1MIS.CIS.01 CONTRACT TIME STATEMENT CONTRACT 4090901 MGR.NO. 801 PAGE 001 CONT 6191 SEC 65 JOB 001 RES ENGR BASHI, ALI PROJ RMC - 619165001 HWY SH0201 410 W. LOOP 121 BELTON CNTY BELL DIST 09 CONTRACT PRICE $ 88,574.00 REPORT DATE 10/06/2009 14.39.38 CONTRACTOR TCB CONSTRUCTION, INC 12348 EST PERIOD SEP 01,2009 TO SEP 15,2009 EST NO 003 & SM-FIN --------------------------------------------------------------------------------------------------------- DATE WORK BEGAN JUL 10, 2009 TIME COMPUTED FROM JUL 13, 2009 SUMMARY INFORMATION 0 DATE WORKING REASONS FOR DAYS CREDITED MONTH/YEAR OR DAYS DAYS /COMMENTS FOR DAYS CHARGED PHASE I DAYS CHARGED CREDITED CONTRACT WORK DAYS = 30 53 35 18 BROUGHT FORWARD ADDL DAYS GRANTED = 12 SEP 09 1 1 TOTAL DAYS ALLOWED = 42 2 1 DATE WORK COMPLETED 09/15/09 3 1 DAYS CHARGED TO DATE = 41 4 1 ASSESSED LIQ DAMAGES = 0 5 1 SATURDAY LIQ DAMAGE RATE $ 425 6 1 SUNDAY 7 1 HOLIDAY LIQUIDATED DAMAGES 8 1 0 DAYS AT $ 425 PER DAY 9 1 CREDIT DAY DUE TO EMERGENCY ROAD REPAIRTOTAL = $ .00 10 1 11 1 RAIN CERTIFIED AS CORRECT AND 12 1 SATURDAY ONE COPY HAS BEEN GIVEN 13 1 SUNDAY TO THE CONTRACTOR 14 1 TOO WET 15 1 WORK COMPLETED AND ACCEPTED ---------------------------- AREA/PROJECT ENGINEER - - - - - ----- ----- ----- 68 41 27 2 SATURDAY 2 SUNDAY 1 HOLIDAY 1 CREDIT DAY DUE TO EMERGENCY ROAD REPAIR 1 RAIN 1 TOO WET 1 WORK COMPLETED AND ACCEPTED 1MIS.CIS.03 CONSTRUCTN ESTIMATE BREAKDOWN CONTRACT 4090901 MGR.NO. 801 PAGE 001 CONT 6191 SEC 65 JOB 001 RES ENGR BASHI, ALI PROJ RMC - 619165001 HWY SH0201 410 W. LOOP 121 BELTON CNTY BELL DIST 09 CONTRACT PRICE $ 88,574.00 REPORT DATE 10/06/2009 14.39.38 CONTRACTOR TCB CONSTRUCTION, INC 12348 EST PERIOD SEP 01,2009 TO SEP 15,2009 EST NO 003 & SM-FIN DIST. 09 COUNTY BELL CONTROL 6191-65-001 PROJECT RMC - 619165001 HIGHWAY SH0201 0LIMITS- VARIOUS VARIOUS 0TYPE OF WORK- MISCELLANEOUS CONCRETE 0 0005 PREPARED JANUARY 2009 0 0055 ROADWAY NET LENGTH 2.000 MILES 0 LINE ITEM ESTIMATED WORK DONE CONTRACT AMOUNT NO. NO. DESCRIPTION UNIT QUANTITIES ON CONTRACT PRICE($) ($) - 0060 0104 REMOVING CONC (RIPRAP) SY 50.000 30.000 28.000 840.00 0061 0104*REMOVING CONC (PORCHES) CY 61.000 0.000 12.500 .00 0062 0104*REMOVE CONC (GUTTER) LF 61.000 61.000 12.500 762.50 0065 0104 REMOVING CONC (CURB) LF 24.000 0.000 10.000 .00 0070 0429 CNC STR REP (HORIZONTAL) SF 137.000 123.000 22.000 2,706.00 0075 0429 CNC STR REP (VERTICAL OR OVERHEAD) SF 9.000 14.000 250.000 3,500.00 0080 0432 RIPRAP (CONC)(4 IN) CY 138.000 221.496 310.000 68,663.76 0085 0432 RIPRAP (STONE PROTECTION)(18 IN) CY 160.000 195.300 65.000 12,694.50 0090 0465 INLET (COMPL)(SPL) EA 6.000 6.000 1,200.000 7,200.00 0095 0466 WINGWALL (FW-0)(HW=8 FT) EA 2.000 2.000 4,100.000 8,200.00 0100 0466 WINGWALL (FW-S)(HW=7 FT) EA 2.000 2.000 5,500.000 11,000.00 0101 0467*SET(TY II)(24 IN)(HDPE)(6:1)(P) EA 4.000 4.000 2,200.000 8,800.00 0105 0506 TEMPORARY SEDIMENT CONTROL FENCE LF 1,000.000 53.000 2.000 106.00 0110 0529 CONC CURB & GUTTER (TY II) LF 3.000 0.000 30.000 .00 0115 0529*CONC CURB (RIBBON)(MOD) LF 61.000 61.000 40.000 2,440.00 0 SUBTOTAL BID ITEMS $ 126,912.76 0 TOTAL AMOUNT WORK DONE ROADWAY $ 126,912.76 0 TOTAL AMOUNT WORK DONE CONTROL 6191-65-001 $ 126,912.76 0 * ITEMS ADDED IN ACCORDANCE WITH STANDARD SPECIFICATIONS OR BY SUPPLEMENTAL AGREEMENTS 1MIS.CIS.04 CONSTRUCTION ESTIMATE COMBINED CONTRACT 4090901 MGR.NO. 801 PAGE 001 CONT 6191 SEC 65 JOB 001 RES ENGR BASHI, ALI PROJ RMC - 619165001 HWY SH0201 410 W. LOOP 121 BELTON CNTY BELL DIST 09 CONTRACT PRICE $ 88,574.00 REPORT DATE 10/06/2009 14.39.39 CONTRACTOR TCB CONSTRUCTION, INC 12348 EST PERIOD SEP 01,2009 TO SEP 15,2009 EST NO 003 & SM-FIN 0*********************************************************************************************************************************** -LIMITS - VARIOUS 0 VARIOUS DATE WORK BEGAN JUL 10, 2009 WORKING DAYS USED 41 PERCENT COMPLETE 100.00 PERCENT TIME USED 97.60 DATE COMPLETED SEP 15 2009 0 CONTROL PROJECT DISTRICT HIGHWAY COUNTY 0 6191-65-001 RMC - 619165001 09 SH0201 BELL - ITEM DESCRIPTION UNIT ESTIMATED WORK DONE CONTRACT AMOUNT NO. QUANTITIES ON CONTRACT PRICE($) ($) -0104 REMOVING CONC (RIPRAP) SY 50.000 30.000 28.000 840.00 0429 CNC STR REP (HORIZONTAL) SF 137.000 123.000 22.000 2,706.00 0429 CNC STR REP (VERTICAL OR OVERHEAD) SF 9.000 14.000 250.000 3,500.00 0432 RIPRAP (CONC)(4 IN) CY 138.000 221.496 310.000 68,663.76 0432 RIPRAP (STONE PROTECTION)(18 IN) CY 160.000 195.300 65.000 12,694.50 0465 INLET (COMPL)(SPL) EA 6.000 6.000 1,200.000 7,200.00 0466 WINGWALL (FW-0)(HW=8 FT) EA 2.000 2.000 4,100.000 8,200.00 0466 WINGWALL (FW-S)(HW=7 FT) EA 2.000 2.000 5,500.000 11,000.00 0506 TEMPORARY SEDIMENT CONTROL FENCE LF 1,000.000 53.000 2.000 106.00 0 * ITEMS ADDED IN ACCORDANCE WITH STANDARD SPECIFICATIONS OR BY SUPPLEMENTAL AGREEMENTS 00104* REMOVE CONC (GUTTER) LF 61.000 61.000 12.500 762.50 0467* SET(TY II)(24 IN)(HDPE)(6:1)(P) EA 4.000 4.000 2,200.000 8,800.00 0529* CONC CURB (RIBBON)(MOD) LF 61.000 61.000 40.000 2,440.00 0 SUBTOTAL BID ITEMS $ 126,912.76 0 CONTRACT TOTAL ALL ITEMS $ 126,912.76 1MIS.CIS.05 CONSTR ESTIMATE DISTRIBUTION CONTRACT 4090901 MGR.NO. 801 PAGE 001 CONT 6191 SEC 65 JOB 001 RES ENGR BASHI, ALI PROJ RMC - 619165001 HWY SH0201 410 W. LOOP 121 BELTON CNTY BELL DIST 09 CONTRACT PRICE $ 88,574.00 REPORT DATE 10/06/2009 14.39.39 CONTRACTOR TCB CONSTRUCTION, INC 12348 EST PERIOD SEP 01,2009 TO SEP 15,2009 EST NO 003 & SM-FIN ********************************************************************************************************************************** CO NO PROJECT CONT SEC JOB LINE NO TOTAL AMOUNT .00 % DIFFERENCE LESS TOTAL LESS LIQ DIFFERENCE LESS PREV AMOUNT DUE WORK DONE RETAINAGE SPL DEDUCTS DAMAGE PAYMENTS THIS EST ********************************************************************************************************************************** 14 RMC - 619165001 6191-65-001 126,912.76 .00 126,912.76 .00 .00 126,912.76 119,866.76 7,046.00 ---------------------------------------------------------------------------------------------------------------------------------- 0********************************** TOTALS ***************************************************************************** TOTAL AMOUNT .00 % DIFFERENCE LESS TOTAL LESS LIQ DIFFERENCE LESS PREV AMOUNT DUE WORK DONE RETAINAGE SPL DEDUCTS DAMAGE PAYMENTS THIS EST ********************************************************************************************************************************** 126,912.76 .00 126,912.76 .00 .00 126,912.76 119,866.76 7,046.00 ---------------------------------------------------------------------------------------------------------------------------------- 0INPUT PROOF READ BY- SUPPORTING PAPERS OK ------------------------------ ---------------------------- 0 APPROVED DATE --------------------------------- ----------------- 1MIS.CIS.07 WORK PERFORMED THIS PERIOD CONTRACT 4090901 MGR.NO. 801 PAGE 001 CONT 6191 SEC 65 JOB 001 RES ENGR BASHI, ALI PROJ RMC - 619165001 HWY SH0201 410 W. LOOP 121 BELTON CNTY BELL DIST 09 CONTRACT PRICE $ 88,574.00 REPORT DATE 10/06/2009 14.39.39 CONTRACTOR TCB CONSTRUCTION, INC 12348 EST PERIOD SEP 01,2009 TO SEP 15,2009 EST NO 003 & SM-FIN ********************************************************************************************************************* - CONTROL PROJECT DISTRICT HIGHWAY COUNTY 6191-65-001 RMC - 619165001 09 SH0201 BELL -LIMITS - VARIOUS VARIOUS LINE ITEM ESTIMATED WORK DONE CONTRACT AMOUNT NO. NO. DESCRIPTION UNIT QUANTITIES THIS ESTIMATE PRICE($) ($) 0 60 0104 REMOVING CONC (RIPRAP) SY 50.000 30.000 28.000 840.00 70 0429 CNC STR REP (HORIZONTAL) SF 137.000 123.000 22.000 2,706.00 75 0429 CNC STR REP (VERTICAL OR SF 9.000 14.000 250.000 3,500.00 OVERHEAD) --------------- - TOTAL BID ITEMS DONE THIS ESTIMATE - $ 7,046.00 0 TOTAL AMOUNT WORK DONE TO DATE - $ 126,912.76