1MIS.CIS.01 CONTRACT TIME STATEMENT CONTRACT 11114009 MGR.NO. 050 PAGE 001 CONT 6232 SEC 39 JOB 001 RES ENGR REINDERS, DONNIE PROJ RMC - 623239001 HWY FM1915 3303 NORTH TRAVIS CAMERON CNTY MILAM DIST 17 CONTRACT PRICE $ 1,228,781.09 REPORT DATE 11/12/2012 12.03.40 CONTRACTOR BIG CREEK CONSTRUCTION, LTD. 8175 EST PERIOD MAR 01,2012 TO OCT 31,2012 EST NO 008 & FINAL --------------------------------------------------------------------------------------------------------- DATE WORK BEGAN MAR 01, 2012 TIME COMPUTED FROM MAR 09, 2012 SUMMARY INFORMATION 0 DATE WORKING REASONS FOR DAYS CREDITED MONTH/YEAR OR DAYS DAYS /COMMENTS FOR DAYS CHARGED PHASE I DAYS CHARGED CREDITED CONTRACT WORK DAYS = 75 214 76 138 BROUGHT FORWARD ADDL DAYS GRANTED = 0 OCT 12 1 1 PERFORMANCE PERIOD FOR RPMS TOTAL DAYS ALLOWED = 75 2 1 PERFORMANCE PERIOD FOR RPMS DATE WORK COMPLETED 10/03/12 3 1 WORK ACCEPTED DAYS CHARGED TO DATE = 76 ASSESSED LIQ DAMAGES = 1 LIQ DAMAGE RATE $ 685 0 LIQUIDATED DAMAGES 1 DAYS AT $ 685 PER DAY TOTAL = $ 685.00 0 CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR - ---------------------------- AREA/PROJECT ENGINEER - - - - - ----- ----- ----- 217 76 141 0 SATURDAY 0 SUNDAY 0 HOLIDAY 2 PERFORMANCE PERIOD FOR RPMS 1 WORK ACCEPTED 1MIS.CIS.03 CONSTRUCTN ESTIMATE BREAKDOWN CONTRACT 11114009 MGR.NO. 050 PAGE 001 CONT 6232 SEC 39 JOB 001 RES ENGR REINDERS, DONNIE PROJ RMC - 623239001 HWY FM1915 3303 NORTH TRAVIS CAMERON CNTY MILAM DIST 17 CONTRACT PRICE $ 1,228,781.09 REPORT DATE 11/12/2012 12.03.41 CONTRACTOR BIG CREEK CONSTRUCTION, LTD. 8175 EST PERIOD MAR 01,2012 TO OCT 31,2012 EST NO 008 & FINAL DIST. 17 COUNTY MILAM CONTROL 6232-39-001 PROJECT RMC - 623239001 HIGHWAY FM1915 0LIMITS- FM 437 CR 407 0TYPE OF WORK- ROADWAY RESTORATION 0 0005 PREPARED BY DISTRICT MAINTENANCE 0 0055 ROADWAY RESTORATION NET LENGTH 4.288 MILES 0 LINE ITEM ESTIMATED WORK DONE CONTRACT AMOUNT NO. NO. DESCRIPTION UNIT QUANTITIES ON CONTRACT PRICE($) ($) - 0060 0110 EXCAVATION (ROADWAY) CY 515.000 515.000 15.000 7,725.00 0065 0112 SUBGRADE WIDENING (DENS CONT) STA 222.410 222.410 250.000 55,602.50 0070 0132 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) CY 161.000 84.000 22.000 1,848.00 0075 0134 BACKFILL (TY B) STA 226.410 100.000 100.000 10,000.00 0080 0150 BLADING STA 226.410 174.000 50.000 8,700.00 0085 0158 SPEC EXCAV WORK (BACKHOE) HR 14.000 17.000 100.000 1,700.00 0090 0164 DRILL SEEDING (PERM) (RURAL) (SANDY) SY 30,189.000 0.000 .130 .00 0095 0164 DRILL SEEDING (TEMP) (WARM) SY 15,095.000 0.000 .070 .00 0100 0164 DRILL SEEDING (TEMP) (COOL) SY 15,095.000 0.000 .070 .00 0105 0168 VEGETATIVE WATERING MG 302.000 0.000 5.000 .00 0110 0247 FL BS (CMP IN PLACE)(TY A GR 2)(12") SY 1,448.000 1,448.000 18.000 26,064.00 0115 0247 FL BS (CMP IN PLC) (TY A GR 2) (4") SY 69,194.000 69,194.000 4.000 276,776.00 0120 0251 REWORK BS MTL (TY D)(12")(ORD COMP) STA 222.410 222.420 300.000 66,726.00 0125 0275 CEMENT TON 1,112.000 1,089.060 110.000 119,796.60 0130 0275 CEMENT TREAT(EXIST MATL)(8") SY 74,137.000 74,136.666 1.250 92,670.83 0135 0316 ASPH (TIER II) GAL 29,678.000 25,000.000 3.500 87,500.00 0140 0316 ASPH (TIER III) GAL 17,661.000 14,025.000 3.750 52,593.75 0145 0316 AGGR (TIER II) CY 565.000 531.820 90.000 47,863.80 0150 0316 AGGR (TIER III) CY 523.000 532.000 75.000 39,900.00 0155 0400 CEM STABIL BKFL CY 44.000 44.000 120.000 5,280.00 0160 0400 CUT & RESTORING PAV SY 20.000 0.000 75.000 .00 0165 0402 TRENCH EXCAVATION PROTECTION LF 53.000 53.000 7.000 371.00 0170 0403 TEMPORARY SPL SHORING SF 52.000 0.000 40.000 .00 1 0175 0460 CMP (GAL STL 24 IN) LF 36.000 36.000 50.000 1,800.00 0180 0460 CMP (GAL STL 30 IN) LF 4.000 4.000 80.000 320.00 0185 0464 RC PIPE (CL III)(24 IN) LF 104.000 104.000 75.000 7,800.00 0190 0467 SET (TY II)(24 IN)(RCP)(4:1)(C) EA 2.000 2.000 850.000 1,700.00 0195 0467 SET (TY II)(24 IN)(RCP)(6:1)(C) EA 2.000 2.000 950.000 1,900.00 0200 0467 SET (TY II)(24 IN)(CMP)(4:1)(C) EA 10.000 10.000 900.000 9,000.00 0205 0467 SET (TY II)(30 IN)(CMP)(4:1)(C) EA 2.000 2.000 1,500.000 3,000.00 0210 0496 REMOV STR (SET) EA 4.000 4.000 150.000 600.00 0215 0496 REMOV STR (PIPE) LF 16.000 16.000 25.000 400.00 0220 0496 REMOV STR (PIPE) EA 2.000 2.000 500.000 1,000.00 0225 0500 MOBILIZATION LS 1.000 1.000 110,000.000 110,000.00 0230 0502 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 5.000 3,000.000 15,000.00 0235 0506 ROCK FILTER DAMS (INSTALL) (TY 1) LF 860.000 764.000 17.000 12,988.00 0240 0506 ROCK FILTER DAMS (REMOVE) LF 860.000 0.000 6.500 .00 0245 0506 BACKHOE WORK (EROSION & SEDM CONT) HR 14.000 0.000 80.000 .00 0250 0506 TEMPORARY SEDIMENT CONTROL FENCE LF 1,775.000 1,352.000 3.000 4,056.00 0255 0530 DRIVEWAYS (ACP) EA 2.000 3.000 1,500.000 4,500.00 0260 0530 DRIVEWAYS (SURF TREAT) EA 4.000 4.000 1,050.000 4,200.00 0265 0530 TURNOUTS (SURF TREAT) EA 35.000 35.000 500.000 17,500.00 0270 0530 DRIVEWAYS (OTHER) EA 39.000 39.000 300.000 11,700.00 0275 0560 MAILBOX INSTALL-D (TWW-POST)TY 4 FND-TB EA 2.000 0.000 165.000 .00 0280 0560 MAILBOX INSTALL-M (TWW-POST)TY 4 FND-TB EA 1.000 0.000 385.000 .00 0285 0560 MAILBOX INSTALL-S(TWW-POST)TY 4 FND- EA 32.000 0.000 150.000 .00 0290 0662 WK ZN PAV MRK NON-REMOV (W) 4" (SLD) LF 45,238.000 0.000 .150 .00 0295 0662 WK ZN PAV MRK NON-REMOV (Y) 4" (BRK) LF 3,680.000 0.000 .150 .00 0300 0662 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 27,022.000 0.000 .140 .00 0305 0662 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 1,160.000 545.000 1.000 545.00 0310 0666 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 45,238.000 45,238.000 .380 17,190.44 0315 0666 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 19.000 36.000 15.000 540.00 0320 0666 REFL PAV MRK TY I (W) (WORD) (100MIL) EA 2.000 2.000 150.000 300.00 0325 0666 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 3,680.000 3,680.000 .400 1,472.00 0330 0666 REFL PAV MRK TY I (Y) 4" 1 (SLD)(100MIL) LF 27,022.000 27,022.000 .380 10,268.36 0335 0672 REFL PAV MRKR TY II-A-A EA 524.000 524.000 4.110 2,153.64 0 SUBTOTAL BID ITEMS $ 1,141,050.92 0 TOTAL AMOUNT WORK DONE ROADWAY RESTORATION $ 1,141,050.92 0 TOTAL AMOUNT WORK DONE CONTROL 6232-39-001 $ 1,141,050.92 1MIS.CIS.04 CONSTRUCTION ESTIMATE COMBINED CONTRACT 11114009 MGR.NO. 050 PAGE 001 CONT 6232 SEC 39 JOB 001 RES ENGR REINDERS, DONNIE PROJ RMC - 623239001 HWY FM1915 3303 NORTH TRAVIS CAMERON CNTY MILAM DIST 17 CONTRACT PRICE $ 1,228,781.09 REPORT DATE 11/12/2012 12.03.42 CONTRACTOR BIG CREEK CONSTRUCTION, LTD. 8175 EST PERIOD MAR 01,2012 TO OCT 31,2012 EST NO 008 & FINAL 0*********************************************************************************************************************************** -LIMITS - FM 437 0 CR 407 DATE WORK BEGAN MAR 1 , 2012 WORKING DAYS USED 76 PERCENT COMPLETE 100.00 PERCENT TIME USED 101.30 DATE COMPLETED OCT 3 2012 0 CONTROL PROJECT DISTRICT HIGHWAY COUNTY 0 6232-39-001 RMC - 623239001 17 FM1915 MILAM - ITEM DESCRIPTION UNIT ESTIMATED WORK DONE CONTRACT AMOUNT NO. QUANTITIES ON CONTRACT PRICE($) ($) -0110 EXCAVATION (ROADWAY) CY 515.000 515.000 15.000 7,725.00 0112 SUBGRADE WIDENING (DENS CONT) STA 222.410 222.410 250.000 55,602.50 0132 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) CY 161.000 84.000 22.000 1,848.00 0134 BACKFILL (TY B) STA 226.410 100.000 100.000 10,000.00 0150 BLADING STA 226.410 174.000 50.000 8,700.00 0158 SPEC EXCAV WORK (BACKHOE) HR 14.000 17.000 100.000 1,700.00 0247 FL BS (CMP IN PLACE)(TY A GR 2)(12") SY 1,448.000 1,448.000 18.000 26,064.00 0247 FL BS (CMP IN PLC) (TY A GR 2) (4") SY 69,194.000 69,194.000 4.000 276,776.00 0251 REWORK BS MTL (TY D)(12")(ORD COMP) STA 222.410 222.420 300.000 66,726.00 0275 CEMENT TON 1,112.000 1,089.060 110.000 119,796.60 0275 CEMENT TREAT(EXIST MATL)(8") SY 74,137.000 74,136.666 1.250 92,670.83 0316 ASPH (TIER II) GAL 29,678.000 25,000.000 3.500 87,500.00 0316 ASPH (TIER III) GAL 17,661.000 14,025.000 3.750 52,593.75 0316 AGGR (TIER II) CY 565.000 531.820 90.000 47,863.80 0316 AGGR (TIER III) CY 523.000 532.000 75.000 39,900.00 0400 CEM STABIL BKFL CY 44.000 44.000 120.000 5,280.00 0402 TRENCH EXCAVATION PROTECTION LF 53.000 53.000 7.000 371.00 0460 CMP (GAL STL 24 IN) LF 36.000 36.000 50.000 1,800.00 0460 CMP (GAL STL 30 IN) LF 4.000 4.000 80.000 320.00 0464 RC PIPE (CL III)(24 IN) LF 104.000 104.000 75.000 7,800.00 10467 SET (TY II)(24 IN)(RCP)(4:1)(C) EA 2.000 2.000 850.000 1,700.00 0467 SET (TY II)(24 IN)(RCP)(6:1)(C) EA 2.000 2.000 950.000 1,900.00 0467 SET (TY II)(24 IN)(CMP)(4:1)(C) EA 10.000 10.000 900.000 9,000.00 0467 SET (TY II)(30 IN)(CMP)(4:1)(C) EA 2.000 2.000 1,500.000 3,000.00 0496 REMOV STR (SET) EA 4.000 4.000 150.000 600.00 0496 REMOV STR (PIPE) LF 16.000 16.000 25.000 400.00 0496 REMOV STR (PIPE) EA 2.000 2.000 500.000 1,000.00 0500 MOBILIZATION LS 1.000 1.000 110,000.000 110,000.00 0502 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 5.000 3,000.000 15,000.00 0506 ROCK FILTER DAMS (INSTALL) (TY 1) LF 860.000 764.000 17.000 12,988.00 0506 TEMPORARY SEDIMENT CONTROL FENCE LF 1,775.000 1,352.000 3.000 4,056.00 0530 DRIVEWAYS (ACP) EA 2.000 3.000 1,500.000 4,500.00 0530 DRIVEWAYS (SURF TREAT) EA 4.000 4.000 1,050.000 4,200.00 0530 TURNOUTS (SURF TREAT) EA 35.000 35.000 500.000 17,500.00 0530 DRIVEWAYS (OTHER) EA 39.000 39.000 300.000 11,700.00 0662 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 1,160.000 545.000 1.000 545.00 0666 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 45,238.000 45,238.000 .380 17,190.44 0666 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 19.000 36.000 15.000 540.00 0666 REFL PAV MRK TY I (W) (WORD) (100MIL) EA 2.000 2.000 150.000 300.00 0666 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 3,680.000 3,680.000 .400 1,472.00 0666 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 27,022.000 27,022.000 .380 10,268.36 0672 REFL PAV MRKR TY II-A-A EA 524.000 524.000 4.110 2,153.64 0 SUBTOTAL BID ITEMS $ 1,141,050.92 0 CONTRACT TOTAL ALL ITEMS $ 1,141,050.92 1MIS.CIS.05 CONSTR ESTIMATE DISTRIBUTION CONTRACT 11114009 MGR.NO. 050 PAGE 001 CONT 6232 SEC 39 JOB 001 RES ENGR REINDERS, DONNIE PROJ RMC - 623239001 HWY FM1915 3303 NORTH TRAVIS CAMERON CNTY MILAM DIST 17 CONTRACT PRICE $ 1,228,781.09 REPORT DATE 11/12/2012 12.03.42 CONTRACTOR BIG CREEK CONSTRUCTION, LTD. 8175 EST PERIOD MAR 01,2012 TO OCT 31,2012 EST NO 008 & FINAL ********************************************************************************************************************************** CO NO PROJECT CONT SEC JOB LINE NO TOTAL AMOUNT .00 % DIFFERENCE LESS TOTAL LESS LIQ DIFFERENCE LESS PREV AMOUNT DUE WORK DONE RETAINAGE SPL DEDUCTS DAMAGE PAYMENTS THIS EST ********************************************************************************************************************************** 166 RMC - 623239001 6232-39-001 1,141,050.92 .00 1,141,050.92 .00 685.00 1,140,365.92 1,130,069.10 10,296.82 ---------------------------------------------------------------------------------------------------------------------------------- 0********************************** TOTALS ***************************************************************************** TOTAL AMOUNT .00 % DIFFERENCE LESS TOTAL LESS LIQ DIFFERENCE LESS PREV AMOUNT DUE WORK DONE RETAINAGE SPL DEDUCTS DAMAGE PAYMENTS THIS EST ********************************************************************************************************************************** 1,141,050.92 .00 1,141,050.92 .00 685.00 1,140,365.92 1,130,069.10 10,296.82 ---------------------------------------------------------------------------------------------------------------------------------- 0INPUT PROOF READ BY- SUPPORTING PAPERS OK ------------------------------ ---------------------------- 0 **APPROVED BY** DATE --------------------------------------------- AREA/PROJECT ENGINEER 0 DATE --------------------------------------------- DISTRICT ENGINEER 1MIS.CIS.07 WORK PERFORMED THIS PERIOD CONTRACT 11114009 MGR.NO. 050 PAGE 001 CONT 6232 SEC 39 JOB 001 RES ENGR REINDERS, DONNIE PROJ RMC - 623239001 HWY FM1915 3303 NORTH TRAVIS CAMERON CNTY MILAM DIST 17 CONTRACT PRICE $ 1,228,781.09 REPORT DATE 11/12/2012 12.03.42 CONTRACTOR BIG CREEK CONSTRUCTION, LTD. 8175 EST PERIOD MAR 01,2012 TO OCT 31,2012 EST NO 008 & FINAL ********************************************************************************************************************* - CONTROL PROJECT DISTRICT HIGHWAY COUNTY 6232-39-001 RMC - 623239001 17 FM1915 MILAM -LIMITS - FM 437 CR 407 LINE ITEM ESTIMATED WORK DONE CONTRACT AMOUNT NO. NO. DESCRIPTION UNIT QUANTITIES THIS ESTIMATE PRICE($) ($) 0 60 0110 EXCAVATION (ROADWAY) CY 515.000 0.186 15.000 2.79 110 0247 FL BS (CMP IN PLACE)(TY A GR SY 1,448.000 -0.888 18.000 -15.98 2)(12") 115 0247 FL BS (CMP IN PLC) (TY A GR SY 69,194.000 -0.220 4.000 -0.88 2) (4") 225 0500 MOBILIZATION LS 1.000 0.100 110,000.000 11,000.00 335 0672 REFL PAV MRKR TY II-A-A EA 524.000 -1.000 4.110 -4.11 --------------- - TOTAL BID ITEMS DONE THIS ESTIMATE - $ 10,981.82 0 TOTAL AMOUNT WORK DONE TO DATE - $ 1,141,050.92