Tabulation of Bids for Project STP 1702(401)HES

Last Update: Thursday, September 07, 2017
Text version of this page
County:WICHITALet Date:06/06/17
Type:INTALL MEDIAN BARRIERSeq No:3038
Time:85 WORKING DAYSProject ID:STP 1702(401)HES
Highway:IH 44Contract #:06173038
Length:2.500CCSJ:0156-07-109
Limits: 
From:0.023 MI. S OF SH 240Check:$21,000
To:OKLAHOMA STATE LINEMisc Cost:$10,000.00
Estimate$1,052,495.95% Over/UnderCompany
Bidder 1$1,167,403.50+10.92%HJC FARMS, INC.
Bidder 2$1,181,006.33+12.21%3LW CIVIL LLC
Bidder 3$1,219,937.30+15.91%MASSANA CONSTRUCTION INC.
Bidder 4$1,290,401.70+22.60%SCR CIVIL CONSTRUCTION, LLC
Bidder 5$1,304,792.50+23.97%EARTH BUILDERS, L.P.
Bidder 6$1,333,791.50+26.73%FNH CONSTRUCTION, LLC
Bidder 7$1,413,358.48+34.29%O. TREVINO CONSTRUCTION, LLC
Bidder 8$1,535,732.78+45.91%A. L. HELMCAMP, INC.
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1326003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY535.00030.001
2
3
4
5
6
7
8
30.000
55.000
50.000
55.000
65.000
35.000
101.000
33.000
1646071BROADCAST SEED (TEMP)(WARM OR COOL)SY19,020.0000.801
2
3
4
5
6
7
8
1.000
0.100
2.000
0.100
0.500
0.500
0.150
0.120
1686001VEGETATIVE WATERINGMG241.41025.001
2
3
4
5
6
7
8
50.000
99.500
30.000
100.000
50.000
50.000
18.000
18.000
3606002CONC PVMT (CONT REINF - CRCP) (8")SY452.00065.001
2
3
4
5
6
7
8
200.000
150.000
400.000
155.000
170.000
125.000
95.000
130.000
4326046RIPRAP (MOW STRIP)(5 IN)CY942.700400.001
2
3
4
5
6
7
8
475.000
500.000
300.000
595.000
520.000
600.000
478.000
720.000
5006001MOBILIZATIONLS1.00074,999.701
2
3
4
5
6
7
8
30,000.000
50,000.000
50,000.000
129,000.000
120,000.000
130,000.000
141,000.000
150,000.000
5026001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO5.0008,000.001
2
3
4
5
6
7
8
3,500.000
20,000.000
20,000.000
4,000.000
5,000.000
8,500.000
28,800.000
21,000.000
5066037003SANDBAGS FOR EROSION CONTROL (12")LF120.00019.501
2
3
4
5
6
7
8
10.000
6.500
10.000
6.900
12.000
20.000
9.500
20.000
5066041003BIODEG EROSN CONT LOGS (INSTL) (12")LF400.0009.001
2
3
4
5
6
7
8
10.000
4.500
10.000
4.300
7.000
12.000
4.750
6.000
5066043003BIODEG EROSN CONT LOGS (REMOVE)LF400.0002.001
2
3
4
5
6
7
8
2.000
0.500
5.000
0.300
1.000
8.000
1.000
1.000
5146001PERM CTB (SGL SLOPE) (TY 1) (42 )LF1,015.00075.001
2
3
4
5
6
7
8
82.000
88.000
80.000
105.000
100.000
95.000
85.000
85.000
5406001MTL W-BEAM GD FEN (TIM POST)LF9,037.00018.001
2
3
4
5
6
7
8
16.500
17.000
25.000
15.600
23.000
17.500
26.000
20.000
5406006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA18.0001,700.001
2
3
4
5
6
7
8
1,875.000
1,694.030
1,500.000
1,900.000
2,000.000
1,500.000
1,795.000
2,200.000
5406016DOWNSTREAM ANCHOR TERMINAL SECTIONEA6.0001,100.001
2
3
4
5
6
7
8
925.000
1,137.490
1,400.000
930.000
1,100.000
1,000.000
1,495.000
1,200.000
5406018MTL BM GD FEN TRANS (NON - SYM)EA8.000650.001
2
3
4
5
6
7
8
825.000
731.630
900.000
950.000
1,100.000
1,000.000
1,015.000
1,400.000
5426001REMOVE METAL BEAM GUARD FENCELF9,452.0003.251
2
3
4
5
6
7
8
5.000
1.750
5.000
2.000
4.000
3.000
4.000
5.000
5426002REMOVE TERMINAL ANCHOR SECTIONEA6.000300.001
2
3
4
5
6
7
8
200.000
217.440
150.000
150.000
350.000
500.000
140.000
200.000
5436002CABLE BARRIER SYSTEM (TL-4)LF8,065.00013.001
2
3
4
5
6
7
8
17.000
9.000
8.000
10.200
8.000
12.500
11.300
9.000
5436020CABLE BARRIER TERMINAL SECTION (TL-4)EA4.0003,000.001
2
3
4
5
6
7
8
3,000.000
2,133.170
3,000.000
2,500.000
2,800.000
3,000.000
3,500.000
3,000.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA16.0002,500.001
2
3
4
5
6
7
8
2,400.000
2,200.000
2,200.000
2,000.000
2,500.000
2,000.000
2,400.000
2,400.000
5446003GUARDRAIL END TREATMENT (REMOVE)EA16.000500.001
2
3
4
5
6
7
8
300.000
282.120
250.000
300.000
350.000
500.000
250.000
600.000
5456005CRASH CUSH ATTEN (REMOVE)EA2.0001,000.001
2
3
4
5
6
7
8
1,000.000
914.770
1,000.000
1,000.000
3,000.000
1,000.000
730.000
750.000
6446068RELOCATE SM RD SN SUP&AM TY 10BWGEA1.000785.001
2
3
4
5
6
7
8
1,500.000
489.620
400.000
425.000
500.000
650.000
500.000
800.000
6586026INSTL DEL ASSM (D-SY)SZ (BRF)CTBEA53.00035.001
2
3
4
5
6
7
8
25.000
18.340
30.000
25.000
8.000
25.000
35.000
12.000
6586061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA190.00020.001
2
3
4
5
6
7
8
25.000
29.690
50.000
25.000
15.000
25.000
50.000
25.000