.000 1.000 2,500.000 2,500.00 0295 0496 REMOV STR (PIPE) EA 24.000 26.000 200.000 5,200.00 0300 0500 MOBILIZATION LS 1.000 1.000 220,000.000 220,000.00 0305 0502 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 7.000 2,000.000 14,000.00 0310 0506 ROCK FILTER DAMS (INSTALL) (TY 1) LF 300.000 275.000 21.000 5,775.00 0315 0506 ROCK FILTER DAMS (REMOVE) LF 300.000 275.000 5.000 1,375.00 0320 0506 BACKHOE WORK (EROSION & SEDM CONT) HR 10.000 4.000 100.000 400.00 0325 0506 TEMPORARY SEDIMENT CONTROL FENCE LF 2,080.000 2,105.000 3.150 6,630.75 0330 0530 DRIVEWAYS (SURF TREAT) EA 59.000 60.000 500.000 30,000.00 0335 0542 REMOVING METAL BEAM GUARD FENCE LF 325.000 325.000 2.000 650.00 0340 0542 REMOVING TERMINAL ANCHOR SECTION EA 4.000 4.000 50.000 200.00 0345 0560 MAILBOX INSTALL-S (WC-POST) 1 TY 3 FND EA 11.000 10.000 100.000 1,000.00 0350 0560 MAILBOX INSTALL-D (WC-POST) TY 3 FND EA 2.000 2.000 150.000 300.00 0355 0560 MAILBOX INSTALL-M (TWW-POST)TY 4 FND-TB EA 5.000 5.000 425.000 2,125.00 0360 0644 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 9.000 12.000 250.000 3,000.00 0365 0644 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 5.000 5.000 400.000 2,000.00 0370 0644 IN SM RD SN SUP&AM TYS80(1)SA(U-WC) EA 3.000 3.000 500.000 1,500.00 0375 0644 IN SM RD SN SUP&AM TYTWT(1)WA(P) EA 25.000 25.000 170.000 4,250.00 0380 0644 IN SM RD SN SUP&AM TYTWT(1)WA(T) EA 11.000 8.000 200.000 1,600.00 0385 0644 REMOVE SM RD SN SUP & AM EA 53.000 53.000 50.000 2,650.00 0390 0658 INSTL OM ASSM (OM-2Z)(FLX)GND(BI) EA 14.000 14.000 45.000 630.00 0395 0662 WK ZN PAV MRK NON-REMOV (W) 4" (SLD) LF 113,112.000 0.000 .240 .00 0400 0662 WK ZN PAV MRK NON-REMOV (Y) 4" (BRK) LF 12,940.000 8,590.000 .280 2,405.20 0405 0662 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 34,094.000 30,338.000 .240 7,281.12 0410 0662 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 2,121.000 2,142.000 1.000 2,142.00 0415 0668 PREFAB PAV MRK TY C (W) (24") (SLD) LF 30.000 24.000 13.350 320.40 0420 0672 REFL PAV MRKR TY II-A-A EA 536.000 531.000 5.000 2,655.00 0425 0752 TREE TRIMMING MI 0.210 0.210 43,000.000 9,030.00 0430 0752 TREE TRIMMING/BRUSH REMOVAL MI 1.420 1.420 36,500.000 51,830.00 0435 8251 RE PM W/RET REQ TY I(W)4"(SLD)(100MIL) LF 56,556.000 56,495.000 .450 25,422.75 0440 8251 RE PM W/RET REQ TY I(Y)4"(BRK)(100MIL) LF 6,470.000 6,400.000 .500 3,200.00 0445 8251 RE PM W/RET REQ TY I(Y)4"(SLD)(100MIL) LF 17,047.000 16,688.000 .440 7,342.72 0 SUBTOTAL BID ITEMS $ 2,297,031.62 0 TOTAL AMOUNT WORK DONE REHAB ROADWAY $ 2,297,031.62 0 TOTAL AMOUNT WORK DONE CONTROL 6225-77-001 $ 2,297,031.62 0 * ITEMS ADDED IN ACCORDANCE WITH STANDARD SPECIFICATIONS OR BY SUPPLEMENTAL AGREEMENTS 1MIS.CIS.04 CONSTRUCTION ESTIMATE COMBINED CONTRACT 7114010 MGR.NO. 006 PAGE 001 CONT 6225 SEC 77 JOB 001 RES ENGR CLARK, JOHN PAUL PROJ RMC - 622577001 HWY FM1291 2000 E SH 71 BYPASS LA GR CNTY FAYETTE DIST 13 CONTRACT PRICE $ 2,387,300.52 REPORT DATE 06/25/2012 08.47.45 CONTRACTOR BIG CREEK CONSTRUCTION, LTD. 8175 EST PERIOD SEP 26,2011 TO JUN 15,2012 EST NO 010 & FINAL 0*********************************************************************************************************************************** -LIMITS - WALDECK 0 SH 237 DATE WORK BEGAN SEP 26, 2011 WORKING DAYS USED 101 PERCENT COMPLETE 100.00 PERCENT TIME USED 96.10 DATE COMPLETED JUN 15 2012 0 CONTROL PROJECT DISTRICT HIGHWAY COUNTY 0 6225-77-001 RMC - 622577001 13 FM1291 FAYETTE - ITEM DESCRIPTION UNIT ESTIMATED WORK DONE CONTRACT AMOUNT NO. QUANTITIES ON CONTRACT PRICE($) ($) -0110 EXCAVATION (ROADWAY) CY 1,740.000 1,740.000 10.000 17,400.00 0112 SUBGRADE WIDENING (ORD COMP) STA 269.930 269.930 500.000 134,965.00 0132 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 9,425.000 304.000 1.000 304.00 0164 STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY) AC 20.800 12.090 795.000 9,611.55 0247 FL BS (CMP IN PLC)(TY A GR 2)(FNAL POS) CY 14,029.000 14,088.460 45.000 633,980.70 0260 LIME TRT (EXST MATL) (6") SY 10,000.000 11,744.400 1.750 20,552.70 0260 LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON 119.000 140.380 150.000 21,057.00 0275 CEMENT TON 1,603.000 1,599.400 100.000 159,940.00 0275 CEMENT TREAT(EXIST MATL)(8") SY 98,975.000 98,974.650 1.500 148,461.98 0316 ASPH (RC-250) GAL 17,840.000 17,525.000 3.850 67,471.25 0316 AGGR(TY-PB GR-4 SAC-B) CY 743.000 714.000 80.000 57,120.00 0316 AGGR (TY-PB GR-3) CY 1,049.000 1,093.000 80.000 87,440.00 0316 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 66,006.000 53,350.000 3.500 186,725.00 0316 AGGR (TY-E GR-5) CY 637.000 652.000 70.000 45,640.00 0400 CEM STABIL BKFL CY 118.000 118.000 120.000 14,160.00 0402 TRENCH EXCAVATION PROTECTION LF 50.000 50.000 5.000 250.00 0403 TEMPORARY SPL SHORING SF 565.000 565.000 30.000 16,950.00 0432 RIPRAP (CONC)(5 IN) CY 54.800 57.500 325.000 18,687.50 0452 REMOVE RAIL (TY 6) LF 100.000 100.000 10.000 1,000.00 0460 CMP (GAL STL 24 IN) LF 60.000 120.000 70.000 8,400.00 10462 CONC BOX CULV (5 FT X 4 FT) LF 64.000 64.000 425.000 27,200.00 0462 CONC BOX CULV (6 FT X 6 FT) LF 6.000 6.000 850.000 5,100.00 0462 CONC BOX CULV (7 FT X 4 FT) LF 15.000 15.000 600.000 9,000.00 0462 CONC BOX CULV (8 FT X 5 FT) LF 8.000 8.000 900.000 7,200.00 0464 RC PIPE (CL III)(15 IN) LF 142.000 142.000 40.000 5,680.00 0464 RC PIPE (CL III)(18 IN) LF 316.000 316.000 45.000 14,220.00 0464 RC PIPE (CL III)(24 IN) LF 214.000 214.000 50.000 10,700.00 0464 RC PIPE (CL III)(30 IN) LF 36.000 36.000 75.000 2,700.00 0467 SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1)(C) EA 6.000 6.000 4,000.000 24,000.00 0467 SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1)(C) EA 2.000 2.000 5,500.000 11,000.00 0467 SET (TY I)(S= 7 FT)(HW= 5 FT)(3:1)(C) EA 1.000 1.000 4,500.000 4,500.00 0467 SET (TY I)(S= 7 FT)(HW= 6 FT)(3:1)(C) EA 5.000 5.000 5,000.000 25,000.00 0467 SET (TY I)(S= 7 FT)(HW= 7 FT)(3:1)(C) EA 4.000 4.000 7,500.000 30,000.00 0467 SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1)(C) EA 2.000 2.000 8,500.000 17,000.00 0467 SET (TY II)(15 IN)(RCP)(6:1)(P) EA 6.000 6.000 650.000 3,900.00 0467 SET (TY II)(18 IN)(RCP)(6:1)(P) EA 22.000 22.000 750.000 16,500.00 0467 SET (TY II)(24 IN)(RCP)(6:1)(P) EA 12.000 12.000 800.000 9,600.00 0467 SET (TY II)(30 IN)(RCP)(6:1)(P) EA 2.000 2.000 1,500.000 3,000.00 0496 REMOV STR (BOX CULVERT) EA 1.000 1.000 2,500.000 2,500.00 0496 REMOV STR (PIPE) EA 24.000 26.000 200.000 5,200.00 0500 MOBILIZATION LS 1.000 1.000 220,000.000 220,000.00 0502 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 7.000 2,000.000 14,000.00 0506 ROCK FILTER DAMS (INSTALL) (TY 1) LF 300.000 275.000 21.000 5,775.00 0506 ROCK FILTER DAMS (REMOVE) LF 300.000 275.000 5.000 1,375.00 0506 BACKHOE WORK (EROSION & SEDM CONT) HR 10.000 4.000 100.000 400.00 0506 TEMPORARY SEDIMENT CONTROL FENCE LF 2,080.000 2,105.000 3.150 6,630.75 0530 DRIVEWAYS (SURF TREAT) EA 59.000 60.000 500.000 30,000.00 0542 REMOVING METAL BEAM GUARD FENCE LF 325.000 325.000 2.000 650.00 0542 REMOVING TERMINAL ANCHOR SECTION EA 4.000 4.000 50.000 200.00 0560 MAILBOX INSTALL-S (WC-POST) TY 3 FND EA 11.000 10.000 100.000 1,000.00 0560 MAILBOX INSTALL-D (WC-POST) TY 3 FND EA 2.000 2.000 150.000 300.00 0560 MAILBOX INSTALL-M (TWW-POST)TY 4 FND-TB EA 5.000 5.000 425.000 2,125.00 10644 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 9.000 12.000 250.000 3,000.00 0644 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 5.000 5.000 400.000 2,000.00 0644 IN SM RD SN SUP&AM TYS80(1)SA(U-WC) EA 3.000 3.000 500.000 1,500.00 0644 IN SM RD SN SUP&AM TYTWT(1)WA(P) EA 25.000 25.000 170.000 4,250.00 0644 IN SM RD SN SUP&AM TYTWT(1)WA(T) EA 11.000 8.000 200.000 1,600.00 0644 REMOVE SM RD SN SUP & AM EA 53.000 53.000 50.000 2,650.00 0658 INSTL OM ASSM (OM-2Z)(FLX)GND(BI) EA 14.000 14.000 45.000 630.00 0662 WK ZN PAV MRK NON-REMOV (Y) 4" (BRK) LF 12,940.000 8,590.000 .280 2,405.20 0662 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 34,094.000 30,338.000 .240 7,281.12 0662 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 2,121.000 2,142.000 1.000 2,142.00 0668 PREFAB PAV MRK TY C (W) (24") (SLD) LF 30.000 24.000 13.350 320.40 0672 REFL PAV MRKR TY II-A-A EA 536.000 531.000 5.000 2,655.00 0752 TREE TRIMMING MI 0.210 .210 43,000.000 9,030.00 0752 TREE TRIMMING/BRUSH REMOVAL MI 1.420 1.420 36,500.000 51,830.00 8251 RE PM W/RET REQ TY I(W)4"(SLD)(100MIL) LF 56,556.000 56,495.000 .450 25,422.75 8251 RE PM W/RET REQ TY I(Y)4"(BRK)(100MIL) LF 6,470.000 6,400.000 .500 3,200.00 8251 RE PM W/RET REQ TY I(Y)4"(SLD)(100MIL) LF 17,047.000 16,688.000 .440 7,342.72 0 * ITEMS ADDED IN ACCORDANCE WITH STANDARD SPECIFICATIONS OR BY SUPPLEMENTAL AGREEMENTS 00467* SET (TY II)(24 IN)(CMP)(6:1)(P) EA 4.000 4.000 800.000 3,200.00 0 SUBTOTAL BID ITEMS $ 2,297,031.62 0 CONTRACT TOTAL ALL ITEMS $ 2,297,031.62 1MIS.CIS.05 CONSTR ESTIMATE DISTRIBUTION CONTRACT 7114010 MGR.NO. 006 PAGE 001 CONT 6225 SEC 77 JOB 001 RES ENGR CLARK, JOHN PAUL PROJ RMC - 622577001 HWY FM1291 2000 E SH 71 BYPASS LA GR CNTY FAYETTE DIST 13 CONTRACT PRICE $ 2,387,300.52 REPORT DATE 06/25/2012 08.47.45 CONTRACTOR BIG CREEK CONSTRUCTION, LTD. 8175 EST PERIOD SEP 26,2011 TO JUN 15,2012 EST NO 010 & FINAL ********************************************************************************************************************************** CO NO PROJECT CONT SEC JOB LINE NO TOTAL AMOUNT .00 % DIFFERENCE LESS TOTAL LESS LIQ DIFFERENCE LESS PREV AMOUNT DUE WORK DONE RETAINAGE SPL DEDUCTS DAMAGE PAYMENTS THIS EST ********************************************************************************************************************************** 76 RMC - 622577001 6225-77-001 2,297,031.62 .00 2,297,031.62 .00 .00 2,297,031.62 2,272,322.87 24,708.75 ---------------------------------------------------------------------------------------------------------------------------------- 0********************************** TOTALS ***************************************************************************** TOTAL AMOUNT .00 % DIFFERENCE LESS TOTAL LESS LIQ DIFFERENCE LESS PREV AMOUNT DUE WORK DONE RETAINAGE SPL DEDUCTS DAMAGE PAYMENTS THIS EST ********************************************************************************************************************************** 2,297,031.62 .00 2,297,031.62 .00 .00 2,297,031.62 2,272,322.87 24,708.75 ---------------------------------------------------------------------------------------------------------------------------------- 0INPUT PROOF READ BY- SUPPORTING PAPERS OK ------------------------------ ---------------------------- 0 **APPROVED BY** DATE --------------------------------------------- AREA/PROJECT ENGINEER 0 DATE --------------------------------------------- DISTRICT ENGINEER 1MIS.CIS.07 WORK PERFORMED THIS PERIOD CONTRACT 7114010 MGR.NO. 006 PAGE 001 CONT 6225 SEC 77 JOB 001 RES ENGR CLARK, JOHN PAUL PROJ RMC - 622577001 HWY FM1291 2000 E SH 71 BYPASS LA GR CNTY FAYETTE DIST 13 CONTRACT PRICE $ 2,387,300.52 REPORT DATE 06/25/2012 08.47.45 CONTRACTOR BIG CREEK CONSTRUCTION, LTD. 8175 EST PERIOD SEP 26,2011 TO JUN 15,2012 EST NO 010 & FINAL ********************************************************************************************************************* - CONTROL PROJECT DISTRICT HIGHWAY COUNTY 6225-77-001 RMC - 622577001 13 FM1291 FAYETTE -LIMITS - WALDECK SH 237 LINE ITEM ESTIMATED WORK DONE CONTRACT AMOUNT NO. NO. DESCRIPTION UNIT QUANTITIES THIS ESTIMATE PRICE($) ($) 0 300 0500 MOBILIZATION LS 1.000 0.100 220,000.000 22,000.00 320 0506 BACKHOE WORK (EROSION & SEDM HR 10.000 4.000 100.000 400.00 CONT) 325 0506 TEMPORARY SEDIMENT CONTROL LF 2,080.000 25.000 3.150 78.75 FENCE 385 0644 REMOVE SM RD SN SUP & AM EA 53.000 32.000 50.000 1,600.00 390 0658 INSTL OM ASSM EA 14.000 14.000 45.000 630.00 (OM-2Z)(FLX)GND(BI) --------------- - TOTAL BID ITEMS DONE THIS ESTIMATE - $ 24,708.75 0 TOTAL AMOUNT WORK DONE TO DATE - $ 2,297,031.62