1MIS.CIS.01 CONTRACT TIME STATEMENT CONTRACT 10114029 MGR.NO. 775 PAGE 001 CONT 6205 SEC 75 JOB 001 RES ENGR CORDER, STUART PROJ RMC - 620575001 HWY IH0610 7600 WASHINGTON AVE HOUST CNTY HARRIS DIST 12 CONTRACT PRICE $ 1,358,820.00 REPORT DATE 04/15/2013 08.49.24 CONTRACTOR SIEMENS INDUSTRY, INC. 15681 EST PERIOD MAR 01,2013 TO MAR 31,2013 EST NO 013 --------------------------------------------------------------------------------------------------------- DATE WORK BEGAN MAR 05, 2012 TIME COMPUTED FROM MAR 05, 2012 SUMMARY INFORMATION 0 DATE WORKING REASONS FOR DAYS CREDITED MONTH/YEAR OR DAYS DAYS /COMMENTS FOR DAYS CHARGED PHASE I DAYS CHARGED CREDITED CONTRACT WORK DAYS = 731 361 361 0 BROUGHT FORWARD ADDL DAYS GRANTED = 0 MAR 13 1 1 TOTAL DAYS ALLOWED = 731 2 1 DATE WORK COMPLETED 3 1 DAYS CHARGED TO DATE = 392 4 1 ASSESSED LIQ DAMAGES = 0 5 1 LIQ DAMAGE RATE $ 0 6 1 7 1 LIQUIDATED DAMAGES 8 1 0 DAYS AT $ 0 PER DAY 9 1 TOTAL = $ .00 10 1 11 1 CERTIFIED AS CORRECT AND 12 1 ONE COPY HAS BEEN GIVEN 13 1 TO THE CONTRACTOR 14 1 15 1 16 1 ---------------------------- 17 1 AREA/PROJECT ENGINEER 18 1 19 1 20 1 21 1 22 1 23 1 24 1 25 1 26 1 27 1 28 1 29 1 30 1 31 1 ----- ----- ----- 392 392 0 0 SATURDAY 0 SUNDAY 0 HOLIDAY 1MIS.CIS.03 CONSTRUCTN ESTIMATE BREAKDOWN CONTRACT 10114029 MGR.NO. 775 PAGE 001 CONT 6205 SEC 75 JOB 001 RES ENGR CORDER, STUART PROJ RMC - 620575001 HWY IH0610 7600 WASHINGTON AVE HOUST CNTY HARRIS DIST 12 CONTRACT PRICE $ 1,358,820.00 REPORT DATE 04/15/2013 08.49.25 CONTRACTOR SIEMENS INDUSTRY, INC. 15681 EST PERIOD MAR 01,2013 TO MAR 31,2013 EST NO 013 DIST. 12 COUNTY HARRIS CONTROL 6205-75-001 PROJECT RMC - 620575001 HIGHWAY IH0610 0LIMITS- VARIOUS HWYS IN HOUSTON DISTRICT VARIOUS HWYS IN HOUSTON DISTRICT 0TYPE OF WORK- LOOP DETECTOR REPAIR AND REPLACEMENT 0 0050 PREVENT MNT OF SIGNAL EQUIPMNT NET LENGTH 0.001 MILES 0 LINE ITEM ESTIMATED WORK DONE CONTRACT AMOUNT NO. NO. DESCRIPTION UNIT QUANTITIES ON CONTRACT PRICE($) ($) - 0070 TRNSP OPRS/SGNLS - HAMBERRY 0 0075 7353 INSTALL LOOP DETECTOR WIRE IN CONDUIT LF 90,000.000 61,313.000 .350 21,459.55 0080 7353 WIRE SPLICES EA 900.000 477.000 10.000 4,770.00 0085 7353 LOOP LEAD-IN CABLE LF 160,000.000 107,813.000 .650 70,078.45 0090 7353 JACKING AND BORING LF 6,000.000 2,463.000 8.000 19,704.00 0095 7353 SAW CUT (ASPHALT) LF 90,000.000 38,310.000 4.890 187,335.90 0100 7353 SAW CUT (CONCRETE) LF 75,000.000 35,759.000 5.890 210,620.51 0105 7353 SAW CUT (OLD GROOVE) LF 3,000.000 648.000 3.490 2,261.52 0110 7353 INSTALL PULL BOX (TYPE D) EA 300.000 134.000 350.000 46,900.00 0115 7353 TRENCH AND INSTALL CONDUIT (1 INCH) LF 15,000.000 10,387.000 8.000 83,096.00 0120 7353 TRENCH AND INSTALL CONDUIT (2 INCHES) LF 7,000.000 7,539.000 7.000 52,773.00 0 SUBTOTAL BID ITEMS $ 698,998.93 0 TOTAL AMOUNT WORK DONE PREVENT MNT OF SIGNAL EQUIPMNT $ 698,998.93 0 TOTAL AMOUNT WORK DONE CONTROL 6205-75-001 $ 698,998.93 1MIS.CIS.04 CONSTRUCTION ESTIMATE COMBINED CONTRACT 10114029 MGR.NO. 775 PAGE 001 CONT 6205 SEC 75 JOB 001 RES ENGR CORDER, STUART PROJ RMC - 620575001 HWY IH0610 7600 WASHINGTON AVE HOUST CNTY HARRIS DIST 12 CONTRACT PRICE $ 1,358,820.00 REPORT DATE 04/15/2013 08.49.25 CONTRACTOR SIEMENS INDUSTRY, INC. 15681 EST PERIOD MAR 01,2013 TO MAR 31,2013 EST NO 013 0*********************************************************************************************************************************** -LIMITS - VARIOUS HWYS IN HOUSTON DISTRICT 0 VARIOUS HWYS IN HOUSTON DISTRICT DATE WORK BEGAN MAR 5 , 2012 WORKING DAYS USED 392 PERCENT COMPLETE 51.44 PERCENT TIME USED 53.60 DATE COMPLETED 0 CONTROL PROJECT DISTRICT HIGHWAY COUNTY 0 6205-75-001 RMC - 620575001 12 IH0610 HARRIS - ITEM DESCRIPTION UNIT ESTIMATED WORK DONE CONTRACT AMOUNT NO. QUANTITIES ON CONTRACT PRICE($) ($) -7353 INSTALL LOOP DETECTOR WIRE IN CONDUIT LF 90,000.000 61,313.000 .350 21,459.55 7353 WIRE SPLICES EA 900.000 477.000 10.000 4,770.00 7353 LOOP LEAD-IN CABLE LF 160,000.000 107,813.000 .650 70,078.45 7353 JACKING AND BORING LF 6,000.000 2,463.000 8.000 19,704.00 7353 SAW CUT (ASPHALT) LF 90,000.000 38,310.000 4.890 187,335.90 7353 SAW CUT (CONCRETE) LF 75,000.000 35,759.000 5.890 210,620.51 7353 SAW CUT (OLD GROOVE) LF 3,000.000 648.000 3.490 2,261.52 7353 INSTALL PULL BOX (TYPE D) EA 300.000 134.000 350.000 46,900.00 7353 TRENCH AND INSTALL CONDUIT (1 INCH) LF 15,000.000 10,387.000 8.000 83,096.00 7353 TRENCH AND INSTALL CONDUIT (2 INCHES) LF 7,000.000 7,539.000 7.000 52,773.00 0 SUBTOTAL BID ITEMS $ 698,998.93 0 CONTRACT TOTAL ALL ITEMS $ 698,998.93 1MIS.CIS.05 CONSTR ESTIMATE DISTRIBUTION CONTRACT 10114029 MGR.NO. 775 PAGE 001 CONT 6205 SEC 75 JOB 001 RES ENGR CORDER, STUART PROJ RMC - 620575001 HWY IH0610 7600 WASHINGTON AVE HOUST CNTY HARRIS DIST 12 CONTRACT PRICE $ 1,358,820.00 REPORT DATE 04/15/2013 08.49.25 CONTRACTOR SIEMENS INDUSTRY, INC. 15681 EST PERIOD MAR 01,2013 TO MAR 31,2013 EST NO 013 ********************************************************************************************************************************** CO NO PROJECT CONT SEC JOB LINE NO TOTAL AMOUNT .00 % DIFFERENCE LESS TOTAL LESS LIQ DIFFERENCE LESS PREV AMOUNT DUE WORK DONE RETAINAGE SPL DEDUCTS DAMAGE PAYMENTS THIS EST ********************************************************************************************************************************** 102 RMC - 620575001 6205-75-001 698,998.93 .00 698,998.93 .00 .00 698,998.93 624,641.77 74,357.16 ---------------------------------------------------------------------------------------------------------------------------------- 0********************************** TOTALS ***************************************************************************** TOTAL AMOUNT .00 % DIFFERENCE LESS TOTAL LESS LIQ DIFFERENCE LESS PREV AMOUNT DUE WORK DONE RETAINAGE SPL DEDUCTS DAMAGE PAYMENTS THIS EST ********************************************************************************************************************************** 698,998.93 .00 698,998.93 .00 .00 698,998.93 624,641.77 74,357.16 ---------------------------------------------------------------------------------------------------------------------------------- 0INPUT PROOF READ BY- SUPPORTING PAPERS OK ------------------------------ ---------------------------- 0 APPROVED DATE --------------------------------- ----------------- 1MIS.CIS.07 WORK PERFORMED THIS PERIOD CONTRACT 10114029 MGR.NO. 775 PAGE 001 CONT 6205 SEC 75 JOB 001 RES ENGR CORDER, STUART PROJ RMC - 620575001 HWY IH0610 7600 WASHINGTON AVE HOUST CNTY HARRIS DIST 12 CONTRACT PRICE $ 1,358,820.00 REPORT DATE 04/15/2013 08.49.25 CONTRACTOR SIEMENS INDUSTRY, INC. 15681 EST PERIOD MAR 01,2013 TO MAR 31,2013 EST NO 013 ********************************************************************************************************************* - CONTROL PROJECT DISTRICT HIGHWAY COUNTY 6205-75-001 RMC - 620575001 12 IH0610 HARRIS -LIMITS - VARIOUS HWYS IN HOUSTON DISTRICT VARIOUS HWYS IN HOUSTON DISTRICT LINE ITEM ESTIMATED WORK DONE CONTRACT AMOUNT NO. NO. DESCRIPTION UNIT QUANTITIES THIS ESTIMATE PRICE($) ($) 0 75 7353 INSTALL LOOP DETECTOR WIRE LF 90,000.000 8,145.000 0.350 2,850.75 IN CONDUIT 80 7353 WIRE SPLICES EA 900.000 41.000 10.000 410.00 85 7353 LOOP LEAD-IN CABLE LF 160,000.000 12,812.000 0.650 8,327.80 90 7353 JACKING AND BORING LF 6,000.000 415.000 8.000 3,320.00 95 7353 SAW CUT (ASPHALT) LF 90,000.000 4,589.000 4.890 22,440.21 100 7353 SAW CUT (CONCRETE) LF 75,000.000 3,660.000 5.890 21,557.40 110 7353 INSTALL PULL BOX (TYPE D) EA 300.000 6.000 350.000 2,100.00 115 7353 TRENCH AND INSTALL CONDUIT LF 15,000.000 1,297.000 8.000 10,376.00 (1 INCH) 120 7353 TRENCH AND INSTALL CONDUIT LF 7,000.000 425.000 7.000 2,975.00 (2 INCHES) --------------- - TOTAL BID ITEMS DONE THIS ESTIMATE - $ 74,357.16 0 TOTAL AMOUNT WORK DONE TO DATE - $ 698,998.93